no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A case study in productivity-cost trade-off in the design of paced parallel production systems
|
Freiheit, T. |
|
2007 |
|
14 |
p. 3263-3288 |
article |
2 |
A comparison of cellular manufacturing research presumptions with practice
|
Marsh, Robert F. |
|
1999 |
|
14 |
p. 3119-3138 |
article |
3 |
A concurrent hierarchical evolution approach to assembly process planning
|
Guan, Q. |
|
2002 |
|
14 |
p. 3357-3374 |
article |
4 |
A fault-tolerant communication mechanism for cooperative robots
|
Haddad, Joyce El |
|
2004 |
|
14 |
p. 2793-2808 |
article |
5 |
A GA-based approach to machining operation sequencing for prismatic parts
|
Qiao, L. |
|
2000 |
|
14 |
p. 3283-3303 |
article |
6 |
A genetic algorithm based heuristic for adjacent paper-reel layout problem
|
Zhang, G. Q. |
|
2000 |
|
14 |
p. 3343-3356 |
article |
7 |
A genetic algorithm for solving the economic lot scheduling problem in flow shops
|
Huang, Jia-Yen |
|
2008 |
|
14 |
p. 3737-3761 |
article |
8 |
Agent-based multiple shop floor manufacturing scheduler
|
Khoo, L. P. |
|
2001 |
|
14 |
p. 3023-3040 |
article |
9 |
A hybrid case-based reasoning CAD system for injection mould design
|
Mok, C. K. |
|
2008 |
|
14 |
p. 3783-3800 |
article |
10 |
Algebraic approach for dependable logic control systems design
|
Roussel, J. M. |
|
2004 |
|
14 |
p. 2859-2876 |
article |
11 |
A longitudinal study of the impact of market requirements focus on manufacturing performance
|
Bozarth, Cecil |
|
2001 |
|
14 |
p. 3237-3252 |
article |
12 |
A matching pursuit approach to small drill bit breakage prediction
|
Fu, J. C. |
|
1999 |
|
14 |
p. 3247-3261 |
article |
13 |
A method for assessing the impact of product development on the company
|
Collaine, Anne |
|
2002 |
|
14 |
p. 3311-3336 |
article |
14 |
A method for the verification of a distributed and synchronized algorithm
|
Magniette, Frederic |
|
2004 |
|
14 |
p. 2757-2772 |
article |
15 |
A methodology of sculptured surface fitting from CMM measurement data
|
Zhongwei, Yin |
|
2003 |
|
14 |
p. 3375-3384 |
article |
16 |
A modified framework for modelling set-up carryover in the capacitated lotsizing problem
|
Gopalakrishnan, Mohan |
|
2000 |
|
14 |
p. 3421-3424 |
article |
17 |
A multi-agent-based intelligent STEP-NC controller for CNC machine tools
|
Lan, H. |
|
2008 |
|
14 |
p. 3887-3907 |
article |
18 |
A multi-objective fuzzy graph approach for modular formulation considering end-of-life issues
|
Li, Jianzhi |
|
2008 |
|
14 |
p. 4011-4033 |
article |
19 |
A multiple-criteria decision methodology for the make-or-buy problem
|
Padillo, Jose M. |
|
1999 |
|
14 |
p. 3203-3229 |
article |
20 |
An adaptive genetic clustering method for exploratory mining of feature vector and time series data
|
Liao, T. Warren |
|
2006 |
|
14 |
p. 2731-2748 |
article |
21 |
Analysing the PGM protocol with UPPAAL
|
Berard, Beatrice |
|
2004 |
|
14 |
p. 2773-2791 |
article |
22 |
An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers
|
Gershwin, Stanley B. |
|
2007 |
|
14 |
p. 3085-3111 |
article |
23 |
An empirical examination of response time, product variety and firm performance
|
Zhang, Xiang |
|
2007 |
|
14 |
p. 3135-3150 |
article |
24 |
A neural network procedure for kanban allocation in JIT production control systems
|
Savsar, Mehmet |
|
2000 |
|
14 |
p. 3247-3265 |
article |
25 |
An investigation on selection of simplified aggregate production planning strategies using MADM approaches
|
Chen, Yan-Kwang |
|
2003 |
|
14 |
p. 3359-3374 |
article |
26 |
An operational perspective of the relationships between the headquarters and the maquiladoras
|
Dowlatshahi, S. |
|
2005 |
|
14 |
p. 2949-2975 |
article |
27 |
An optimal batch size for an imperfect production system with quality assurance and rework
|
Ojha, D. |
|
2007 |
|
14 |
p. 3191-3214 |
article |
28 |
Applying a hybrid data-mining approach to prediction problems: a case of preferred suppliers prediction
|
Tseng, T. -L. |
|
2006 |
|
14 |
p. 2935-2954 |
article |
29 |
Applying fuzzy logic and constraint networks to a problem of manufacturing flexibility
|
Zukin, M. |
|
2001 |
|
14 |
p. 3253-3273 |
article |
30 |
A scheduling heuristics for distributed real-time embedded systems tolerant to processor and communication media failures
|
Girault, A. |
|
2004 |
|
14 |
p. 2877-2898 |
article |
31 |
A simple and effective heuristic for the resource constrained project scheduling problem
|
Depuy, Gail W. |
|
2001 |
|
14 |
p. 3275-3287 |
article |
32 |
A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication
|
Bahaji, N. |
|
2008 |
|
14 |
p. 3801-3824 |
article |
33 |
Association rule-generation algorithm for mining automotive warranty data
|
Buddhakulsomsiri, J. |
|
2006 |
|
14 |
p. 2749-2770 |
article |
34 |
A study of Manufacturing Resources Planning (MRPII) implementation in China
|
Zhao, Xiande |
|
2002 |
|
14 |
p. 3461-3478 |
article |
35 |
Automatic determination of bending sequences for sheet metal parts with parallel bends
|
Rico, J. C. |
|
2003 |
|
14 |
p. 3273-3299 |
article |
36 |
Book review
|
|
|
2001 |
|
14 |
p. 3289 |
article |
37 |
Book reviews
|
|
|
2002 |
|
14 |
p. 3479 |
article |
38 |
BPMN-based business process model feasibility analysis: a petri net approach
|
Ou-Yang, C. |
|
2008 |
|
14 |
p. 3763-3781 |
article |
39 |
Cash-flow-oriented buffer allocation in stochastic flow lines
|
Helber, Stefan |
|
2001 |
|
14 |
p. 3061-3083 |
article |
40 |
Cell design and loading in the presence of alternative routing
|
Lozano, S. |
|
1999 |
|
14 |
p. 3289-3304 |
article |
41 |
Churn detection via customer profile modelling
|
Qian, Zhiguang |
|
2006 |
|
14 |
p. 2913-2933 |
article |
42 |
Computing optimal ( s, S ) policies for inventory systems with a cut-off transaction size and the option of joint replenishment
|
Hollier, R. H. |
|
2002 |
|
14 |
p. 3375-3389 |
article |
43 |
Corrigendum
|
Viswanathan, S. |
|
2003 |
|
14 |
p. 3389 |
article |
44 |
DAKA: design activity knowledge acquisition through data-mining
|
Jin, Y. |
|
2006 |
|
14 |
p. 2813-2837 |
article |
45 |
Data fusion/data mining-based architecture for condition-based maintenance
|
Raheja, D. |
|
2006 |
|
14 |
p. 2869-2887 |
article |
46 |
Data mining applications in engineering design, manufacturing and logistics
|
Feng, J. C. -X. |
|
2006 |
|
14 |
p. 2689-2694 |
article |
47 |
Data reduction for multiple functional data with class information
|
Jung, UK |
|
2006 |
|
14 |
p. 2695-2710 |
article |
48 |
Determination of economic order quantities (EOQ) in an integrated material flow system
|
Choi, Soodong |
|
2000 |
|
14 |
p. 3203-3226 |
article |
49 |
Developing a Petri-net-based simulation model for a modified hierarchical shop floor control framework
|
Ou-Yang, C. |
|
1999 |
|
14 |
p. 3139-3167 |
article |
50 |
Development of Run-To-Run (R2R) controller for the multiple-input multiple-output (MIMO) system using fuzzy control theories
|
Fan, S.-K. S. |
|
2007 |
|
14 |
p. 3215-3243 |
article |
51 |
Diagnosing batch processes with insufficient fault data: generation of pseudo batches
|
Cho, H. -W. |
|
2005 |
|
14 |
p. 2997-3009 |
article |
52 |
Dispatching for make-to-order wafer fabs with machine-dedication and mask set-up characteristics
|
Wu, Muh-Cherng |
|
2008 |
|
14 |
p. 3993-4009 |
article |
53 |
Dynamic management of cutting tools for flexible and quality machining
|
Leung, Lawrence C. |
|
2000 |
|
14 |
p. 3385-3401 |
article |
54 |
Dynamic operator assignment based on shifting machine loading
|
Hung, Yi-Feng |
|
2000 |
|
14 |
p. 3403-3420 |
article |
55 |
Editorial
|
|
|
2004 |
|
14 |
p. 2737-2739 |
article |
56 |
Erratum
|
|
|
2002 |
|
14 |
p. 3481 |
article |
57 |
Evaluation and improvement of response time bounds for real-time applications under non-pre-emptive Fixed Priority Scheduling
|
Koubaa, A. |
|
2004 |
|
14 |
p. 2899-2913 |
article |
58 |
Flowshop-scheduling problems with makespan criterion: a review
|
Hejazi, S. Reza |
|
2005 |
|
14 |
p. 2895-2929 |
article |
59 |
Fuzzy adaptive networks in machining process modelling: dimensional error prediction for turning operations
|
Jiao, Y. |
|
2005 |
|
14 |
p. 2931-2948 |
article |
60 |
Fuzzy scheduling of a build-to-order supply chain
|
Demirli, Kudret |
|
2008 |
|
14 |
p. 3931-3958 |
article |
61 |
General heuristic procedures and solution strategies for FMS scheduling
|
Liu, J. |
|
1999 |
|
14 |
p. 3305-3333 |
article |
62 |
Generating synthetic data from marginal fitting for testing the efficacy of data-mining tools
|
Jeske, D. R. |
|
2006 |
|
14 |
p. 2711-2730 |
article |
63 |
Genetic algorithm for minimizing assembly variation in selective assembly
|
Kannan, Sm. |
|
2003 |
|
14 |
p. 3301-3313 |
article |
64 |
Genetic algorithms and simulated annealing for scheduling in agile manufacturing
|
Gaafar, L. K. |
|
2005 |
|
14 |
p. 3069-3085 |
article |
65 |
Global supplier selection: a fuzzy-AHP approach
|
Chan, Felix T. S. |
|
2008 |
|
14 |
p. 3825-3857 |
article |
66 |
Graph-based set-up planning and tolerance decomposition for computer-aided fixture design
|
Zhang, Y. |
|
2001 |
|
14 |
p. 3109-3126 |
article |
67 |
High performance loading robot design for a tool-delivery system
|
Gougar, H. |
|
2002 |
|
14 |
p. 3401-3424 |
article |
68 |
Hotelling's T2 control chart with variable sampling intervals
|
Aparisi, Francisco |
|
2001 |
|
14 |
p. 3127-3140 |
article |
69 |
IDMME 2004 BATH, UK
|
|
|
2003 |
|
14 |
p. 3391-3392 |
article |
70 |
Incremental cell formation considering alternative machines
|
Mahesh, O. |
|
2002 |
|
14 |
p. 3291-3310 |
article |
71 |
Integrated machining tool path planning using feature free spaces
|
Kim, Yong Se |
|
2003 |
|
14 |
p. 3237-3255 |
article |
72 |
Integrating ABM/TOC approaches for performance improvement: a framework and application
|
Gupta, Mahesh C. |
|
2002 |
|
14 |
p. 3225-3251 |
article |
73 |
Integrating data mining and rough set for customer group-based discovery of product configuration rules
|
Shao, X. -Y. |
|
2006 |
|
14 |
p. 2789-2811 |
article |
74 |
Intelligent tool path correction for improving profile accuracy in CNC turning
|
Suneel, T. S. |
|
2000 |
|
14 |
p. 3181-3202 |
article |
75 |
Interaction of design and operational parameters in periodic review kanban systems
|
Erhun, Feryal |
|
2003 |
|
14 |
p. 3315-3338 |
article |
76 |
Justification for the selection of a reconfigurable manufacturing system: a fuzzy analytical hierarchy based approach
|
Singh, R. K. |
|
2007 |
|
14 |
p. 3165-3190 |
article |
77 |
Learning-based adaptive controller for dynamic manufacturing cells
|
Sun, Y. L. |
|
2005 |
|
14 |
p. 3011-3025 |
article |
78 |
Machining fixture verification for linear fixture systems
|
Liu, Jack J. -X. |
|
2002 |
|
14 |
p. 3441-3459 |
article |
79 |
Maximizing the net present value of a project with linear time-dependent cash flows
|
Vanhoucke, M. |
|
2001 |
|
14 |
p. 3159-3181 |
article |
80 |
Mental models as a practical tool in the engineer's toolbox
|
Sinreich, David |
|
2005 |
|
14 |
p. 2977-2996 |
article |
81 |
Methods for the sequencing of sheet metal bending operations
|
Duflou, J. R. |
|
1999 |
|
14 |
p. 3185-3202 |
article |
82 |
Mining relevant information on the Web: a clique-based approach
|
Caramia, Massimiliano |
|
2006 |
|
14 |
p. 2771-2787 |
article |
83 |
Mixed integer programming for scheduling surface mount technology lines
|
Sawik, Tadeusz |
|
2001 |
|
14 |
p. 3219-3235 |
article |
84 |
Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment
|
Cakravastia, Andi |
|
2002 |
|
14 |
p. 3425-3440 |
article |
85 |
Modelling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry
|
Wang, K. -J. |
|
2003 |
|
14 |
p. 3217-3235 |
article |
86 |
Modelling, control and simulation of an IC wafer fabrication system: a generalized stochastic coloured timed Petri Net approach
|
Lin, Ming-Hung |
|
2000 |
|
14 |
p. 3305-3341 |
article |
87 |
Multi-level heterogeneous worker flexibility in a Dual Resource Constrained (DRC) job-shop
|
Felan, Joe T. |
|
2001 |
|
14 |
p. 3041-3059 |
article |
88 |
Multi-objective inventory control using electromagnetism-like meta-heuristic
|
Tsou, C. -S. |
|
2008 |
|
14 |
p. 3859-3874 |
article |
89 |
Online learning of the cause-and-effect knowledge of a manufacturing process
|
Baek, Jun-Geol |
|
2002 |
|
14 |
p. 3275-3290 |
article |
90 |
On the considerations for the design of an automated aircraft sheet metal component production loft generation system
|
Prasad, K. S. R. K. |
|
2005 |
|
14 |
p. 3045-3067 |
article |
91 |
Operational tactics and tenets of a new manufacturing paradigm 'instant customerisation'
|
Tang, Zhongjun |
|
2005 |
|
14 |
p. 2873-2894 |
article |
92 |
Optimal tolerance design by response surface methodology
|
Jeang, Angus |
|
1999 |
|
14 |
p. 3275-3288 |
article |
93 |
Optimization of multipass turning operations with genetic algorithms: a note
|
Chen, Mu-Chen |
|
2003 |
|
14 |
p. 3385-3388 |
article |
94 |
Part-family formation for cellular manufacturing: a case study at Harnischfeger
|
Seifoddini, Hamid |
|
1999 |
|
14 |
p. 3263-3273 |
article |
95 |
Peak management
|
Ronen, B. |
|
2001 |
|
14 |
p. 3183-3193 |
article |
96 |
Performance analysis of conjoined supply chains
|
Beamon, B. M. |
|
2001 |
|
14 |
p. 3195-3218 |
article |
97 |
Performance of Fuzzy ART neural network and hierarchical clustering for part-machine grouping based on operation sequences
|
Park, S. |
|
2003 |
|
14 |
p. 3185-3216 |
article |
98 |
Performance ranking of Asian lead frame firms: a slack-based method in data envelopment analysis
|
Chang, S. -Y. |
|
2008 |
|
14 |
p. 3875-3885 |
article |
99 |
Pragmatic approach for modular control synthesis and implementation
|
Gouyon, D. |
|
2004 |
|
14 |
p. 2839-2858 |
article |
100 |
Product and process design effort allocation in concurrent engineering
|
Cantamessa, Marco |
|
2000 |
|
14 |
p. 3131-3147 |
article |
101 |
Real-time recognition of control chart patterns in autocorrelated processes using a learning vector quantization network-based approach
|
Guh, R. -S. |
|
2008 |
|
14 |
p. 3959-3991 |
article |
102 |
Relating TQM, marketing and business performance: an exploratory study
|
Martinez-Lorente, Angel R. |
|
2000 |
|
14 |
p. 3227-3246 |
article |
103 |
Robust design of asynchronous flexible assembly systems
|
Bulgak, A. A. |
|
1999 |
|
14 |
p. 3169-3184 |
article |
104 |
Rough-set-based approach to manufacturing process document retrieval
|
Huang, C. -C. |
|
2006 |
|
14 |
p. 2889-2911 |
article |
105 |
Routing-based reactive scheduling policies for machine failures in dynamic job shops
|
Kutanoglu, E. |
|
2001 |
|
14 |
p. 3141-3158 |
article |
106 |
Scheduling in dial-indexed production lines
|
Grieco, A. |
|
2003 |
|
14 |
p. 3139-3158 |
article |
107 |
Sequence-dependent batch chemical scheduling with earliness and tardiness penalties
|
McGraw, Kenneth E. |
|
2001 |
|
14 |
p. 3085-3107 |
article |
108 |
Simultaneous versus sequential loading and scheduling of flexible assembly systems
|
Sawik, Tadeusz |
|
2000 |
|
14 |
p. 3267-3282 |
article |
109 |
Soft-computing-based approaches to the group technology problem: a state-of-the-art review
|
Venugopal, V. |
|
1999 |
|
14 |
p. 3335-3357 |
article |
110 |
Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
|
Tiwari, M. K. |
|
2000 |
|
14 |
p. 3357-3384 |
article |
111 |
Statistical process control subject to a labour resource constraint
|
Rohleder, Thomas R. |
|
2002 |
|
14 |
p. 3337-3356 |
article |
112 |
Strategic management/design approach to a job-shop production system
|
Matsui, M. |
|
2003 |
|
14 |
p. 3257-3271 |
article |
113 |
Supervised learning for change-point detection
|
Li, Fang |
|
2006 |
|
14 |
p. 2853-2868 |
article |
114 |
Supervisory control of marked graphs with partial observations
|
Achour, Z. |
|
2004 |
|
14 |
p. 2827-2838 |
article |
115 |
The effects of workforce heterogeneity on productivity in an experiential learning environment
|
Nembhard, David A. |
|
2008 |
|
14 |
p. 3909-3929 |
article |
116 |
The impact of ignored attributes on a CMS design
|
Choobineh, F. |
|
1999 |
|
14 |
p. 3231-3245 |
article |
117 |
The simple and multiple job assignment problems
|
Chauvet, F. |
|
2000 |
|
14 |
p. 3165-3179 |
article |
118 |
The tool TINA - Construction of abstract state spaces for petri nets and time petri nets
|
Berthomieu, B. |
|
2004 |
|
14 |
p. 2741-2756 |
article |
119 |
Three-dimensional random stacking of weakly heterogeneous palletization with demand requirements and stability measures
|
Abdou, G. |
|
2000 |
|
14 |
p. 3149-3163 |
article |
120 |
Tolerance transfer in sheet metal forming
|
Thimm, Georg |
|
2007 |
|
14 |
p. 3289-3309 |
article |
121 |
Tool-path generation for five-axis machining of free-form surfaces based on accessibility analysis
|
Xu, X. J. |
|
2002 |
|
14 |
p. 3253-3274 |
article |
122 |
Tool requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint
|
Kim, Yeong-Dae |
|
2003 |
|
14 |
p. 3339-3357 |
article |
123 |
Two- and three-dimensional part orientation by sensor-less grasping and pushing actions: use of the concept of 'attractive region in environment'
|
Qiao, Hong |
|
2003 |
|
14 |
p. 3159-3184 |
article |
124 |
Two-dimensional representation of machining geometry and tool path generation for ball-end milling of sculptured surfaces
|
Yoon, Joung-Hahn |
|
2007 |
|
14 |
p. 3151-3164 |
article |
125 |
Two-stage data mining for flaw identification in ceramics manufacture
|
Dengiz, Orhan |
|
2006 |
|
14 |
p. 2839-2851 |
article |
126 |
Using dispatching rules for job shop scheduling with due date-based objectives
|
Chiang, T. C. |
|
2007 |
|
14 |
p. 3245-3262 |
article |
127 |
Vendor selection in a modified re-buy situation using a strategy-aligned fuzzy approach
|
Chou, S.-Y. |
|
2007 |
|
14 |
p. 3113-3133 |
article |
128 |
Waste disposal and waste avoidance
|
Wiese, Harald |
|
2002 |
|
14 |
p. 3391-3400 |
article |
129 |
Weighted-loss-function CUSUM chart for monitoring mean and variance of a production process
|
Wu, Zhang |
|
2005 |
|
14 |
p. 3027-3044 |
article |