nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of one-stage and two-stage Bayesian processes in engineering decision-making
|
Maes, M. A. |
|
2007 |
|
2 |
p. 123-137 |
artikel |
2 |
A CONTINGENCY APPROACH TO CHOICE
|
Hall, Jim W. |
|
2002 |
|
2 |
p. 87-118 |
artikel |
3 |
A DATABASE SYSTEM FOR PAVEMENT CONDITION EVALUATION
|
Shen, Yung-Ching |
|
1993 |
|
2 |
p. 105-122 |
artikel |
4 |
ADDENDUM
|
|
|
1996 |
|
2 |
p. 1 |
artikel |
5 |
A DECISION SUPPORT SYSTEM FOR DROUGHT CHARACTERIZATION AND MANAGEMENT
|
Jain, Ashu |
|
2001 |
|
2 |
p. 105-140 |
artikel |
6 |
A fuzzy screening model for multiple attribute decision-making
|
Julien, Benoit |
|
1990 |
|
2 |
p. 102-114 |
artikel |
7 |
A GENETIC ALGORITHM FOR THE OPTIMAL DESIGN OF AXIALLY LOADED NON-PRISMATIC COLUMNS
|
Coello, C. A. Coello |
|
1996 |
|
2 |
p. 111-146 |
artikel |
8 |
A geotechnical engineering systems approach for arctic transportation facility planning and design
|
Vita, Charles L. |
|
1983 |
|
2 |
p. 58-62 |
artikel |
9 |
AGGREGATING EXPERT OPINIONS BY FUZZY ENTROPY METHOD
|
Juang, C. H. |
|
1992 |
|
2 |
p. 89-104 |
artikel |
10 |
A GRAPH-THEORETIC MODEL FOR FINITE ELEMENTS WITH SIDE VARIABLES
|
Maunder, E. A. W. |
|
1994 |
|
2 |
p. 111-141 |
artikel |
11 |
A GREY FUZZY LINEAR PROGRAMMING APPROACH FOR MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY
|
Huang, Guo H. |
|
1993 |
|
2 |
p. 123-146 |
artikel |
12 |
Alternative valuation of highway user delay costs
|
Trzcinski, Adam J. |
|
2007 |
|
2 |
p. 87-97 |
artikel |
13 |
ANALYSIS OF TIME HEADWAYS ON URBAN ROADS
|
Al-Ghamdi, Ali S. |
|
2002 |
|
2 |
p. 169-185 |
artikel |
14 |
An approach to teaching civil engineering systems
|
Ossenbruggen, Paul J. |
|
1985 |
|
2 |
p. 114-117 |
artikel |
15 |
AN APPROXIMATION TO BIVARIATE AND TRIVARIATE NORMAL INTEGRALS
|
Hong, H. P. |
|
1999 |
|
2 |
p. 115-127 |
artikel |
16 |
A NEW APPROACH FOR SITING LANDFILLS USING FUZZY SETS
|
Juang, C H. |
|
1995 |
|
2 |
p. 85-103 |
artikel |
17 |
An explicit algorithm for calculating operating parameters for water networks
|
Boulos, Paul F. |
|
1991 |
|
2 |
p. 115-122 |
artikel |
18 |
An implicit enumeration technique for the land acquisition problem
|
Diamond, James T. |
|
1991 |
|
2 |
p. 101-114 |
artikel |
19 |
An inexact stochastic quadratic programming method for municipal solid waste management
|
Li, Y. P. |
|
2008 |
|
2 |
p. 139-155 |
artikel |
20 |
AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY
|
Huang, G. H. |
|
2000 |
|
2 |
p. 95-118 |
artikel |
21 |
An integrated approach to the layout and design of water distribution networks
|
Goulter, I. C. |
|
1985 |
|
2 |
p. 104-113 |
artikel |
22 |
A Personal Tribute to Sir Karl Popper FRS, Professor of Logic and Scientific Method at the London School of Economics, 1949-1969, died on September 17th 1994 aged 92
|
Blockley, David |
|
1995 |
|
2 |
p. 179-180 |
artikel |
23 |
Application of fuzzy decision making: An evaluation
|
Johnston, Douglas M. |
|
1988 |
|
2 |
p. 87-92 |
artikel |
24 |
APPLICATION OF FUZZY RELATIONAL EQUATIONS IN TRANSPORT PROJECT EVALUATION
|
Smith, P. N. |
|
2000 |
|
2 |
p. 119-149 |
artikel |
25 |
Application of fuzzy sets theory to the saving based vehicle routing algorithm
|
Teodorovic, Dusan |
|
1991 |
|
2 |
p. 87-93 |
artikel |
26 |
A probabilistic approach for economic analysis of a shopping center in seismic zone
|
Ergonul, Sema |
|
2006 |
|
2 |
p. 57-63 |
artikel |
27 |
A PROBABILISTIC APPROACH FOR ESTIMATING TUNNELING DURATION
|
Bahrami, Shahin |
|
1998 |
|
2 |
p. 149-168 |
artikel |
28 |
AQUIFER PARAMETER ESTIMATION USING GENETIC ALGORITHMS AND NEURAL NETWORKS
|
Lingireddy, Srinivasa |
|
1998 |
|
2 |
p. 125-144 |
artikel |
29 |
A Review of: “Civil engineering systems: analysis and design” Alan A. Smith, Ernes Hinton and Roland W. Lewis John Wiley, Chichester, UK, 1983, 473pp, £14.95
|
Munro, J. |
|
1983 |
|
2 |
p. 109 |
artikel |
30 |
A Review of: “Coastal engineering research” Institution of Civil Engineers, Maritime Civil Engineering Group Thomas Telford, London, UK, 1985, 123 pp, £18.00
|
Linfoot, B. |
|
1987 |
|
2 |
p. 108 |
artikel |
31 |
A Review of: “Computers in construction planning and control” M. J. Jackson Allen & Unwin, London, UK, 1986, 188 pp £30.00 (hardback)
|
Sibbald, W. |
|
1987 |
|
2 |
p. 109 |
artikel |
32 |
A Review of: “Entropy & Energy Dissipation in Water Resources”, edited by V. P. Singh and M Fiorentino. Published by Kluwer Academic Publishers, P.O. Box 17, 3300 A A Dordrecht, The Netherlands. ISBN 0-7923-1696-7
|
Jowitt, P. W. |
|
1994 |
|
2 |
p. 159-160 |
artikel |
33 |
A Review of: “Environmental protection: standards compliance and costs”. Ed. T. J. Lack Ellis Horwood Ltd, Chichester, 1984, 329 pp.
|
Wishart, S. J. |
|
1987 |
|
2 |
p. 108-109 |
artikel |
34 |
A Review of: “Judgement in geotechnical engineering: The professional legacy of Ralph” B. Peck (Ed. John Dunnicliff and Don U. Deve). John Wiley, New York, USA, 1984, 332 pp, £49-45
|
Skempton, A. W. |
|
1985 |
|
2 |
p. 123 |
artikel |
35 |
A Review of: “Proceedings of the 5th International Congress, International Association of Engineering Geology, Buenos Aires, 20-25 October 1986, Volumes 2 and 3” A. A. Balkema, Rotterdam 1986-1988, four volumes, £148.50
|
Ingles, Owen G. |
|
1988 |
|
2 |
p. 111 |
artikel |
36 |
A Review of: “Research and development in expert systems” M. A. Bramer Cambridge University Press, Cambridge, UK, 1984, 228 pp, £17.50
|
Jenkins, W. O. |
|
1987 |
|
2 |
p. 109 |
artikel |
37 |
A Review of: “Statistical methods for engineers” R. H. McCuen Prentice Hall International, Hemel Hempstead, UK, 1985,439 pp, £44.20
|
Blockley, D. I. |
|
1985 |
|
2 |
p. 123 |
artikel |
38 |
A Review of: “Structural Reliability Analysis and Prediction” Robert E. Melchers Second Edition (John Wiley & Sons, ISBN 0-471-98771-9)
|
Wolfram, Julian |
|
2000 |
|
2 |
p. 175-176 |
artikel |
39 |
A rule-based expert system framework for small water systems: proof-of-concept
|
Jayanty, Suresh C. |
|
2008 |
|
2 |
p. 81-97 |
artikel |
40 |
A rule-based weighted rating system forconcrete culverts
|
Hadipriono, Fabian C. |
|
1988 |
|
2 |
p. 99-103 |
artikel |
41 |
A SIMPLE APPROACH TO MULTINORMAL INTEGRATION WITH APPLICATIONS TO THE SYSTEM RELIABILITY COMPUTATION
|
Pandey, M. D. |
|
1998 |
|
2 |
p. 89-105 |
artikel |
42 |
ASSESSING THE CAPACITY RELIABILITY OF AGEING WATER DISTRIBUTION SYSTEMS
|
Xu, Chengchao |
|
2003 |
|
2 |
p. 119-133 |
artikel |
43 |
A STOCHASTIC MODEL FOR RESERVOIR FLOOD OPERATION
|
Cruise, J. F. |
|
1996 |
|
2 |
p. 141-155 |
artikel |
44 |
A successive fuzzification technique and its application to pavement evaluation
|
Gunaratne, M. |
|
1988 |
|
2 |
p. 77-80 |
artikel |
45 |
Automated second moment analysis of systems with probabilistic constitutive components
|
Dickinson, Robert R. |
|
1990 |
|
2 |
p. 67-75 |
artikel |
46 |
Automatic image segmentation using fuzzy probability
|
Winslow, Douglas N. |
|
1988 |
|
2 |
p. 104-108 |
artikel |
47 |
Axially-symmetrical oscillation of a semi-infinite layered medium with complex damping
|
Langhaar, Henry L. |
|
1987 |
|
2 |
p. 101-106 |
artikel |
48 |
Bayesian analysis of the T-year events for flood data fitted by a three-parameter lognormal distribution
|
Lye, L. M. |
|
1988 |
|
2 |
p. 81-86 |
artikel |
49 |
Bayesian approach to proof loading of quasi-identical multi-components structural systems
|
Nishijima, K. |
|
2007 |
|
2 |
p. 111-121 |
artikel |
50 |
BOOKS RECEIVED
|
|
|
1985 |
|
2 |
p. 124 |
artikel |
51 |
CALENDAR
|
|
|
1995 |
|
2 |
p. 181-182 |
artikel |
52 |
CALENDAR
|
|
|
1985 |
|
2 |
p. 126-128 |
artikel |
53 |
CALENDAR
|
|
|
1993 |
|
2 |
p. 171-174 |
artikel |
54 |
CALENDAR
|
|
|
1983 |
|
2 |
p. 110-112 |
artikel |
55 |
CALENDAR
|
|
|
1987 |
|
2 |
p. 110-112 |
artikel |
56 |
CALENDAR
|
|
|
1988 |
|
2 |
p. 111-112 |
artikel |
57 |
CALENDAR
|
|
|
1990 |
|
2 |
p. 125 |
artikel |
58 |
CALENDAR
|
|
|
1994 |
|
2 |
p. 161 |
artikel |
59 |
CALENDAR
|
|
|
2001 |
|
2 |
p. 167-169 |
artikel |
60 |
CALENDAR
|
|
|
1992 |
|
2 |
p. 175-176 |
artikel |
61 |
CALENDAR
|
|
|
1986 |
|
2 |
p. 115-116 |
artikel |
62 |
CALENDAR
|
|
|
1991 |
|
2 |
p. 123 |
artikel |
63 |
CALENDAR
|
|
|
1999 |
|
2 |
p. 151-153 |
artikel |
64 |
CALENDAR
|
|
|
2000 |
|
2 |
p. 177-179 |
artikel |
65 |
CALENDER
|
|
|
1996 |
|
2 |
p. 165-166 |
artikel |
66 |
CALENDER
|
|
|
1998 |
|
2 |
p. 169-170 |
artikel |
67 |
CALENDER
|
|
|
1996 |
|
2 |
p. 169-171 |
artikel |
68 |
Combining human errors in structural risk analysis
|
Frangopol, Dan M. |
|
1986 |
|
2 |
p. 93-99 |
artikel |
69 |
CONFAULT-AN EXPERT SYSTEM FOR FAULT DIAGNOSIS IN REINFORCED CONCRETE STRUCTURES
|
Dias, W. P. S. |
|
1992 |
|
2 |
p. 147-160 |
artikel |
70 |
CONTROL OF CONSTRUCTION ACTIVITIES: I. SYSTEMS IDENTIFICATION
|
Ayyub, Bilal M. |
|
1992 |
|
2 |
p. 123-146 |
artikel |
71 |
CP-DSS: DECISION SUPPORT SYSTEM FOR CONTRACTOR PREQUALIFICATION
|
Ng, S. Thomas |
|
1995 |
|
2 |
p. 133-159 |
artikel |
72 |
DEMAND FORECASTING FOR WATER DISTRIBUTION SYSTEMS
|
Jowitt, Paul W. |
|
1992 |
|
2 |
p. 105-121 |
artikel |
73 |
DETERMINATION BY THE TAGUCHI METHOD OF OPTIMUM CONDITIONS FOR MECHANICAL PROPERTIES OF HIGH STRENGTH CONCRETE WITH ADMIXTURES OF SILICA FUME AND BLAST FURNACE SLAG
|
Turkmen, Ibrahim |
|
2003 |
|
2 |
p. 105-118 |
artikel |
74 |
DEVELOPMENT OF A DYNAMIC TRAFFIC SIMULATION MODEL IN A NEAR SYSTEM OPTIMAL ROUTE GUIDANCE SYSTEM
|
Faghrp, Ardeshir |
|
2002 |
|
2 |
p. 141-167 |
artikel |
75 |
Development of expert systems for a water filtration plant
|
Dandy, Graeme C. |
|
1991 |
|
2 |
p. 63-70 |
artikel |
76 |
DEVELOPMENT OF TWO TEST STATISTICS FOR THE ANALYSIS OF TRAFFIC ACCIDENT DEATHS FOR ELDERLY DRIVERS
|
Al-Ghamdi, Ali |
|
1995 |
|
2 |
p. 105-114 |
artikel |
77 |
Discussion of papers
|
Alkass, Sabah |
|
1988 |
|
2 |
p. 109-110 |
artikel |
78 |
Editorial
|
Maes, Marc A. |
|
2007 |
|
2 |
p. 71-72 |
artikel |
79 |
Editorial
|
|
|
2004 |
|
2 |
p. 77-78 |
artikel |
80 |
EDITORIAL
|
|
|
1996 |
|
2 |
p. 91-92 |
artikel |
81 |
Effect of geometrical factors on stability characteristics of portal frames
|
Pietrzak, J. |
|
1990 |
|
2 |
p. 76-86 |
artikel |
82 |
Effects of spatial variability of glass strength in ring-on-ring tests
|
Reid, S. G. |
|
2007 |
|
2 |
p. 139-148 |
artikel |
83 |
Elastic mimicry of elasto-plastic responses
|
Hunt, G. W. |
|
1986 |
|
2 |
p. 100-108 |
artikel |
84 |
EMBEDDED RETAINING WALL DESIGN PROCEDURES: SYSTEM UNCERTAINTY AND FUZZY SAFETY MEASURES
|
Oliphant, J. |
|
1995 |
|
2 |
p. 161-177 |
artikel |
85 |
Environmental impact of rock excavation in urban areas: comparison between blasting and hydraulic breaker hammer
|
Torano, J. |
|
2006 |
|
2 |
p. 117-126 |
artikel |
86 |
Environmental systems analysis under uncertainty
|
Huang, G. H. |
|
2008 |
|
2 |
p. 77-80 |
artikel |
87 |
Evaluation of methods for decomposition of water distribution networks for reliability analysis
|
Jacobs, P. |
|
1988 |
|
2 |
p. 58-64 |
artikel |
88 |
EVALUATION OF THE PROBABILITY OF FAILURE WITH UNCERTAIN DISTRIBUTION PARAMETERS
|
Hong, Han Ping |
|
1996 |
|
2 |
p. 157-168 |
artikel |
89 |
EXPERT SYSTEM FOR ACTUATED CONTROL OF TRAFFIC AT ISOLATED INTERSECTIONS (EXACT), PART II: THE KNOWLEDGE BASE DEVELOPMENT
|
Al-Ghamdi, Ali |
|
1993 |
|
2 |
p. 89-103 |
artikel |
90 |
EXPERT SYSTEM OF ACTUATED CONTROL FOR TRAFFIC AT ISOLATED INTERSECTIONS (EXACT): PART III: TESTING AND EVALUATION
|
Al-Ghamdi, Ali |
|
1996 |
|
2 |
p. 147-164 |
artikel |
91 |
Fifth international conference on applications of statistics and probability in soil and structural engineering (ICASP-5)
|
Blockley, D. I. |
|
1987 |
|
2 |
p. 107 |
artikel |
92 |
Fractile constrained entropy estimation of distributions based on scarce data
|
Lind, Niels C. |
|
1990 |
|
2 |
p. 87-93 |
artikel |
93 |
From a structure to a tree
|
Elms, D. G. |
|
1983 |
|
2 |
p. 95-106 |
artikel |
94 |
Fuzzy logic in a geotechnical knowledge-based system: CONE
|
Mullarkey, Peter W. |
|
1986 |
|
2 |
p. 58-81 |
artikel |
95 |
GENERALIZED UNCERTAINTY IN STRUCTURAL RELIABILITY ASSESSMENT
|
Assistant, KWAN-LING LAI Research |
|
1994 |
|
2 |
p. 81-110 |
artikel |
96 |
Heavy axle study: impact of higher rail car weight limits on short-line railroad bridge structures
|
Leighty, Charles A. |
|
2004 |
|
2 |
p. 91-104 |
artikel |
97 |
HISTORIC AMERICAN COVERED BRIDGES
|
Mckee, Brian J. |
|
1998 |
|
2 |
p. 145-147 |
artikel |
98 |
Human error in steel beam design
|
Stewart, Mark G. |
|
1990 |
|
2 |
p. 94-101 |
artikel |
99 |
IFMEP: an interval fuzzy multiobjective environmental planning model for urban systems
|
Chen, Bing |
|
2008 |
|
2 |
p. 99-125 |
artikel |
100 |
IFTSIP: interval fuzzy two-stage stochastic mixed-integer linear programming: a case study for environmental management and planning
|
Li, Y. P. |
|
2006 |
|
2 |
p. 73-99 |
artikel |
101 |
Improving concrete placement simulation with a case-based reasoning input
|
Graham, Darren |
|
2004 |
|
2 |
p. 137-150 |
artikel |
102 |
IMPROVING DESIGN OF NATURAL DRAUGHT COOLING TOWERS AGAINST BUCKLING FAILURE
|
Li, Long-Yuan |
|
1994 |
|
2 |
p. 143-157 |
artikel |
103 |
INDEX: An INDustrial Building Design EXpert
|
Kumar, B. |
|
1988 |
|
2 |
p. 65-76 |
artikel |
104 |
INTEGRATION OF SOME CONSTITUTIVE RELATIONS OF PLANE STRAIN ELASTOPLASTICITY USING MODIFIED RUNGE-KUTTA METHODS
|
Papakaliatakis, G. |
|
1999 |
|
2 |
p. 77-92 |
artikel |
105 |
LEARNING OUTCOMES FROM CONSTRUCTION SIMULATION MODELING
|
Naresh, Arcot L. |
|
1999 |
|
2 |
p. 129-144 |
artikel |
106 |
LEVEL OF SERVICE OF URBAN ROADS BASED ON USERS' PERCEPTION
|
Pattnaik, S. B. |
|
1996 |
|
2 |
p. 87-110 |
artikel |
107 |
Logical analysis of assumptions in fatigue design
|
Henderson, J. R. |
|
1983 |
|
2 |
p. 88-94 |
artikel |
108 |
MANAGING THE UNCERTAINTY OF UNKNOWN RISKS
|
Dester, W. S. |
|
2003 |
|
2 |
p. 83-103 |
artikel |
109 |
MATHEMATICAL ANALYSIS OF TRUCKS BLOCKING ROADWAY SIGNS
|
Faghri, Ardeshir |
|
2000 |
|
2 |
p. 151-173 |
artikel |
110 |
Maximum entropy probability distributions for flood frequency analysis
|
Rao, A. Ramachandra |
|
1987 |
|
2 |
p. 67-76 |
artikel |
111 |
MODELING FOR SAFETY AGAINST FALLS FROM FORM SCAFFOLDING IN A VIRTUAL ENVIRONMENT
|
Hadipriono, Fabian C. |
|
2002 |
|
2 |
p. 119-139 |
artikel |
112 |
MODELLING AND EXPERIMENTATION OF THE CONCRETE SUPPLY AND DELIVERY PROCESS
|
Smith, Simon D. |
|
1999 |
|
2 |
p. 93-114 |
artikel |
113 |
New lifeline multiscenario seismic risk techniques with a model application
|
Taylor, C. E. |
|
1985 |
|
2 |
p. 77-83 |
artikel |
114 |
Numerical experience with diagonalization algorithms for asymmetric demand traffic assignment
|
Friesz, Terry L. |
|
1983 |
|
2 |
p. 63-68 |
artikel |
115 |
Obituary Professor John Munro
|
|
|
1985 |
|
2 |
p. 125 |
artikel |
116 |
On a group utility function for siting a nuclear power plant
|
Tamura, H. |
|
1983 |
|
2 |
p. 83-87 |
artikel |
117 |
On applications of artificial intelligence to the control and safety problems of nuclear power plants
|
Abbott, M. B. |
|
1983 |
|
2 |
p. 69-82 |
artikel |
118 |
On the equivalence of the (Eh/M/c) and (M/M/c) finite source queues
|
Carmichael, David G. |
|
1987 |
|
2 |
p. 87-93 |
artikel |
119 |
OPTIMAL BALANCE BETWEEN LAND DEVELOPMENT AND GROUNDWATER CONSERVATION IN AN UNCERTAIN COASTAL ENVIRONMENT
|
Yeh, Shin-Cheng |
|
2003 |
|
2 |
p. 61-81 |
artikel |
120 |
Optimal, reliability-based turbine placement in offshore wind turbine parks
|
Sørensen, J. D. |
|
2007 |
|
2 |
p. 99-109 |
artikel |
121 |
Optimal strategy for inspection and repair of structural systems
|
Thoft-Christensen, P. |
|
1987 |
|
2 |
p. 94-100 |
artikel |
122 |
Optimization models for development of acid rain abatement strategies
|
Ellis, J. Hugh |
|
1987 |
|
2 |
p. 58-66 |
artikel |
123 |
OPTIMIZATION OF STRUCTURAL FRAMES WITH ELASTIC AND PLASTIC CONSTRAINTS
|
Akbora, Baha Aydin |
|
1993 |
|
2 |
p. 147-169 |
artikel |
124 |
OSAKA CITY'S EARTHQUAKE PREPAREDNESS IMPROVEMENT MEASURES
|
Tsujie, Kenji |
|
2001 |
|
2 |
p. 91-104 |
artikel |
125 |
PLASTIC ANALYSIS BY MATHEMATICAL PROGRAMMING
|
Munro, John |
|
1996 |
|
2 |
p. 93-120 |
artikel |
126 |
Power change of a gas stream as an objective function for the control of large gas networks
|
Osiadacz, Andrzej J. |
|
1986 |
|
2 |
p. 109-113 |
artikel |
127 |
Prioritization of chemical carcinogenesis testing: the use of production data
|
Hakanoglu, Erol |
|
1985 |
|
2 |
p. 84-96 |
artikel |
128 |
Robust optimisation for inexact water quality management under uncertainty
|
Nie, X. H. |
|
2008 |
|
2 |
p. 167-184 |
artikel |
129 |
Scenariopolis: the civil engineering systems policy research laboratory
|
Drew, D. R. |
|
1985 |
|
2 |
p. 66-76 |
artikel |
130 |
Spatial variations in soil properties and their influence on structural reliability
|
Breysse, D. |
|
2007 |
|
2 |
p. 73-83 |
artikel |
131 |
Stochastic evaluation of the damage length in RC beams submitted to corrosion of reinforcing steel
|
Sudret, B. |
|
2007 |
|
2 |
p. 165-178 |
artikel |
132 |
STRATEGIC INFORMATION REQUIREMENTS IN CONTRACT BIDDING: FRAMEWORK FOR DEVELOPMENT OF A DECISION SUPPORT SYSTEM
|
Couzens, Alan |
|
1996 |
|
2 |
p. 121-139 |
artikel |
133 |
Structural failure determination with fuzzy sets
|
Bezdek, James C. |
|
1986 |
|
2 |
p. 82-92 |
artikel |
134 |
Systems analysis models for disinfection by-product formation in chlorinated drinking water in Ontario
|
Mcbean, Edward |
|
2008 |
|
2 |
p. 127-138 |
artikel |
135 |
TARGET LEVELS IN TRAFFIC SAFETY ANALYSIS
|
Seneviratne, Prianka N. |
|
1992 |
|
2 |
p. 161-173 |
artikel |
136 |
Teaching operations research and decision analysis to graduate students in water resources
|
Caselton, W. F. |
|
1985 |
|
2 |
p. 118-122 |
artikel |
137 |
The development and verification of a user oriented KBS for the conceptual design of bridges
|
Moore, C. J. |
|
1991 |
|
2 |
p. 81-86 |
artikel |
138 |
The effect of isochoric changes of portal frames on their natural frequencies
|
Pietrzak, Jacek |
|
1991 |
|
2 |
p. 95-100 |
artikel |
139 |
The influence of uncertainties on the selection of extreme values of environmental loads and events
|
Maes, Marc A. |
|
1990 |
|
2 |
p. 115-124 |
artikel |
140 |
The QED experience: knowledge elicitation in structural design
|
Sham, S. H. R. |
|
1991 |
|
2 |
p. 71-79 |
artikel |
141 |
The use of Bayes networks in evaluating structural safety
|
Reed, D. A. |
|
1988 |
|
2 |
p. 93-98 |
artikel |
142 |
TIME-DEPENDENT RESISTANCE DETERIORATION IN PROBABILISTIC STRUCTURAL SYSTEMS
|
Chan, H. Y. |
|
1995 |
|
2 |
p. 115-132 |
artikel |
143 |
Total emission control for managing regional water quality: a game theoretic decision process
|
Tamura, Hiroyuki |
|
1985 |
|
2 |
p. 97-103 |
artikel |
144 |
Toward optimum control of the activated sludge process with reliability analysis
|
Ossenbruggen, Paul J. |
|
1987 |
|
2 |
p. 77-86 |
artikel |
145 |
Traffic-related air quality analysis and visualisation
|
Wang, Xinhao |
|
2008 |
|
2 |
p. 157-166 |
artikel |
146 |
UNCERTAINTIES OF ASPHALT LAYER THICKNESS DETERMINATION IN FLEXIBLE PAVEMENTS-INFLUENCE DIAGRAM APPROACH
|
Attoh-Okine, N. O. |
|
1998 |
|
2 |
p. 107-124 |
artikel |
147 |
Using DSM for modeling information flow in construction design projects
|
Oloufa, Amr A. |
|
2004 |
|
2 |
p. 105-125 |
artikel |
148 |
Utility of spatially variable damage performance indicators for improved safety and maintenance decisions of deteriorating infrastructure
|
Stewart, Mark G. |
|
2007 |
|
2 |
p. 149-163 |
artikel |
149 |
VULNERABILITY OF SYSTEMS
|
Agarwal, J. |
|
2001 |
|
2 |
p. 141-165 |
artikel |
150 |
“Wind Effects on Buildings and Structures” Edited by J. D. Riera and A. G. Davenport
|
Smith, G. H. |
|
1999 |
|
2 |
p. 145-150 |
artikel |
151 |
Workers' perceptions and awareness of noise pollution at construction sites in Kuwait
|
Koushki, P. A. |
|
2004 |
|
2 |
p. 127-136 |
artikel |