nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Analysis and simulation for a parallel drill point grinder
|
Li, Bing |
|
2005 |
30 |
3-4 |
p. 221-226 |
artikel |
2 |
Analytical travel time models for multi aisle automated storage and retrieval systems
|
Lerher, Tone |
|
2005 |
30 |
3-4 |
p. 340-356 |
artikel |
3 |
An integrated system for setting the optimal parameters in IC chip-package wire bonding processes
|
Hou, Tung-Hsu |
|
2005 |
30 |
3-4 |
p. 247-253 |
artikel |
4 |
Burr formation during micro via-hole punching process of ceramic and PET double layer sheet
|
Rhim, S. H. |
|
2005 |
30 |
3-4 |
p. 227-232 |
artikel |
5 |
Determining optimal combination of genetic operators for flow shop scheduling
|
Wang, Ling |
|
2005 |
30 |
3-4 |
p. 302-308 |
artikel |
6 |
Developing an agent-based PDM/ERP collaboration system
|
Ou-Yang, C. |
|
2005 |
30 |
3-4 |
p. 369-384 |
artikel |
7 |
Electro-magnetically actuated valveless micropump with two flexible diaphragms
|
Yufeng, Su |
|
2005 |
30 |
3-4 |
p. 215-220 |
artikel |
8 |
GA based heuristic for the open job shop scheduling problem
|
Senthilkumar, P. |
|
2006 |
30 |
3-4 |
p. 297-301 |
artikel |
9 |
Generating efficient tool paths from point cloud data via machining area segmentation
|
Teng, Zhengji |
|
2005 |
30 |
3-4 |
p. 254-260 |
artikel |
10 |
Making decision to evaluate process capability index Cp with fuzzy numbers
|
Tsai, Chang-Chun |
|
2005 |
30 |
3-4 |
p. 334-339 |
artikel |
11 |
Monitoring capability study and genetic economic design of X-bar control chart
|
Shiau, Yau-Ren |
|
2005 |
30 |
3-4 |
p. 273-278 |
artikel |
12 |
Multiple stiffness topology optimizations of continuum structures
|
Luo, Zhen |
|
2005 |
30 |
3-4 |
p. 203-214 |
artikel |
13 |
Optimal actuator sizing and end point deformation for mobile robotic manipulators with elastic joint based on load criteria
|
Korayem, M. H. |
|
2005 |
30 |
3-4 |
p. 357-368 |
artikel |
14 |
Optimal number of production corrections before maintenance of imperfect production processes
|
Sheu, Shey-Huei |
|
2006 |
30 |
3-4 |
p. 319-327 |
artikel |
15 |
Optimization of manufacturing cell formation with a multi-functional mathematical programming model
|
Tsai, Chang-Chun |
|
2006 |
30 |
3-4 |
p. 309-318 |
artikel |
16 |
Path planning effect for the accuracy of rapid prototyping system
|
Huang, You-Min |
|
2005 |
30 |
3-4 |
p. 233-246 |
artikel |
17 |
Scheduling flexible manufacturing systems using parallelization of multi-objective evolutionary algorithms
|
Saravana Sankar, S. |
|
2005 |
30 |
3-4 |
p. 279-285 |
artikel |
18 |
Sequencing of an M machine flow shop with setup, processing and removal times separated
|
Yip, Yukling |
|
2005 |
30 |
3-4 |
p. 286-296 |
artikel |
19 |
Simultaneous optimal selection of design and manufacturing tolerances with different stack-up conditions using scatter search
|
Krishna, Alluru Gopala |
|
2006 |
30 |
3-4 |
p. 328-333 |
artikel |
20 |
The study of structural system dynamic problems by recursive estimation method
|
Deng, Shigan |
|
2006 |
30 |
3-4 |
p. 195-202 |
artikel |
21 |
Updating 3D triangular mesh models based on locally added point clouds
|
Woo, H. |
|
|
30 |
3-4 |
p. 261-272 |
artikel |
22 |
Updating 3D triangular mesh models based on locally added point clouds
|
Woo, H. |
|
2005 |
30 |
3-4 |
p. 261-272 |
artikel |