nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bayesian network for burr detection in the drilling process
|
Ferreiro, Susana |
|
2011 |
23 |
5 |
p. 1463-1475 |
artikel |
2 |
A framework for collaboration moderator services to support knowledge based collaboration
|
Swarnkar, R. |
|
2011 |
23 |
5 |
p. 2003-2023 |
artikel |
3 |
A framework for ontology based decision support system for e-learning modules, business modeling and manufacturing systems
|
Bhattacharya, Arnab |
|
2010 |
23 |
5 |
p. 1763-1781 |
artikel |
4 |
A framework for variation visualization and understanding in complex manufacturing systems
|
Wells, Lee J. |
|
2011 |
23 |
5 |
p. 2025-2036 |
artikel |
5 |
A fuzzy ANP model for supplier selection as applied to IC packaging
|
Kang, He-Yau |
|
2010 |
23 |
5 |
p. 1477-1488 |
artikel |
6 |
A method for grinding removal control of a robot belt grinding system
|
Song, Yixu |
|
2011 |
23 |
5 |
p. 1903-1913 |
artikel |
7 |
An adaptive artificial immune system for fault classification
|
Aydin, Ilhan |
|
2010 |
23 |
5 |
p. 1489-1499 |
artikel |
8 |
An information system to support the engineering designer
|
Crowder, Richard |
|
2010 |
23 |
5 |
p. 1545-1558 |
artikel |
9 |
An integrated approach to optimise parameter design of multi-response processes based on Taguchi method and artificial intelligence
|
Sibalija, Tatjana V. |
|
2010 |
23 |
5 |
p. 1511-1528 |
artikel |
10 |
An integrated replenishment model with quantity discounts, reentry and downward substitution for control wafers
|
Kang, He-Yau |
|
2010 |
23 |
5 |
p. 1745-1761 |
artikel |
11 |
Ant colony algorithms for a two-agent scheduling with sum-of processing times-based learning and deteriorating considerations
|
Wu, Wen-Hsiang |
|
2011 |
23 |
5 |
p. 1985-1993 |
artikel |
12 |
A robust approach for root causes identification in machining processes using hybrid learning algorithm and engineering knowledge
|
Du, Shichang |
|
2010 |
23 |
5 |
p. 1833-1847 |
artikel |
13 |
A soft computing system using intelligent imputation strategies for roughness prediction in deep drilling
|
Grzenda, Maciej |
|
2010 |
23 |
5 |
p. 1733-1743 |
artikel |
14 |
Automatic discovery of the root causes for quality drift in high dimensionality manufacturing processes
|
Rokach, Lior |
|
2011 |
23 |
5 |
p. 1915-1930 |
artikel |
15 |
A variable neighborhood descent heuristic for the problem of makespan minimisation on unrelated parallel machines with setup times
|
Fleszar, Krzysztof |
|
2011 |
23 |
5 |
p. 1949-1958 |
artikel |
16 |
A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines
|
Bilyk, Andrew |
|
2010 |
23 |
5 |
p. 1621-1635 |
artikel |
17 |
A web services-based approach to develop a networked information integration service platform for gear enterprise
|
Yang, Jianjun |
|
2010 |
23 |
5 |
p. 1721-1732 |
artikel |
18 |
Communities of practice model driven knowledge management in multinational knowledge based enterprises
|
Chu, Mei-Tai |
|
2010 |
23 |
5 |
p. 1707-1720 |
artikel |
19 |
Cyclic scheduling of a robotic flexible cell with load lock and swap
|
Jolai, Fariborz |
|
2011 |
23 |
5 |
p. 1885-1891 |
artikel |
20 |
Developing a varietal GA with ESMA strategy for solving the pick and place problem in printed circuit board assembly line
|
Chang, Pei-Chann |
|
2010 |
23 |
5 |
p. 1589-1602 |
artikel |
21 |
Digital manufacturing market: a semantic web-based framework for agile supply chain deployment
|
Ameri, Farhad |
|
2010 |
23 |
5 |
p. 1817-1832 |
artikel |
22 |
2D qualitative shape matching applied to ceramic mosaic assembly
|
Museros, Lledó |
|
2011 |
23 |
5 |
p. 1973-1983 |
artikel |
23 |
Efficient immune algorithm for optimal allocations in series-parallel continuous manufacturing systems
|
Massim, Y. |
|
2010 |
23 |
5 |
p. 1603-1619 |
artikel |
24 |
Extracting performance rules of suppliers in the manufacturing industry: an empirical study
|
Chen, You-Shyang |
|
2011 |
23 |
5 |
p. 2037-2045 |
artikel |
25 |
Generation of reciprocating tool motion in 5-axis flank milling based on particle swarm optimization
|
Chu, Chih-Hsing |
|
2010 |
23 |
5 |
p. 1501-1509 |
artikel |
26 |
Genetic algorithm for rotary machine scheduling with dependent processing times
|
Huang, Jing |
|
2011 |
23 |
5 |
p. 1931-1948 |
artikel |
27 |
Heterarchical production control in manufacturing systems using the potential fields concept
|
Zbib, N. |
|
2010 |
23 |
5 |
p. 1649-1670 |
artikel |
28 |
Heuristics for puzzle-based storage systems driven by a limited set of automated guided vehicles
|
Alfieri, A. |
|
2010 |
23 |
5 |
p. 1695-1705 |
artikel |
29 |
Information channel diagrams: an approach for modelling information flows
|
Durugbo, Christopher |
|
2011 |
23 |
5 |
p. 1959-1971 |
artikel |
30 |
Intelligent design of a dynamic machine layout in uncertain environment of flexible manufacturing systems
|
Moslemipour, Ghorbanali |
|
2011 |
23 |
5 |
p. 1849-1860 |
artikel |
31 |
Invention principles and contradiction matrix for semiconductor manufacturing industry: chemical mechanical polishing
|
Sheu, D. Daniel |
|
2010 |
23 |
5 |
p. 1637-1648 |
artikel |
32 |
Makespan minimization for scheduling unrelated parallel machines with setup times
|
Ying, Kuo-Ching |
|
2010 |
23 |
5 |
p. 1795-1803 |
artikel |
33 |
Minimizing burr size in drilling using artificial neural network (ANN)-particle swarm optimization (PSO) approach
|
Gaitonde, V. N. |
|
2010 |
23 |
5 |
p. 1783-1793 |
artikel |
34 |
Modeling and adaptive force control of milling by using artificial techniques
|
Zuperl, U. |
|
2010 |
23 |
5 |
p. 1805-1815 |
artikel |
35 |
Optimized product data transmission in LOD-based collaborative design using P2P CAD streaming
|
Chu, Chih-Hsing |
|
2010 |
23 |
5 |
p. 1559-1571 |
artikel |
36 |
Performance improvement of a multi product assembly shop by integrated fuzzy simulation approach
|
Azadeh, A. |
|
2011 |
23 |
5 |
p. 1861-1883 |
artikel |
37 |
Predicting the depth of penetration and weld bead width from the infra red thermal image of the weld pool using artificial neural network modeling
|
Chokkalingham, S. |
|
2011 |
23 |
5 |
p. 1995-2001 |
artikel |
38 |
Prediction of cutting forces in 3-axes milling of sculptured surfaces directly from CAM tool path
|
Zeroudi, N. |
|
2010 |
23 |
5 |
p. 1573-1587 |
artikel |
39 |
Soft computing based on interval valued fuzzy ANP-A novel methodology
|
Vahdani, Behnam |
|
2010 |
23 |
5 |
p. 1529-1544 |
artikel |
40 |
Task-driven e-manufacturing resource configurable model
|
Zhang, Yingfeng |
|
2010 |
23 |
5 |
p. 1681-1694 |
artikel |
41 |
The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication
|
Wang, Chia-Nan |
|
2011 |
23 |
5 |
p. 2047-2056 |
artikel |
42 |
The use of fuzzy logic in product family development: literature review and opportunities
|
Agard, Bruno |
|
2010 |
23 |
5 |
p. 1445-1462 |
artikel |
43 |
The use of the Taguchi method with grey relational analysis and a neural network to optimize a novel GMA welding process
|
Lin, Hsuan-Liang |
|
2010 |
23 |
5 |
p. 1671-1680 |
artikel |
44 |
Using artificial intelligence to predict surface roughness in deep drilling of steel components
|
Bustillo, Andres |
|
2011 |
23 |
5 |
p. 1893-1902 |
artikel |