nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A survey on the resource-constrained project scheduling problem
|
Ozdamar, Linet |
|
1995 |
27 |
5 |
p. 574-586 |
artikel |
2 |
Discount strategies for one-time-only sales
|
Arcelus, F.J. |
|
1995 |
27 |
5 |
p. 625-633 |
artikel |
3 |
Dynamic control of imperfect component production for assembly operations
|
Gutierrez, Genaro J. |
|
1995 |
27 |
5 |
p. 669-678 |
artikel |
4 |
Error bound for the dynamic lot size model allowing speculative motive
|
Chen, Hsin-Der |
|
1995 |
27 |
5 |
p. 683-688 |
artikel |
5 |
Estimating flowtimes and setting due-dates in complex production systems
|
Lawrence, Stephen R. |
|
1995 |
27 |
5 |
p. 657-668 |
artikel |
6 |
Optimal design of the two-level distributed network with dual homing local connections
|
Kim, Hyun-Joon |
|
1995 |
27 |
5 |
p. 555-563 |
artikel |
7 |
Policy and cost approximations of two-echelon distribution systems with a procurement cost at the higher echelon
|
Matta, Khalil F. |
|
1995 |
27 |
5 |
p. 646-656 |
artikel |
8 |
Scheduling jobs with proportionate early/tardy penalties
|
Rachamadugu, Ram |
|
1995 |
27 |
5 |
p. 679-682 |
artikel |
9 |
Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems
|
Bai, S.X. |
|
1995 |
27 |
5 |
p. 599-617 |
artikel |
10 |
Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems
|
Bai, S.X. |
|
1995 |
27 |
5 |
p. 618-624 |
artikel |
11 |
Scheduling two job classes on parallel machines
|
Cheng, T.C.E. |
|
1995 |
27 |
5 |
p. 689-693 |
artikel |
12 |
Setting safety lead-times for purchased components in assembly systems: a general solution procedure
|
Shore, Haim |
|
1995 |
27 |
5 |
p. 638-645 |
artikel |
13 |
Simultaneous resource scheduling with batching to minimize weighted flow times
|
Dobson, Gregory |
|
1995 |
27 |
5 |
p. 587-598 |
artikel |
14 |
Single-machine lot-sizing with uniform yields and rigid demands: robustness of the optimal solution
|
Anily, Shoshana |
|
1995 |
27 |
5 |
p. 634-637 |
artikel |
15 |
The performance of rolling production schedules in a process industry
|
De Matta, Renato |
|
1995 |
27 |
5 |
p. 564-573 |
artikel |