nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Difference Method Applied to Engineering Economy
|
Mahoney, J. F. |
|
1985 |
17 |
2 |
p. 182-187 |
artikel |
2 |
A Future Value Approach to Determining Project Duration
|
Rosenblatt, Meir J. |
|
1985 |
17 |
2 |
p. 164-167 |
artikel |
3 |
A Grouping Algorithm for Qualitative Data with A Dichotomous Outcome Variable
|
Raz, Tzvi |
|
1985 |
17 |
2 |
p. 168-174 |
artikel |
4 |
A Multifactor Priority Rule for Jobshop Scheduling Using Computer Search
|
Bunnag, Panit |
|
1985 |
17 |
2 |
p. 141-146 |
artikel |
5 |
Bayesian Availability Using Gamma Distributed Priors
|
Kuo, Way |
|
1985 |
17 |
2 |
p. 132-140 |
artikel |
6 |
Designing a Production Line to Maximize Profit
|
Rosenblatt, Meir J. |
|
1985 |
17 |
2 |
p. 117-122 |
artikel |
7 |
Dimensional Analysis in an Industrial Engineering Setting
|
Mahoney, J. F. |
|
1985 |
17 |
2 |
p. 198-203 |
artikel |
8 |
Factors That Affect the Growth Rate of Equity Capital
|
Oakford, R. V. |
|
1985 |
17 |
2 |
p. 123-131 |
artikel |
9 |
Letter to the Editor
|
Spilatro, John A. |
|
1985 |
17 |
2 |
p. 204 |
artikel |
10 |
Multiproduct Optimal Batch Sizes with In-Process Inventories and Multi Work Centers
|
Bertrand, J. W. M. |
|
1985 |
17 |
2 |
p. 157-163 |
artikel |
11 |
On the Phase-Type Approximations of General Distributions
|
Altiok, Tayfur |
|
1985 |
17 |
2 |
p. 110-116 |
artikel |
12 |
Optimal Conversion to a New Production Technique Under Learning
|
Vickson, R. G. |
|
1985 |
17 |
2 |
p. 175-181 |
artikel |
13 |
Stochastic Dominance Relations in a Project Cost Problem
|
Mehrez, A. |
|
1985 |
17 |
2 |
p. 194-197 |
artikel |
14 |
The Acquisition of Automation Subject to Diminishing Returns
|
Gaimon, Cheryl |
|
1985 |
17 |
2 |
p. 147-156 |
artikel |
15 |
Unitary Manufacturing Cell Design with Random Product Feedback Flow
|
Seidmann, Abraham |
|
1985 |
17 |
2 |
p. 188-193 |
artikel |