Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             180 results found
no title author magazine year volume issue page(s) type
1 Achieving product variety through optimal choice of module variations Chakravarty, Amiya K.
2001
7 p. 587-598
article
2 Achieving product variety through optimal choice of module variations Amiya K. Chakravarty
2001
7 p. 587-598
12 p.
article
3 Achieving product variety through optimal choice of module variations Chakravarty, Amiya K.
2001
7 p. 587-598
article
4 A cyclic policy for the loading of multiple products on a vehicle with different compartment sizes Bukchin, Joseph
2004
7 p. 641-653
article
5 A decomposition method for multi-product kanban systems with setup times and lost sales Krieg, Georg N.
2002
7 p. 613-625
article
6 A decomposition method for multiproduct kanban systems with setup times and lost sales Georg N. Krieg
2002
7 p. 613-625
13 p.
article
7 A decomposition method for multi-product kanban systems with setup times and lost sales Krieg, Georg N.
2002
7 p. 613-625
article
8 A finite-memory algorithm for estimating the variance of the sample mean Song, Wheyming Tina
2007
7 p. 703-711
article
9 A five-class variance swapping rule for simulation experiments: A correlated-blocks design Song, Wheyming Tina
2007
7 p. 713-722
article
10 A Hybrid Inventory System with a Time Limit on Backorders Zhang, Guoqiang Peter
2003
7 p. 679-687
article
11 A knowledge acquisition model for selecting coordinate measuring machines using inductive learning Lin, Zone-Ching
2000
7 p. 573-583
article
12 A knowledge acquisition model for selecting coordinate measuring machines using inductive learning Zone-Ching Lin
2000
7 p. 573-583
11 p.
article
13 A knowledge acquisition model for selecting coordinate measuring machines using inductive learning Lin, Zone-Ching
2000
7 p. 573-583
article
14 A logistics scheduling model: scheduling and transshipment for two processing centers Qi, Xiangtong
2006
7 p. 537-546
article
15 A methodology for designing flexible cellular manufacturing systems Askin, Ronald G.
1997
7 p. 599-610
article
16 A methodology for designing flexible cellular manufacturing systems RONALD G. ASKIN
1997
7 p. 599-610
12 p.
article
17 A methodology for designing flexible cellular manufacturing systems Askin, Ronald G.
1997
7 p. 599-610
article
18 A metric for agility measurement in product development Sieger, David B.
2000
7 p. 637-645
article
19 A metric for agility measurement in product development David B. Sieger
2000
7 p. 637-645
9 p.
article
20 A metric for agility measurement in product development Sieger, David B.
2000
7 p. 637-645
article
21 An evaluation of worker cross training and flexible workdays in job shops Yang, Kum-Khiong
2007
7 p. 735-746
article
22 An industry-based study of cutting process capability representation requirements for an integrated simultaneous engineering workstation Naish, Jane C.
1997
7 p. 573-584
article
23 An industry-based study of cutting process capability representation requirements for an integrated simultaneous engineering workstation JANE C. NAISH
1997
7 p. 573-584
12 p.
article
24 An industry-based study of cutting process capability representation requirements for an integrated simultaneous engineering workstation Naish, Jane C.
1997
7 p. 573-584
article
25 An integrated process planning system using feature reasoning and space search-based optimization Khoshnevis, Behrokh
1999
7 p. 597-616
article
26 An integrated process planning system using feature reasoning and space search-based optimization BEHROKH KHOSHNEVIS
1999
7 p. 597-616
20 p.
article
27 An integrated process planning system using feature reasoning and space search-based optimization Khoshnevis, BEHROKH
1999
7 p. 597-616
article
28 Application of semi-definite programming to the design of multi-response experiments Atashgah, Ali Babapour
2007
7 p. 763-769
article
29 Approximating Performance Measures for a Network of Unreliable Machines Berman, Oded
2003
7 p. 665-677
article
30 A reexamination of the distance-based facility layout problem Bozer, Yavuz A.
1997
7 p. 549-560
article
31 A reexamination of the distance-based facility layout problem YAVUZ A. BOZER
1997
7 p. 549-560
12 p.
article
32 A reexamination of the distance-based facility layout problem Bozer, Yavuz A.
1997
7 p. 549-560
article
33 A review of: “Manufacturing Processes and Equipment” J. TLUSTY Prentice Hall, Upper Saddle River, NJ ISBN 0-201-49865-0 Raman, Shivakumar
2002
7 p. 647-648
article
34 A Review of:“Material Flow Systems in Manufacturing”J.M.A. Tanchoco (ed.)Chapman & Hall, 1994, 400 pp., $124.95, ISBN 0-412-49180-X Sarker, Bhaba R.
1997
7 p. 623
article
35 A Review of:“Principles of Process Planning: A Logical Approach”Gideon Halevi and Roland D. Weill Chapman & Hall, 1995, 400 pp., ISBN 0-412-54360-5 Dong, Jian
1997
7 p. 624-625
article
36 A review of: “SPIRAL” SPIRAL was developed by Marc Goetschalckx Industrial and Systems Engineering Department, Georgia Institute of Technology, Atlanta, GA, USA Heragu, Sunderesh S.
2000
7 p. 677
article
37 A Review of: “Static and Dynamic Neural Networks” Gupta, Madan M.
2005
7 p. 681-682
article
38 A Review of: “Virtual Reality Technology, 2nd edition” Burdea, Grigore
2005
7 p. 682-683
article
39 A theoretical framework and efficiency study of multivariate statistical process control charts Jiang, Wei
2008
7 p. 650-663
article
40 A virtual environment for training overhead crane operators: real-time implementation Wilson, Bruce H.
1998
7 p. 589-595
article
41 A virtual environment for training overhead crane operators: real-time implementation BRUCE H. WILSON
1998
7 p. 589-595
7 p.
article
42 A virtual environment for training overhead crane operators: real-time implementation Wilson, Bruce H.
1998
7 p. 589-595
article
43 A worker-based approach for modeling variability in task completion times Doerr, Kenneth H.
2000
7 p. 625-636
article
44 A worker-based approach for modeling variability in task completion times Kenneth H. Doerr
2000
7 p. 625-636
12 p.
article
45 A worker-based approach for modeling variability in task completion times Doerr, Kenneth H.
2000
7 p. 625-636
article
46 Base stock versus WIP cap in single-stage make-to-stock production-inventory systems Liberopoulos, George
2002
7 p. 627-636
article
47 Base stock versus WIP cap in singlestage maketostock productioninventory systems George Liberopoulos
2002
7 p. 627-636
10 p.
article
48 Base stock versus WIP cap in single-stage make-to-stock production–inventory systems Liberopoulos, George
2002
7 p. 627-636
article
49 Book Review: Manufacturing Processes and Equipment J. Tlusty
2002
7 p. 647-648
2 p.
article
50 Book Review: Manufacturing Processes and Equipment Tlusty, J.
2002
7 p. 647-648
article
51 Capacitated multicommodity network flow problems with piecewise linear concave costs Muriel, Ana
2004
7 p. 683-696
article
52 Circuit Card Assembly on Tandem Turret-Type Placement Machines Wilhelm, Wilbert E.
2003
7 p. 627-645
article
53 Complexity in manufacturing systems, Part 1: Analysis of static complexity Deshmukh, Abhijit V.
1998
7 p. 645-655
article
54 Complexity in manufacturing systems, Part 1: Analysis of static complexity ABHIJIT V. DESHMUKH
1998
7 p. 645-655
11 p.
article
55 Complexity in manufacturing systems, Part 1: Analysis of static complexity Deshmukh, Abhijit V.
1998
7 p. 645-655
article
56 Computer-aided optimization of multi—pass turning operations for continuous forms on CNC lathes Su, Chao-Ton
1999
7 p. 583-596
article
57 Computer-aided optimization of multi-pass turning operations for continuous forms on CNC lathes CHAO-TON SU
1999
7 p. 583-596
14 p.
article
58 Computer-aided optimization of multi-pass turning operations for continuous forms on CNC lathes Su, CHAO-TON
1999
7 p. 583-596
article
59 Conflict resolution in AGV systems Reveliotis, Spyros A.
2000
7 p. 647-659
article
60 Conflict resolution in AGV systems Spyros A. Reveliotis
2000
7 p. 647-659
13 p.
article
61 Conflict resolution in AGV systems Reveliotis, Spyros A.
2000
7 p. 647-659
article
62 Coordination of quantity and shelf-retention timing in the video movie rental industry Gerchak, Yigal
2006
7 p. 525-536
article
63 Cost and Throughput Modeling of Manual and Automated Order Fulfillment Systems Russell, Mardi L.
2003
7 p. 589-603
article
64 Cost minimization and workload balancing in printed circuit board assembly Hillier, Mark S.
2001
7 p. 547-557
article
65 Cost minimization and workload balancing in printed circuit board assembly Mark S. Hillier
2001
7 p. 547-557
11 p.
article
66 Cost minimization and workload balancing in printed circuit board assembly Hillier, Mark S.
2001
7 p. 547-557
article
67 Cutter-path generation using multiple cutting-tool sizes for 2-1/2D pocket machining Veeramani, Dharmaraj
2000
7 p. 661-675
article
68 Cutter-path generation using multiple cutting-tool sizes for 2-1/2D pocket machining Dharmaraj Veeramani
2000
7 p. 661-675
15 p.
article
69 Cutter-path generation using multiple cutting-tool sizes for 2-1/2D pocket machining Veeramani, Dharmaraj
2000
7 p. 661-675
article
70 Data input model for virtual reality-aided facility layout Zetu, Dan
1998
7 p. 597-620
article
71 Data input model for virtual reality-aided facility layout DAN ZETU
1998
7 p. 597-620
24 p.
article
72 Data input model for virtual reality-aided facility layout Zetu, Dan
1998
7 p. 597-620
article
73 Demand point aggregation analysis for a class of constrained location models: a penalty function approach Francis, Richard L.
2004
7 p. 601-609
article
74 Design for global manufacturing and assembly Taylor, G. Don
1997
7 p. 585-597
article
75 Design for global manufacturing and assembly G. DON TAYLOR
1997
7 p. 585-597
13 p.
article
76 Design for global manufacturing and assembly Taylor, G. Don
1997
7 p. 585-597
article
77 Design of collaboration framework for distributed CIM data activities Kim, Chang-Ouk
2001
7 p. 535-546
article
78 Design of collaboration framework for distributed CIM data activities Chang-Ouk Kim
2001
7 p. 535-546
12 p.
article
79 Design of collaboration framework for distributed CIM data activities Kim, Chang-Ouk
2001
7 p. 535-546
article
80 Design of flexible assembly line to minimize equipment cost Bukchin, Joseph
2000
7 p. 585-598
article
81 Design of flexible assembly line to minimize equipment cost Joseph Bukchin
2000
7 p. 585-598
14 p.
article
82 Design of flexible assembly line to minimize equipment cost Bukchin, Joseph
2000
7 p. 585-598
article
83 Design of product specifications and control policies in a single-stage production system Kouikoglou, Vassilis S.
2002
7 p. 591-600
article
84 Design of product specifications and control policies in a singlestage production system Vassilis S. Kouikoglou
2002
7 p. 591-600
10 p.
article
85 Design of product specifications and control policies in a single-stage production system Kouikoglou, Vassilis S.
2002
7 p. 591-600
article
86 Determining sequence and ready times in a remanufacturing system Stanfield, Paul M.
2006
7 p. 565-575
article
87 Determining the Importance Weights for the Customer Requirements in QFD Using a Fuzzy AHP with an Extent Analysis Approach Kwong, C. K.
2003
7 p. 619-626
article
88 Distribution-free multivariate process control based on log-linear modeling Qiu, Peihua
2008
7 p. 664-677
article
89 Economic lot scheduling with lost sales and setup times Faaland, Bruce H.
2004
7 p. 629-640
article
90 Erratum 2004
7 p. 709
article
91 Evaluation of minimum zone for flatness by normal plane method and simplex search Damodarasamy, Sampath
1999
7 p. 617-626
article
92 Evaluation of minimum zone for flatness by normal plane method and simplex search SAMPATH DAMODARASAMY
1999
7 p. 617-626
10 p.
article
93 Evaluation of minimum zone for flatness by normal plane method and simplex search Damodarasamy, SAMPATH
1999
7 p. 617-626
article
94 Evaluation of virtual reality interface for product shape designs Chu, Chi-Cheng P.
1998
7 p. 629-643
article
95 Evaluation of virtual reality interface for product shape designs CHI-CHENG P. CHU
1998
7 p. 629-643
15 p.
article
96 Evaluation of virtual reality interface for product shape designs Chu, Chi-cheng P.
1998
7 p. 629-643
article
97 Facility location under uncertainty: a review Snyder, Lawrence V.
2006
7 p. 547-564
article
98 Feature based quadrilateral mesh generation for sculptured surface products Hocknell, Alan
1999
7 p. 627-637
article
99 Feature based quadrilateral mesh generation for sculptured surface products ALAN HOCKNELL
1999
7 p. 627-637
11 p.
article
100 Feature based quadrilateral mesh generation for sculptured surface products Hocknell, ALAN
1999
7 p. 627-637
article
101 Forecasting service parts demand for a discontinued product Hong, Jung Sik
2008
7 p. 640-649
article
102 Grouping and placement of machine cells Heragu, Sunderesh S.
1997
7 p. 561-571
article
103 Grouping and placement of machine cells SUNDERESH S. HERAGU
1997
7 p. 561-571
11 p.
article
104 Grouping and placement of machine cells Heragu, Sunderesh S.
1997
7 p. 561-571
article
105 Initial allocation compensation algorithm for redundancy allocation: The scanning heuristic Ha, Chunghun
2008
7 p. 678-689
article
106 Intelligent agent modeling of an industrial warehousing problem Kim, Byung-In
2002
7 p. 601-612
article
107 Intelligent agent modeling of an industrial warehousing problem ByungIn Kim
2002
7 p. 601-612
12 p.
article
108 Intelligent agent modeling of an industrial warehousing problem Kim, Byung-In
2002
7 p. 601-612
article
109 Interactive simulation and visualization of massless, massed, and evaporating particles Diachin, Darin
1998
7 p. 621-628
article
110 Interactive simulation and visualization of massless, massed, and evaporating particles DARIN DIACHIN
1998
7 p. 621-628
8 p.
article
111 Interactive simulation and visualization of massless, massed, and evaporating particles Diachin, Darin
1998
7 p. 621-628
article
112 Landmark configuration for absolute positioning of autonomous vehicles Sinriech, David
2000
7 p. 613-624
article
113 Landmark configuration for absolute positioning of autonomous vehicles David Sinriech
2000
7 p. 613-624
12 p.
article
114 Landmark configuration for absolute positioning of autonomous vehicles Sinriech, David
2000
7 p. 613-624
article
115 Material Flow Systems in Manufacturing Bhaba R. Sarker
1997
7 p. 623-623
1 p.
article
116 Material Flow Systems in Manufacturing Sarker, Bhaba R.
1997
7 p. 623
article
117 Minimization of acquisition and operational costs in horizontal material handling system design Herrmann, J.W.
1999
7 p. 679-693
article
118 Minimization of acquisition and operational costs in horizontal material handling system design J.W. HERRMANN
1999
7 p. 679-693
15 p.
article
119 Minimization of acquisition and operational costs in horizontal material handling system design Herrmann, J. W.
1999
7 p. 679-693
article
120 Modeling and analysis of a manufacturing cell formation problem with fuzzy mixed-integer programming Tsai, Chang-Chun
1997
7 p. 533-547
article
121 Modeling and analysis of a manufacturing cell formation problem with fuzzy mixed-integer programming CHANG-CHUN TSAI
1997
7 p. 533-547
15 p.
article
122 Modeling and analysis of a manufacturing cell formation problem with fuzzy mixed-integer programming Tsai, Chang-Chun
1997
7 p. 533-547
article
123 Modeling and analysis of an unreliable flow line composed of parallel-machine stages Patchong, Alain
2001
7 p. 559-568
article
124 Modeling and analysis of an unreliable flow line composed of parallel-machine stages Alain Patchong
2001
7 p. 559-568
10 p.
article
125 Modeling and analysis of an unreliable flow line composed of parallel-machine stages Patchong, Alain
2001
7 p. 559-568
article
126 Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control Yang, Taho
2002
7 p. 637-646
article
127 Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control Taho Yang
2002
7 p. 637-646
10 p.
article
128 Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control Yang, Taho
2002
7 p. 637-646
article
129 Multi-resource routing with flexible tasks: an application in drayage operations Smilowitz, Karen
2006
7 p. 577-590
article
130 Noise smoothing for VR equipment in quaternions Hsieh, C. C.
1998
7 p. 581-587
article
131 Noise smoothing for VR equipment in quaternions C. C. HSIEH
1998
7 p. 581-587
7 p.
article
132 Noise smoothing for VR equipment in quaternions Hsieh, C. C.
1998
7 p. 581-587
article
133 On-line scheduling of multi-server batch operations Van Der Zee, Durk-Jouke
2001
7 p. 569-586
article
134 On-line scheduling of multi-server batch operations Durk-Jouke van der Zee
2001
7 p. 569-586
18 p.
article
135 On-line scheduling of multi-server batch operations van der Zee, Durk-Jouke
2001
7 p. 569-586
article
136 Optimal implementation and benefits of rolling inventory Muriel, Ana
2006
7 p. 591-603
article
137 Optimizing dock configuration and staffing in decentralized receiving Yano, Candace Arai
1998
7 p. 657-668
article
138 Optimizing dock configuration and staffing in decentralized receiving CANDACE ARAI YANO
1998
7 p. 657-668
12 p.
article
139 Optimizing dock configuration and staffing in decentralized receiving Yano, Candace Arai
1998
7 p. 657-668
article
140 Order selection and scheduling with leadtime flexibility Charnsirisakskul, Kasarin
2004
7 p. 697-707
article
141 Parallelism of continuous- and discrete-time production planning problems Khmelnitsky, Eugene
2004
7 p. 611-628
article
142 Prescribing the Content and Timing of Product Upgrades Wilhelm, Wilbert E.
2003
7 p. 647-663
article
143 Principles of Process Planning: A Logical Approach Jian (John) Dong
1997
7 p. 624-625
2 p.
article
144 Principles of Process Planning: A Logical Approach Dong, Jian John
1997
7 p. 624-625
article
145 Production flow control in a cell with groups of identical machines Maimon, Oded
2000
7 p. 599-611
article
146 Production flow control in a cell with groups of identical machines Oded Maimon
2000
7 p. 599-611
13 p.
article
147 Production flow control in a cell with groups of identical machines Maimon, Oded
2000
7 p. 599-611
article
148 Production planning for flexible flow systems with limited machine flexibility Lee, Heungsoon Felix
1998
7 p. 669-684
article
149 Production planning for flexible flow systems with limited machine flexibility HEUNGSOON FELIX LEE
1998
7 p. 669-684
16 p.
article
150 Production planning for flexible flow systems with limited machine flexibility Lee, Heungsoon Felix
1998
7 p. 669-684
article
151 Product modeling within the framework of the World Wide Web Roy, U.
1999
7 p. 667-677
article
152 Product modeling within the framework of the World Wide Web U. ROY
1999
7 p. 667-677
11 p.
article
153 Product modeling within the framework of the World Wide Web Roy, U.
1999
7 p. 667-677
article
154 Replenishment planning in discrete-time, capacitated, non-stationary, stochastic inventory systems Bollapragada, Ramesh
2006
7 p. 605-617
article
155 Review of: “Computer Integrated Manufacturing, From Concept” Roger Hannam Sodhi, M.
1998
7 p. 687-688
article
156 Review of: “Facilities Design”Sunderesh Heragu Egbelu, Pius J.
1998
7 p. 686
article
157 Review of:“Industrial Assembly” Shimon Y. Nof, Wilbert E. Wilhelm and Hans-Jurgen Warnecke Chapman & Hall Dallery, Yves
1998
7 p. 685
article
158 Selecting the best system when systems are revealed sequentially Hong, L. Jeff
2007
7 p. 723-734
article
159 Sensor-driven prognostic models for equipment replacement and spare parts inventory Elwany, Alaa H.
2008
7 p. 629-639
article
160 Setup and fixture planning in automated process planning systems Joneja, Ajay
1999
7 p. 653-665
article
161 Setup and fixture planning in automated process planning systems AJAY JONEJA
1999
7 p. 653-665
13 p.
article
162 Setup and fixture planning in automated process planning systems Joneja, AJAY
1999
7 p. 653-665
article
163 Software Review 2000
7 p. 677-677
1 p.
article
164 Software Review 2000
7 p. 677
article
165 Stability and performance of a double MEWMA controller for drifted MIMO systems Lee, Shui-Pin
2008
7 p. 690-705
article
166 Stability and resource allocation in project planning Leus, Roel
2004
7 p. 667-682
article
167 The impact of acceleration/deceleration on travel-time models in class-based automated S/R systems Wen, U.P.
2001
7 p. 599-608
article
168 The impact of acceleration/deceleration on travel-time models in class-based automated S/R systems U.P. Wen
2001
7 p. 599-608
10 p.
article
169 The impact of acceleration/deceleration on travel-time models in class-based automated S/R systems Wen, U.P.
2001
7 p. 599-608
article
170 The impact on rack configuration on the speed profile of the storage and retrieval machine Chang, Ding-Tsair
1997
7 p. 525-531
article
171 The impact on rack configuration on the speed profile of the storage and retrieval machine DING-TSAIR CHANG
1997
7 p. 525-531
7 p.
article
172 The impact on rack configuration on the speed profile of the storage and retrieval machine Chang, Ding-Tsair
1997
7 p. 525-531
article
173 The strip-packing problem for a boat manufacturing firm Lee, Heungsoon Felix
1999
7 p. 639-651
article
174 The strip-packing problem for a boat manufacturing firm HEUNGSOON FELIX LEE
1999
7 p. 639-651
13 p.
article
175 The strip-packing problem for a boat manufacturing firm Lee, HEUNGSOON FELIX
1999
7 p. 639-651
article
176 Two-echelon spare parts inventory system subject to a service constraint Caglar, Deniz
2004
7 p. 655-666
article
177 Using Ant Techniques to Solve the Assembly Line Balancing Problem McMullen, Patrick R.
2003
7 p. 605-617
article
178 Using tool life models to minimize processing time on a flexible machine Lamond, Bernard F.
1997
7 p. 611-621
article
179 Using tool life models to minimize processing time on a flexible machine BERNARD F. LAMOND
1997
7 p. 611-621
11 p.
article
180 Using tool life models to minimize processing time on a flexible machine Lamond, Bernard F.
1997
7 p. 611-621
article
                             180 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands