nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Column Generation Approach to Delivery Planning over Time with Inhomogeneous Service Providers and Service Interval Constraints
|
Boland, N. |
|
2001 |
108 |
1-4 |
p. 143-156 |
artikel |
2 |
Airline Base Schedule Optimisation by Flight Network Annealing
|
Mashford, J.S. |
|
2001 |
108 |
1-4 |
p. 293-313 |
artikel |
3 |
An Integrated Optimization Model for Train Crew Management
|
Ernst, A.T. |
|
2001 |
108 |
1-4 |
p. 211-224 |
artikel |
4 |
An Operations Research Approach to the Problem of the Sugarcane Selection
|
Calija, Vanja |
|
2001 |
108 |
1-4 |
p. 123-142 |
artikel |
5 |
An Optimization Based Approach to the Train Operator Scheduling Problem at Singapore MRT
|
Chew, Kim-Lin |
|
2001 |
108 |
1-4 |
p. 111-122 |
artikel |
6 |
Cane Railway Scheduling via Constraint Logic Programming: Labelling Order and Constraints in a Real-Life Application
|
Martin, Fae |
|
2001 |
108 |
1-4 |
p. 193-209 |
artikel |
7 |
Combining Constraint Programming and Linear Programming on an Example of Bus Driver Scheduling
|
de Silva, Amal |
|
2001 |
108 |
1-4 |
p. 277-291 |
artikel |
8 |
Elastic Constraint Branching, the Wedelin/Carmen Lagrangian Heuristic and Integer Programming for Personnel Scheduling
|
Mason, Andrew J. |
|
2001 |
108 |
1-4 |
p. 239-276 |
artikel |
9 |
How Airlines and Airports Recover from Schedule Perturbations: A Survey
|
Filar, Jerzy A. |
|
2001 |
108 |
1-4 |
p. 315-333 |
artikel |
10 |
Minimised Geometric Buchberger Algorithm for Integer Programming
|
Li, Qiang |
|
2001 |
108 |
1-4 |
p. 87-109 |
artikel |
11 |
Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty
|
Yeung, W.K. |
|
2001 |
108 |
1-4 |
p. 33-54 |
artikel |
12 |
Mission Planning for Regional Surveillance
|
John, Maria |
|
2001 |
108 |
1-4 |
p. 157-173 |
artikel |
13 |
One and Two Facility Network Design Revisited
|
Sastry, Trilochan |
|
2001 |
108 |
1-4 |
p. 19-31 |
artikel |
14 |
Parallel Interior Point Schemes for Solving Multistage Convex Programming
|
Hegland, M. |
|
2001 |
108 |
1-4 |
p. 75-85 |
artikel |
15 |
Preface
|
|
|
2001 |
108 |
1-4 |
p. 13-17 |
artikel |
16 |
Project Scheduling under Time Dependent Costs – A Branch and Bound Algorithm
|
Achuthan, N.R. |
|
2001 |
108 |
1-4 |
p. 55-74 |
artikel |
17 |
Supply Chain Optimisation in the Paper Industry
|
Philpott, Andrew |
|
2001 |
108 |
1-4 |
p. 225-237 |
artikel |
18 |
Two Issues in Setting Call Centre Staffing Levels
|
Chen, Bert P.K. |
|
2001 |
108 |
1-4 |
p. 175-192 |
artikel |