Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             18 results found
no title author magazine year volume issue page(s) type
1 A Column Generation Approach to Delivery Planning over Time with Inhomogeneous Service Providers and Service Interval Constraints Boland, N.
2001
108 1-4 p. 143-156
article
2 Airline Base Schedule Optimisation by Flight Network Annealing Mashford, J.S.
2001
108 1-4 p. 293-313
article
3 An Integrated Optimization Model for Train Crew Management Ernst, A.T.
2001
108 1-4 p. 211-224
article
4 An Operations Research Approach to the Problem of the Sugarcane Selection Calija, Vanja
2001
108 1-4 p. 123-142
article
5 An Optimization Based Approach to the Train Operator Scheduling Problem at Singapore MRT Chew, Kim-Lin
2001
108 1-4 p. 111-122
article
6 Cane Railway Scheduling via Constraint Logic Programming: Labelling Order and Constraints in a Real-Life Application Martin, Fae
2001
108 1-4 p. 193-209
article
7 Combining Constraint Programming and Linear Programming on an Example of Bus Driver Scheduling de Silva, Amal
2001
108 1-4 p. 277-291
article
8 Elastic Constraint Branching, the Wedelin/Carmen Lagrangian Heuristic and Integer Programming for Personnel Scheduling Mason, Andrew J.
2001
108 1-4 p. 239-276
article
9 How Airlines and Airports Recover from Schedule Perturbations: A Survey Filar, Jerzy A.
2001
108 1-4 p. 315-333
article
10 Minimised Geometric Buchberger Algorithm for Integer Programming Li, Qiang
2001
108 1-4 p. 87-109
article
11 Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty Yeung, W.K.
2001
108 1-4 p. 33-54
article
12 Mission Planning for Regional Surveillance John, Maria
2001
108 1-4 p. 157-173
article
13 One and Two Facility Network Design Revisited Sastry, Trilochan
2001
108 1-4 p. 19-31
article
14 Parallel Interior Point Schemes for Solving Multistage Convex Programming Hegland, M.
2001
108 1-4 p. 75-85
article
15 Preface 2001
108 1-4 p. 13-17
article
16 Project Scheduling under Time Dependent Costs – A Branch and Bound Algorithm Achuthan, N.R.
2001
108 1-4 p. 55-74
article
17 Supply Chain Optimisation in the Paper Industry Philpott, Andrew
2001
108 1-4 p. 225-237
article
18 Two Issues in Setting Call Centre Staffing Levels Chen, Bert P.K.
2001
108 1-4 p. 175-192
article
                             18 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands