nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A closed-loop detection and open-loop control strategy for booms of truck-mounted concrete pump
|
Sun, Xiaojie |
|
2013 |
31 |
C |
p. 265-273 9 p. |
artikel |
2 |
A Decision Support System for the determination of concession period length in transportation project under BOT contract
|
Yu, C.Y. |
|
2013 |
31 |
C |
p. 114-127 14 p. |
artikel |
3 |
A graph-based model for the identification of the impact of design changes
|
Isaac, S. |
|
2013 |
31 |
C |
p. 31-40 10 p. |
artikel |
4 |
A methodology for mobile crane lift path checking in heavy industrial projects
|
Lei, Zhen |
|
2013 |
31 |
C |
p. 41-53 13 p. |
artikel |
5 |
A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities
|
Koulinas, G.K. |
|
2013 |
31 |
C |
p. 169-175 7 p. |
artikel |
6 |
An object-oriented model to support healthcare facility information management
|
Lucas, Jason |
|
2013 |
31 |
C |
p. 281-291 11 p. |
artikel |
7 |
A novel approach to evaluate masonry arch stability on the basis of limit analysis theory and non-destructive geometric characterization
|
Riveiro, B. |
|
2013 |
31 |
C |
p. 140-148 9 p. |
artikel |
8 |
Automated construction progress measurement using a 4D building information model and 3D data
|
Kim, Changmin |
|
2013 |
31 |
C |
p. 75-82 8 p. |
artikel |
9 |
Automated steel bridge coating rust defect recognition method based on color and texture feature
|
Shen, Heng-Kuang |
|
2013 |
31 |
C |
p. 338-356 19 p. |
artikel |
10 |
Automatic creation of semantically rich 3D building models from laser scanner data
|
Xiong, Xuehan |
|
2013 |
31 |
C |
p. 325-337 13 p. |
artikel |
11 |
Automatic thermographic and RGB texture of as-built BIM for energy rehabilitation purposes
|
Lagüela, S. |
|
2013 |
31 |
C |
p. 230-240 11 p. |
artikel |
12 |
Automating the crack map detection process for machine operated crack sealer
|
Tsai, Yichang (James) |
|
2013 |
31 |
C |
p. 10-18 9 p. |
artikel |
13 |
Bucket trajectory classification of mining excavators
|
Tiwari, Rashi |
|
2013 |
31 |
C |
p. 128-139 12 p. |
artikel |
14 |
Building Information Modeling (BIM) partnering framework for public construction projects
|
Porwal, Atul |
|
2013 |
31 |
C |
p. 204-214 11 p. |
artikel |
15 |
Content-based text mining technique for retrieval of CAD documents
|
Yu, Wen-der |
|
2013 |
31 |
C |
p. 65-74 10 p. |
artikel |
16 |
Detecting abnormal and collusive bids in capped tendering
|
Ballesteros-Pérez, Pablo |
|
2013 |
31 |
C |
p. 215-229 15 p. |
artikel |
17 |
Development of a 4D object-based system for visualizing the risk information of construction projects
|
Kang, Leen Seok |
|
2013 |
31 |
C |
p. 186-203 18 p. |
artikel |
18 |
Development of hybrid optimisation method for Artificial Intelligence based bridge deterioration model — Feasibility study
|
Callow, Daniel |
|
2013 |
31 |
C |
p. 83-91 9 p. |
artikel |
19 |
Dynamic site layout planning through minimization of total potential energy
|
Andayesh, Mohsen |
|
2013 |
31 |
C |
p. 92-102 11 p. |
artikel |
20 |
ECA-based interoperability framework for intelligent building
|
Perumal, Thinagaran |
|
2013 |
31 |
C |
p. 274-280 7 p. |
artikel |
21 |
Editorial Board
|
|
|
2013 |
31 |
C |
p. IFC- 1 p. |
artikel |
22 |
Energy-efficient HVAC systems: Simulation–empirical modelling and gradient optimization
|
Vakiloroaya, V. |
|
2013 |
31 |
C |
p. 176-185 10 p. |
artikel |
23 |
Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors
|
Nassar, Khaled |
|
2013 |
31 |
C |
p. 158-168 11 p. |
artikel |
24 |
Incorporation of database approach into contractual issues: Methodology and practical guide for organizations
|
Chong, Heap-Yih |
|
2013 |
31 |
C |
p. 149-157 9 p. |
artikel |
25 |
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
|
Irizarry, Javier |
|
2013 |
31 |
C |
p. 241-254 14 p. |
artikel |
26 |
Measurement planning for circular cross-section tunnels using terrestrial laser scanning
|
Argüelles-Fraga, Ramón |
|
2013 |
31 |
C |
p. 1-9 9 p. |
artikel |
27 |
Non-linear optimization of track layouts in loop-sorting-systems
|
Sørensen, Søren E. |
|
2013 |
31 |
C |
p. 19-30 12 p. |
artikel |
28 |
Optimal utilization of interior building spaces for material procurement and storage in congested construction sites
|
Said, Hisham |
|
2013 |
31 |
C |
p. 292-306 15 p. |
artikel |
29 |
Preventive approach to determine sensor importance and maintenance requirements
|
Zhengwei, Li |
|
2013 |
31 |
C |
p. 307-312 6 p. |
artikel |
30 |
Proactive control system of condition of low-speed cement machinery
|
Rusinski, Eugeniusz |
|
2013 |
31 |
C |
p. 313-324 12 p. |
artikel |
31 |
Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects
|
Hasan, Shafiul |
|
2013 |
31 |
C |
p. 255-264 10 p. |
artikel |
32 |
Pseudo-elastic wire application in robotized cutting systems
|
Masood, Jawad |
|
2013 |
31 |
C |
p. 103-113 11 p. |
artikel |
33 |
System reliability theory based multiple-objective optimization model for construction projects
|
Tao, Ran |
|
2013 |
31 |
C |
p. 54-64 11 p. |
artikel |