Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             33 results found
no title author magazine year volume issue page(s) type
1 A closed-loop detection and open-loop control strategy for booms of truck-mounted concrete pump Sun, Xiaojie
2013
31 C p. 265-273
9 p.
article
2 A Decision Support System for the determination of concession period length in transportation project under BOT contract Yu, C.Y.
2013
31 C p. 114-127
14 p.
article
3 A graph-based model for the identification of the impact of design changes Isaac, S.
2013
31 C p. 31-40
10 p.
article
4 A methodology for mobile crane lift path checking in heavy industrial projects Lei, Zhen
2013
31 C p. 41-53
13 p.
article
5 A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities Koulinas, G.K.
2013
31 C p. 169-175
7 p.
article
6 An object-oriented model to support healthcare facility information management Lucas, Jason
2013
31 C p. 281-291
11 p.
article
7 A novel approach to evaluate masonry arch stability on the basis of limit analysis theory and non-destructive geometric characterization Riveiro, B.
2013
31 C p. 140-148
9 p.
article
8 Automated construction progress measurement using a 4D building information model and 3D data Kim, Changmin
2013
31 C p. 75-82
8 p.
article
9 Automated steel bridge coating rust defect recognition method based on color and texture feature Shen, Heng-Kuang
2013
31 C p. 338-356
19 p.
article
10 Automatic creation of semantically rich 3D building models from laser scanner data Xiong, Xuehan
2013
31 C p. 325-337
13 p.
article
11 Automatic thermographic and RGB texture of as-built BIM for energy rehabilitation purposes Lagüela, S.
2013
31 C p. 230-240
11 p.
article
12 Automating the crack map detection process for machine operated crack sealer Tsai, Yichang (James)
2013
31 C p. 10-18
9 p.
article
13 Bucket trajectory classification of mining excavators Tiwari, Rashi
2013
31 C p. 128-139
12 p.
article
14 Building Information Modeling (BIM) partnering framework for public construction projects Porwal, Atul
2013
31 C p. 204-214
11 p.
article
15 Content-based text mining technique for retrieval of CAD documents Yu, Wen-der
2013
31 C p. 65-74
10 p.
article
16 Detecting abnormal and collusive bids in capped tendering Ballesteros-Pérez, Pablo
2013
31 C p. 215-229
15 p.
article
17 Development of a 4D object-based system for visualizing the risk information of construction projects Kang, Leen Seok
2013
31 C p. 186-203
18 p.
article
18 Development of hybrid optimisation method for Artificial Intelligence based bridge deterioration model — Feasibility study Callow, Daniel
2013
31 C p. 83-91
9 p.
article
19 Dynamic site layout planning through minimization of total potential energy Andayesh, Mohsen
2013
31 C p. 92-102
11 p.
article
20 ECA-based interoperability framework for intelligent building Perumal, Thinagaran
2013
31 C p. 274-280
7 p.
article
21 Editorial Board 2013
31 C p. IFC-
1 p.
article
22 Energy-efficient HVAC systems: Simulation–empirical modelling and gradient optimization Vakiloroaya, V.
2013
31 C p. 176-185
10 p.
article
23 Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors Nassar, Khaled
2013
31 C p. 158-168
11 p.
article
24 Incorporation of database approach into contractual issues: Methodology and practical guide for organizations Chong, Heap-Yih
2013
31 C p. 149-157
9 p.
article
25 Integrating BIM and GIS to improve the visual monitoring of construction supply chain management Irizarry, Javier
2013
31 C p. 241-254
14 p.
article
26 Measurement planning for circular cross-section tunnels using terrestrial laser scanning Argüelles-Fraga, Ramón
2013
31 C p. 1-9
9 p.
article
27 Non-linear optimization of track layouts in loop-sorting-systems Sørensen, Søren E.
2013
31 C p. 19-30
12 p.
article
28 Optimal utilization of interior building spaces for material procurement and storage in congested construction sites Said, Hisham
2013
31 C p. 292-306
15 p.
article
29 Preventive approach to determine sensor importance and maintenance requirements Zhengwei, Li
2013
31 C p. 307-312
6 p.
article
30 Proactive control system of condition of low-speed cement machinery Rusinski, Eugeniusz
2013
31 C p. 313-324
12 p.
article
31 Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects Hasan, Shafiul
2013
31 C p. 255-264
10 p.
article
32 Pseudo-elastic wire application in robotized cutting systems Masood, Jawad
2013
31 C p. 103-113
11 p.
article
33 System reliability theory based multiple-objective optimization model for construction projects Tao, Ran
2013
31 C p. 54-64
11 p.
article
                             33 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands