nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A computer vision based rebar detection chain for automatic processing of concrete bridge deck GPR data
|
Asadi, Pouria |
|
|
112 |
C |
p. |
artikel |
2 |
An integrated UGV-UAV system for construction site data collection
|
Asadi, Khashayar |
|
|
112 |
C |
p. |
artikel |
3 |
Artificial intelligence in the AEC industry: Scientometric analysis and visualization of research activities
|
Darko, Amos |
|
|
112 |
C |
p. |
artikel |
4 |
A scene-adaptive descriptor for visual SLAM-based locating applications in built environments
|
Xu, Lichao |
|
|
112 |
C |
p. |
artikel |
5 |
Automated clash resolution for reinforcement steel design in concrete frames via Q-learning and Building Information Modeling
|
Liu, Jiepeng |
|
|
112 |
C |
p. |
artikel |
6 |
Automated dimensional quality assessment for formwork and rebar of reinforced concrete components using 3D point cloud data
|
Kim, Min-Koo |
|
|
112 |
C |
p. |
artikel |
7 |
Automated rigging design for heavy industrial lifts
|
MinayHashemi, SeyedMohammadAmin |
|
|
112 |
C |
p. |
artikel |
8 |
BIM compatibility and its differentiation with interoperability challenges as an innovation factor
|
Shirowzhan, Sara |
|
|
112 |
C |
p. |
artikel |
9 |
BIM log mining: Learning and predicting design commands
|
Pan, Yue |
|
|
112 |
C |
p. |
artikel |
10 |
Bridge damage: Detection, IFC-based semantic enrichment and visualization
|
Isailović, Dušan |
|
|
112 |
C |
p. |
artikel |
11 |
Chronographical spatiotemporal dynamic 4D planning
|
Mazars, Thibault |
|
|
112 |
C |
p. |
artikel |
12 |
Complete coverage path planning using reinforcement learning for Tetromino based cleaning and maintenance robot
|
Krishna Lakshmanan, Anirudh |
|
|
112 |
C |
p. |
artikel |
13 |
Context-based information generation for managing UAV-acquired data using image captioning
|
Bang, Seongdeok |
|
|
112 |
C |
p. |
artikel |
14 |
Data-driven decision-making for equipment maintenance
|
Ma, Zhiliang |
|
|
112 |
C |
p. |
artikel |
15 |
Data-driven predictive maintenance planning framework for MEP components based on BIM and IoT using machine learning algorithms
|
Cheng, Jack C.P. |
|
|
112 |
C |
p. |
artikel |
16 |
Deep learning for site safety: Real-time detection of personal protective equipment
|
Nath, Nipun D. |
|
|
112 |
C |
p. |
artikel |
17 |
Dense construction vehicle detection based on orientation-aware feature fusion convolutional neural network
|
Guo, Yapeng |
|
|
112 |
C |
p. |
artikel |
18 |
Design and simulation of an adaptable and compact impact pile driver
|
Yang, Shuyi |
|
|
112 |
C |
p. |
artikel |
19 |
4D modeling of soil surface during excavation using a solid-state 2D profilometer mounted on the arm of an excavator
|
Niskanen, Ilpo |
|
|
112 |
C |
p. |
artikel |
20 |
3D printing of a post-tensioned concrete girder designed by topology optimization
|
Vantyghem, Gieljan |
|
|
112 |
C |
p. |
artikel |
21 |
Editorial Board
|
|
|
|
112 |
C |
p. |
artikel |
22 |
Estimation of crowd flow and load on pedestrian bridges using machine learning with sensor fusion
|
Mustapha, S. |
|
|
112 |
C |
p. |
artikel |
23 |
Failure process of compressed self-compacting concrete modified with nanoparticles assessed by acoustic emission method
|
Niewiadomski, Paweł |
|
|
112 |
C |
p. |
artikel |
24 |
Generating straight skeleton-based navigation networks with Industry Foundation Classes for indoor way-finding
|
Fu, Meiqing |
|
|
112 |
C |
p. |
artikel |
25 |
IFC-based process mining for design authoring
|
Kouhestani, Sobhan |
|
|
112 |
C |
p. |
artikel |
26 |
Integrating and managing BIM in 3D web-based GIS for hydraulic and hydropower engineering projects
|
Zhang, Sherong |
|
|
112 |
C |
p. |
artikel |
27 |
Lifecycle information transformation and exchange for delivering and managing digital and physical assets
|
Succar, Bilal |
|
|
112 |
C |
p. |
artikel |
28 |
Multi-camera vision-based productivity monitoring of earthmoving operations
|
Kim, Jinwoo |
|
|
112 |
C |
p. |
artikel |
29 |
Physical exertion modeling for construction tasks using combined cardiorespiratory and thermoregulatory measures
|
Umer, Waleed |
|
|
112 |
C |
p. |
artikel |
30 |
Potential energy recovery method based on alternate recovery and utilization of multiple hydraulic cylinders
|
Jun, Gong |
|
|
112 |
C |
p. |
artikel |
31 |
Semi-automated generation of parametric BIM for steel structures based on terrestrial laser scanning data
|
Yang, Liu |
|
|
112 |
C |
p. |
artikel |
32 |
Task planning strategy and path similarity analysis for an autonomous excavator
|
Kim, Jeonghwan |
|
|
112 |
C |
p. |
artikel |
33 |
Using image pre-mapping for applications of monitoring electrical switchboards
|
Oliveira, J.V.P. |
|
|
112 |
C |
p. |
artikel |