| no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
| 1 |
A computer vision based rebar detection chain for automatic processing of concrete bridge deck GPR data
|
Asadi, Pouria |
|
|
112 |
C |
p. |
article |
| 2 |
An integrated UGV-UAV system for construction site data collection
|
Asadi, Khashayar |
|
|
112 |
C |
p. |
article |
| 3 |
Artificial intelligence in the AEC industry: Scientometric analysis and visualization of research activities
|
Darko, Amos |
|
|
112 |
C |
p. |
article |
| 4 |
A scene-adaptive descriptor for visual SLAM-based locating applications in built environments
|
Xu, Lichao |
|
|
112 |
C |
p. |
article |
| 5 |
Automated clash resolution for reinforcement steel design in concrete frames via Q-learning and Building Information Modeling
|
Liu, Jiepeng |
|
|
112 |
C |
p. |
article |
| 6 |
Automated dimensional quality assessment for formwork and rebar of reinforced concrete components using 3D point cloud data
|
Kim, Min-Koo |
|
|
112 |
C |
p. |
article |
| 7 |
Automated rigging design for heavy industrial lifts
|
MinayHashemi, SeyedMohammadAmin |
|
|
112 |
C |
p. |
article |
| 8 |
BIM compatibility and its differentiation with interoperability challenges as an innovation factor
|
Shirowzhan, Sara |
|
|
112 |
C |
p. |
article |
| 9 |
BIM log mining: Learning and predicting design commands
|
Pan, Yue |
|
|
112 |
C |
p. |
article |
| 10 |
Bridge damage: Detection, IFC-based semantic enrichment and visualization
|
Isailović, Dušan |
|
|
112 |
C |
p. |
article |
| 11 |
Chronographical spatiotemporal dynamic 4D planning
|
Mazars, Thibault |
|
|
112 |
C |
p. |
article |
| 12 |
Complete coverage path planning using reinforcement learning for Tetromino based cleaning and maintenance robot
|
Krishna Lakshmanan, Anirudh |
|
|
112 |
C |
p. |
article |
| 13 |
Context-based information generation for managing UAV-acquired data using image captioning
|
Bang, Seongdeok |
|
|
112 |
C |
p. |
article |
| 14 |
Data-driven decision-making for equipment maintenance
|
Ma, Zhiliang |
|
|
112 |
C |
p. |
article |
| 15 |
Data-driven predictive maintenance planning framework for MEP components based on BIM and IoT using machine learning algorithms
|
Cheng, Jack C.P. |
|
|
112 |
C |
p. |
article |
| 16 |
Deep learning for site safety: Real-time detection of personal protective equipment
|
Nath, Nipun D. |
|
|
112 |
C |
p. |
article |
| 17 |
Dense construction vehicle detection based on orientation-aware feature fusion convolutional neural network
|
Guo, Yapeng |
|
|
112 |
C |
p. |
article |
| 18 |
Design and simulation of an adaptable and compact impact pile driver
|
Yang, Shuyi |
|
|
112 |
C |
p. |
article |
| 19 |
4D modeling of soil surface during excavation using a solid-state 2D profilometer mounted on the arm of an excavator
|
Niskanen, Ilpo |
|
|
112 |
C |
p. |
article |
| 20 |
3D printing of a post-tensioned concrete girder designed by topology optimization
|
Vantyghem, Gieljan |
|
|
112 |
C |
p. |
article |
| 21 |
Editorial Board
|
|
|
|
112 |
C |
p. |
article |
| 22 |
Estimation of crowd flow and load on pedestrian bridges using machine learning with sensor fusion
|
Mustapha, S. |
|
|
112 |
C |
p. |
article |
| 23 |
Failure process of compressed self-compacting concrete modified with nanoparticles assessed by acoustic emission method
|
Niewiadomski, Paweł |
|
|
112 |
C |
p. |
article |
| 24 |
Generating straight skeleton-based navigation networks with Industry Foundation Classes for indoor way-finding
|
Fu, Meiqing |
|
|
112 |
C |
p. |
article |
| 25 |
IFC-based process mining for design authoring
|
Kouhestani, Sobhan |
|
|
112 |
C |
p. |
article |
| 26 |
Integrating and managing BIM in 3D web-based GIS for hydraulic and hydropower engineering projects
|
Zhang, Sherong |
|
|
112 |
C |
p. |
article |
| 27 |
Lifecycle information transformation and exchange for delivering and managing digital and physical assets
|
Succar, Bilal |
|
|
112 |
C |
p. |
article |
| 28 |
Multi-camera vision-based productivity monitoring of earthmoving operations
|
Kim, Jinwoo |
|
|
112 |
C |
p. |
article |
| 29 |
Physical exertion modeling for construction tasks using combined cardiorespiratory and thermoregulatory measures
|
Umer, Waleed |
|
|
112 |
C |
p. |
article |
| 30 |
Potential energy recovery method based on alternate recovery and utilization of multiple hydraulic cylinders
|
Jun, Gong |
|
|
112 |
C |
p. |
article |
| 31 |
Semi-automated generation of parametric BIM for steel structures based on terrestrial laser scanning data
|
Yang, Liu |
|
|
112 |
C |
p. |
article |
| 32 |
Task planning strategy and path similarity analysis for an autonomous excavator
|
Kim, Jeonghwan |
|
|
112 |
C |
p. |
article |
| 33 |
Using image pre-mapping for applications of monitoring electrical switchboards
|
Oliveira, J.V.P. |
|
|
112 |
C |
p. |
article |