nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An investigation of due-date assignment using workload information of a dynamic shop
|
Udo, Godwin |
|
1993 |
29 |
1 |
p. 89-101 13 p. |
artikel |
2 |
Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system
|
Egbelu, Pius J. |
|
1993 |
29 |
1 |
p. 49-64 16 p. |
artikel |
3 |
Cyclic machine loading, product allocation and lot sizing in an asbestos cement sheet factory
|
Awate, Prakash G. |
|
1993 |
29 |
1 |
p. 1-10 10 p. |
artikel |
4 |
Diary of events
|
|
|
1993 |
29 |
1 |
p. 123-124 2 p. |
artikel |
5 |
Editorial Board
|
|
|
1993 |
29 |
1 |
p. v-vii nvt p. |
artikel |
6 |
Failure predictions in repairable multi-component systems
|
Roberts Jr., W.T. |
|
1993 |
29 |
1 |
p. 103-110 8 p. |
artikel |
7 |
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
|
Rajendran, Chandrasekharan |
|
1993 |
29 |
1 |
p. 65-73 9 p. |
artikel |
8 |
Horizon extension for rolling production schedules: Length and accuracy requirements
|
Russell, R.A. |
|
1993 |
29 |
1 |
p. 111-122 12 p. |
artikel |
9 |
Methodology for converting a functional manufacturing system into a cellular manufacturing system
|
Logendran, Rasaratnam |
|
1993 |
29 |
1 |
p. 27-41 15 p. |
artikel |
10 |
Optimal buffer space for a periodic review production/inventory system with inventory-dependent production rate
|
Sung, C.S. |
|
1993 |
29 |
1 |
p. 11-25 15 p. |
artikel |
11 |
Publisher's note
|
|
|
1993 |
29 |
1 |
p. ix- 1 p. |
artikel |
12 |
Scrap minimization in production processes with stochastic outputs
|
Sounderpandian, Jayavel |
|
1993 |
29 |
1 |
p. 43-48 6 p. |
artikel |
13 |
Sequencing picking operations and travel time models for man-on-board storage and retrieval warehousing system
|
Hwang, Hark |
|
1993 |
29 |
1 |
p. 75-88 14 p. |
artikel |