Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             13 results found
no title author magazine year volume issue page(s) type
1 An investigation of due-date assignment using workload information of a dynamic shop Udo, Godwin
1993
29 1 p. 89-101
13 p.
article
2 Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system Egbelu, Pius J.
1993
29 1 p. 49-64
16 p.
article
3 Cyclic machine loading, product allocation and lot sizing in an asbestos cement sheet factory Awate, Prakash G.
1993
29 1 p. 1-10
10 p.
article
4 Diary of events 1993
29 1 p. 123-124
2 p.
article
5 Editorial Board 1993
29 1 p. v-vii
nvt p.
article
6 Failure predictions in repairable multi-component systems Roberts Jr., W.T.
1993
29 1 p. 103-110
8 p.
article
7 Heuristic algorithm for scheduling in a flowshop to minimize total flowtime Rajendran, Chandrasekharan
1993
29 1 p. 65-73
9 p.
article
8 Horizon extension for rolling production schedules: Length and accuracy requirements Russell, R.A.
1993
29 1 p. 111-122
12 p.
article
9 Methodology for converting a functional manufacturing system into a cellular manufacturing system Logendran, Rasaratnam
1993
29 1 p. 27-41
15 p.
article
10 Optimal buffer space for a periodic review production/inventory system with inventory-dependent production rate Sung, C.S.
1993
29 1 p. 11-25
15 p.
article
11 Publisher's note 1993
29 1 p. ix-
1 p.
article
12 Scrap minimization in production processes with stochastic outputs Sounderpandian, Jayavel
1993
29 1 p. 43-48
6 p.
article
13 Sequencing picking operations and travel time models for man-on-board storage and retrieval warehousing system Hwang, Hark
1993
29 1 p. 75-88
14 p.
article
                             13 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands