nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comprehensive review and evaluation of permutation flowshop heuristics
|
Ruiz, Rubén |
|
2005 |
165 |
2 |
p. 479-494 16 p. |
artikel |
2 |
A heuristic to schedule flexible job-shop in a glass factory
|
Alvarez-Valdes, R. |
|
2005 |
165 |
2 |
p. 525-534 10 p. |
artikel |
3 |
An introduction to multi-parameter complexity analysis of discrete problems
|
Sevastianov, S.V. |
|
2005 |
165 |
2 |
p. 387-397 11 p. |
artikel |
4 |
Complexity results for flow-shop problems with a single server
|
Brucker, Peter |
|
2005 |
165 |
2 |
p. 398-407 10 p. |
artikel |
5 |
Continuous filling and emptying of storage systems in constraint-based scheduling
|
Sourd, Francis |
|
2005 |
165 |
2 |
p. 510-524 15 p. |
artikel |
6 |
Editorial board
|
|
|
2005 |
165 |
2 |
p. IFC- 1 p. |
artikel |
7 |
Evolutionary algorithms for periodic arc routing problems
|
Lacomme, Philippe |
|
2005 |
165 |
2 |
p. 535-553 19 p. |
artikel |
8 |
Justification and RCPSP: A technique that pays
|
Valls, Vicente |
|
2005 |
165 |
2 |
p. 375-386 12 p. |
artikel |
9 |
Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach
|
Ghirardi, M. |
|
2005 |
165 |
2 |
p. 457-467 11 p. |
artikel |
10 |
Maximization of solution flexibility for robust shop scheduling
|
Artigues, Christian |
|
2005 |
165 |
2 |
p. 314-328 15 p. |
artikel |
11 |
Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem
|
Cheng, T.C.Edwin |
|
2005 |
165 |
2 |
p. 444-456 13 p. |
artikel |
12 |
Network decomposition-based benchmark results for the discrete time–cost tradeoff problem
|
Akkan, Can |
|
2005 |
165 |
2 |
p. 339-358 20 p. |
artikel |
13 |
New computational results for the discrete time/cost trade-off problem with time-switch constraints
|
Vanhoucke, Mario |
|
2005 |
165 |
2 |
p. 359-374 16 p. |
artikel |
14 |
On the fallacy of averages in project risk management
|
Elmaghraby, Salah E. |
|
2005 |
165 |
2 |
p. 307-313 7 p. |
artikel |
15 |
Positive half-products and scheduling with controllable processing times
|
Janiak, Adam |
|
2005 |
165 |
2 |
p. 416-422 7 p. |
artikel |
16 |
Project management and scheduling
|
Valls, Vicente |
|
2005 |
165 |
2 |
p. 285-288 4 p. |
artikel |
17 |
Project scheduling under uncertainty: Survey and research potentials
|
Herroelen, Willy |
|
2005 |
165 |
2 |
p. 289-306 18 p. |
artikel |
18 |
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
|
Neumann, Klaus |
|
2005 |
165 |
2 |
p. 495-509 15 p. |
artikel |
19 |
Scheduling UET-UCT outforests to minimize maximum lateness
|
Singh, Gaurav |
|
2005 |
165 |
2 |
p. 468-478 11 p. |
artikel |
20 |
Simple probability models for project contracting
|
Paul, Anand |
|
2005 |
165 |
2 |
p. 329-338 10 p. |
artikel |
21 |
Single machine scheduling to minimize total weighted tardiness
|
Cheng, T.C.E. |
|
2005 |
165 |
2 |
p. 423-443 21 p. |
artikel |
22 |
The two-machine flow-shop problem with weighted late work criterion and common due date
|
Błażewicz, Jacek |
|
2005 |
165 |
2 |
p. 408-415 8 p. |
artikel |