Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             22 results found
no title author magazine year volume issue page(s) type
1 A comprehensive review and evaluation of permutation flowshop heuristics Ruiz, Rubén
2005
165 2 p. 479-494
16 p.
article
2 A heuristic to schedule flexible job-shop in a glass factory Alvarez-Valdes, R.
2005
165 2 p. 525-534
10 p.
article
3 An introduction to multi-parameter complexity analysis of discrete problems Sevastianov, S.V.
2005
165 2 p. 387-397
11 p.
article
4 Complexity results for flow-shop problems with a single server Brucker, Peter
2005
165 2 p. 398-407
10 p.
article
5 Continuous filling and emptying of storage systems in constraint-based scheduling Sourd, Francis
2005
165 2 p. 510-524
15 p.
article
6 Editorial board 2005
165 2 p. IFC-
1 p.
article
7 Evolutionary algorithms for periodic arc routing problems Lacomme, Philippe
2005
165 2 p. 535-553
19 p.
article
8 Justification and RCPSP: A technique that pays Valls, Vicente
2005
165 2 p. 375-386
12 p.
article
9 Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach Ghirardi, M.
2005
165 2 p. 457-467
11 p.
article
10 Maximization of solution flexibility for robust shop scheduling Artigues, Christian
2005
165 2 p. 314-328
15 p.
article
11 Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem Cheng, T.C.Edwin
2005
165 2 p. 444-456
13 p.
article
12 Network decomposition-based benchmark results for the discrete time–cost tradeoff problem Akkan, Can
2005
165 2 p. 339-358
20 p.
article
13 New computational results for the discrete time/cost trade-off problem with time-switch constraints Vanhoucke, Mario
2005
165 2 p. 359-374
16 p.
article
14 On the fallacy of averages in project risk management Elmaghraby, Salah E.
2005
165 2 p. 307-313
7 p.
article
15 Positive half-products and scheduling with controllable processing times Janiak, Adam
2005
165 2 p. 416-422
7 p.
article
16 Project management and scheduling Valls, Vicente
2005
165 2 p. 285-288
4 p.
article
17 Project scheduling under uncertainty: Survey and research potentials Herroelen, Willy
2005
165 2 p. 289-306
18 p.
article
18 Scheduling of continuous and discontinuous material flows with intermediate storage restrictions Neumann, Klaus
2005
165 2 p. 495-509
15 p.
article
19 Scheduling UET-UCT outforests to minimize maximum lateness Singh, Gaurav
2005
165 2 p. 468-478
11 p.
article
20 Simple probability models for project contracting Paul, Anand
2005
165 2 p. 329-338
10 p.
article
21 Single machine scheduling to minimize total weighted tardiness Cheng, T.C.E.
2005
165 2 p. 423-443
21 p.
article
22 The two-machine flow-shop problem with weighted late work criterion and common due date Błażewicz, Jacek
2005
165 2 p. 408-415
8 p.
article
                             22 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands