nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A cost-benefit model for production vehicle testing
|
Inman, Robert R. |
|
1998 |
30 |
12 |
p. 1153-1160 |
artikel |
2 |
A cost-benefit model for production vehicle testing
|
ROBERT R. INMAN |
|
1998 |
30 |
12 |
p. 1153-1160 8 p. |
artikel |
3 |
A cost-benefit model for production vehicle testing
|
Inman, Robert R. |
|
1998 |
30 |
12 |
p. 1153-1160 |
artikel |
4 |
A review of: “Fundamentals of Quality Control and Improvement, 2nd Edition” Amitava Mitra Prentice-Hall, 1998, ISBN: 0 13 645086 5
|
Mastrangelo, Christina |
|
1998 |
30 |
12 |
p. 1201 |
artikel |
5 |
A review of: “Statistical Methods for Industrial Process Control” David Drain Chapman and Hall, 1997, 456 pp.
|
Keats, J. Bert |
|
1998 |
30 |
12 |
p. 1201-1202 |
artikel |
6 |
A review of: “Systems Engineering and Analysis, 3rd Edition” Benjamin S. Blanchard and Walter J. Fabrycky Prentice Hall, 1998, 738 pp.
|
Heragu, Sunderesh S. |
|
1998 |
30 |
12 |
p. 1202-1203 |
artikel |
7 |
A software cost model with warranty cost, error removal times and risk costs
|
Zhang, Xuemei |
|
1998 |
30 |
12 |
p. 1135-1142 |
artikel |
8 |
A software cost model with warranty cost, error removal times and risk costs
|
XUEMEI ZHANG |
|
1998 |
30 |
12 |
p. 1135-1142 8 p. |
artikel |
9 |
A software cost model with warranty cost, error removal times and risk costs
|
Zhang, Xuemei |
|
1998 |
30 |
12 |
p. 1135-1142 |
artikel |
10 |
Cost optimal preventive maintenance and replacement scheduling
|
Usher, John S. |
|
1998 |
30 |
12 |
p. 1121-1128 |
artikel |
11 |
Cost optimal preventive maintenance and replacement scheduling
|
JOHN S. USHER |
|
1998 |
30 |
12 |
p. 1121-1128 8 p. |
artikel |
12 |
Cost optimal preventive maintenance and replacement scheduling
|
Usher, John S. |
|
1998 |
30 |
12 |
p. 1121-1128 |
artikel |
13 |
Economic allocation of test times for subsystem-level reliability growth testing
|
Coit, David W. |
|
1998 |
30 |
12 |
p. 1143-1151 |
artikel |
14 |
Economic allocation of test times for subsystem-level reliability growth testing
|
DAVID W. COIT |
|
1998 |
30 |
12 |
p. 1143-1151 9 p. |
artikel |
15 |
Economic allocation of test times for subsystem-level reliability growth testing
|
Coit, David W. |
|
1998 |
30 |
12 |
p. 1143-1151 |
artikel |
16 |
Economic design of reliable networks
|
Deeter, Darren L. |
|
1998 |
30 |
12 |
p. 1161-1174 |
artikel |
17 |
Economic design of reliable networks
|
DARREN L. DEETER |
|
1998 |
30 |
12 |
p. 1161-1174 14 p. |
artikel |
18 |
Economic design of reliable networks
|
Deeter, Darren L. |
|
1998 |
30 |
12 |
p. 1161-1174 |
artikel |
19 |
Methodology for an operationally-based test length decision
|
Gaver, Donald P. |
|
1998 |
30 |
12 |
p. 1129-1134 |
artikel |
20 |
Methodology for an operationally-based test length decision
|
DONALD P. GAVER |
|
1998 |
30 |
12 |
p. 1129-1134 6 p. |
artikel |
21 |
Methodology for an operationally-based test length decision
|
Gaver, Donald P. |
|
1998 |
30 |
12 |
p. 1129-1134 |
artikel |
22 |
Nonparametric preventive maintenance optimization models under earning rate criteria
|
Dohi, Tadashi |
|
1998 |
30 |
12 |
p. 1099-1108 |
artikel |
23 |
Nonparametric preventive maintenance optimization models under earning rate criteria
|
TADASHI DOHI |
|
1998 |
30 |
12 |
p. 1099-1108 10 p. |
artikel |
24 |
Nonparametric preventive maintenance optimization models under earning rate criteria
|
Dohi, Tadashi |
|
1998 |
30 |
12 |
p. 1099-1108 |
artikel |
25 |
Optimal maintenance models with minimal repair, periodic overhaul and complete renewal
|
Zhang, Fan |
|
1998 |
30 |
12 |
p. 1109-1119 |
artikel |
26 |
Optimal maintenance models with minimal repair, periodic overhaul and complete renewal
|
FAN ZHANG |
|
1998 |
30 |
12 |
p. 1109-1119 11 p. |
artikel |
27 |
Optimal maintenance models with minimal repair, periodic overhaul and complete renewal
|
Zhang, Fan |
|
1998 |
30 |
12 |
p. 1109-1119 |
artikel |
28 |
Parallel time scales and two-dimensional manufacturer and individual customer warranties
|
Gertsbakh, Ilya B. |
|
1998 |
30 |
12 |
p. 1181-1189 |
artikel |
29 |
Parallel time scales and two-dimensional manufacturer and individual customer warranties
|
ILYA B. GERTSBAKH |
|
1998 |
30 |
12 |
p. 1181-1189 9 p. |
artikel |
30 |
Parallel time scales and two-dimensional manufacturer and individual customer warranties
|
Gertsbakh, Ilya B. |
|
1998 |
30 |
12 |
p. 1181-1189 |
artikel |
31 |
Reliability evaluation of capacitated-flow networks with budget constraints
|
Lin, Jsen-Shung |
|
1998 |
30 |
12 |
p. 1175-1180 |
artikel |
32 |
Reliability evaluation of capacitated-flow networks with budget constraints
|
JSEN-SHUNG LIN |
|
1998 |
30 |
12 |
p. 1175-1180 6 p. |
artikel |
33 |
Reliability evaluation of capacitated-flow networks with budget constraints
|
Lin, Jsen-shung |
|
1998 |
30 |
12 |
p. 1175-1180 |
artikel |
34 |
Warranty and redundancy design with uncertain quality
|
Hussain, A.Z.M.O. |
|
1998 |
30 |
12 |
p. 1191-1199 |
artikel |
35 |
Warranty and redundancy design with uncertain quality
|
A.Z.M.O. HUSSAIN |
|
1998 |
30 |
12 |
p. 1191-1199 9 p. |
artikel |
36 |
Warranty and redundancy design with uncertain quality
|
Hussain, A.Z.M.O. |
|
1998 |
30 |
12 |
p. 1191-1199 |
artikel |