no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
Allocating Items to an Automated Storage and Retrieval System
|
Hackman, Steven T. |
|
1990 |
22 |
1 |
p. 7-14 |
article |
2 |
Analysis of the Prediction Problem with Errors in the Variables
|
Yum, Bong-Jin |
|
1990 |
22 |
1 |
p. 73-83 |
article |
3 |
A Primal Simplex Specialization for the Equal Flow Problem
|
Shetty, Bala |
|
1990 |
22 |
1 |
p. 24-30 |
article |
4 |
A Sequential Inspection Plan for Markov Dependent Production Processes
|
Bhat, U. Narayan |
|
1990 |
22 |
1 |
p. 56-64 |
article |
5 |
Designing a Cellular Manufacturing System: A Materials Flow Approach Based on Operation Sequences
|
Vakharia, Asoo J. |
|
1990 |
22 |
1 |
p. 84-97 |
article |
6 |
Flexible Parts Routing in Manufacturing Systems*
|
Yao, David D. |
|
1990 |
22 |
1 |
p. 48-55 |
article |
7 |
Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield
|
Zhang, Xin |
|
1990 |
22 |
1 |
p. 41-47 |
article |
8 |
Monotonicity in Optimal Policy of a Flexible Manufacturing Cell Feeding Several Production Lines
|
Shioyama, Tadayoshi |
|
1990 |
22 |
1 |
p. 2-6 |
article |
9 |
Optimal Selection of Workholding Devices for Rotational Parts
|
Bidanda, Bopaya |
|
1990 |
22 |
1 |
p. 65-72 |
article |
10 |
Resource-Constrained Scheduling of Projects with Variable-Intensity Activities
|
Leachman, Robert C. |
|
1990 |
22 |
1 |
p. 31-40 |
article |
11 |
The Correlation Between Mean and Variance Estimators in Computer Simulation
|
Kang, Keebom |
|
1990 |
22 |
1 |
p. 15-23 |
article |