no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A Greedy Network Flow Algorithm for A Warehouse Leasing Problem
|
Lowe, Timothy J. |
|
1979 |
11 |
3 |
p. 170-182 |
article |
2 |
A Performance Approach to Attribute Sampling and Multiple Action Decisions
|
Moreno, Carlos Wm. |
|
1979 |
11 |
3 |
p. 183-197 |
article |
3 |
A Procedure for an Economic Comparison of Work Measurement Techniques, Part II: An Application
|
McGrath, Timothy J. |
|
1979 |
11 |
3 |
p. 237-244 |
article |
4 |
A Procedure for an Economic Comparison of Work Measurement Techniques, Part I: The Model
|
Adams, S. Keith |
|
1979 |
11 |
3 |
p. 229-236 |
article |
5 |
A Stochastic Analysis of Breakeven Points
|
Hilliard, Jimmy E. |
|
1979 |
11 |
3 |
p. 250-253 |
article |
6 |
Joint Economic Design of X and R Control Charts with Alternate Process Models
|
Saniga, Erwin M. |
|
1979 |
11 |
3 |
p. 254-260 |
article |
7 |
Letter
|
Stern, Helman I. |
|
1979 |
11 |
3 |
p. 264 |
article |
8 |
Optimal Control in Integrated R&D Production and Inventory Planning Systems
|
Narasimhan, Seetharama L. |
|
1979 |
11 |
3 |
p. 198-206 |
article |
9 |
Optimal Two-Stage Production Scheduling with Setup Times Separated
|
Yoshida, Teruhiko |
|
1979 |
11 |
3 |
p. 261-263 |
article |
10 |
Reliable Preventive Maintenance Scheduling
|
Malik, Mazhar Ali Khan |
|
1979 |
11 |
3 |
p. 221-228 |
article |
11 |
Sensitivity Analysis of the Costs in the Dynamic Lot Size Model
|
Murphy, F. H. |
|
1979 |
11 |
3 |
p. 245-249 |
article |
12 |
The Effectiveness of Using Uncertainty Resolution to Measure Investment Flexibility in Sequential Capital Rationing
|
Park, Chan S. |
|
1979 |
11 |
3 |
p. 207-220 |
article |