nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A framework and a simulation generator for kanban-controlled manufacturing systems
|
Aytug ̄, Haldun |
|
1998 |
34 |
2 |
p. 337-350 14 p. |
artikel |
2 |
A NEURAL NETWORK APPROACH FOR EARLY COST ESTIMATION OF PACKAGING PRODUCTS
|
Zhang, Y.F. |
|
1998 |
34 |
2 |
p. 433-450 18 p. |
artikel |
3 |
A new integrated system for selecting mining equipment
|
Michiotis, A. |
|
1998 |
34 |
2 |
p. 391-397 7 p. |
artikel |
4 |
An improved simulated annealing for facility layout problems in cellular manufacturing systems
|
Wang, Tai-Yue |
|
1998 |
34 |
2 |
p. 309-319 11 p. |
artikel |
5 |
A PREDICTIVE FUZZY LOGIC CONTROLLER FOR RESIN MANUFACTURING
|
Nagarajan, R. |
|
1998 |
34 |
2 |
p. 493-500 8 p. |
artikel |
6 |
BINARY INTEGER FORMULATION FOR MIXED-MODEL ASSEMBLY LINE BALANCING PROBLEM
|
Gökċen, Hadı |
|
1998 |
34 |
2 |
p. 451-461 11 p. |
artikel |
7 |
CONVERSION OF BOX-SHAPED FEATURES FOR MANUFACTURING APPLICATIONS
|
Wong, T.N. |
|
1998 |
34 |
2 |
p. 501-514 14 p. |
artikel |
8 |
Design of object-oriented database for the definition of machining operation sequences of 3D workpieces
|
Chep, Alain |
|
1998 |
34 |
2 |
p. 257-279 23 p. |
artikel |
9 |
Discussion
|
|
|
1998 |
34 |
2 |
p. 559-564 6 p. |
artikel |
10 |
Discussion
|
|
|
1998 |
34 |
2 |
p. 547-558 12 p. |
artikel |
11 |
FEATURE-BASED PART MODELING AND PROCESS PLANNING FOR RAPID RESPONSE MANUFACTURING
|
Cherng, John G. |
|
1998 |
34 |
2 |
p. 515-530 16 p. |
artikel |
12 |
Forecasting using autocorrelated errors and multicollinear predictor variables
|
Bayhan, G.Miraç |
|
1998 |
34 |
2 |
p. 413-421 9 p. |
artikel |
13 |
HEURISTICS FOR ASSEMBLY SEQUENCING AND RELATIVE MAGAZINE ASSIGNMENT FOR ROBOTIC ASSEMBLY
|
Wang, Collin |
|
1998 |
34 |
2 |
p. 423-431 9 p. |
artikel |
14 |
Implementation of a polygonal algorithm for surface–surface intersections
|
Roy, Utpal |
|
1998 |
34 |
2 |
p. 399-412 14 p. |
artikel |
15 |
Job shop scheduling for missed due-date performance
|
Cheng, T.C.E. |
|
1998 |
34 |
2 |
p. 297-307 11 p. |
artikel |
16 |
MODELING WITH COLORED TIMED OBJECT-ORIENTED PETRI NETS FOR AUTOMATED MANUFACTURING SYSTEMS
|
Wang, Li-Chih |
|
1998 |
34 |
2 |
p. 463-480 18 p. |
artikel |
17 |
Petri net modeling and scheduling for cyclic job shops with blocking
|
Song, Ju-Seog |
|
1998 |
34 |
2 |
p. 281-295 15 p. |
artikel |
18 |
RELIABILITY PREDICTION OF IMPERFECT SWITCHING SYSTEMS SUBJECT TO WEIBULL FAILURES
|
Pan, J.N. |
|
1998 |
34 |
2 |
p. 481-492 12 p. |
artikel |
19 |
SCHEDULING TO MINIMIZE MEAN TARDINESS AND WEIGHTED MEAN TARDINESS IN FLOWSHOP AND FLOWLINE-BASED MANUFACTURING CELL
|
Parthasarathy, Srinivasaraghavan |
|
1998 |
34 |
2 |
p. 531-546 16 p. |
artikel |
20 |
Sole versus dual sourcing in a continuous-review inventory system with lost sales
|
Mohebbi, Esmail |
|
1998 |
34 |
2 |
p. 321-336 16 p. |
artikel |
21 |
Solving push-out conflicts in apron taxiways of airports by a network-based simulation
|
Cheng, Yu |
|
1998 |
34 |
2 |
p. 351-369 19 p. |
artikel |
22 |
Spreadsheet calculations for the machine interference queueing model
|
Eben-Chaime, Moshe |
|
1998 |
34 |
2 |
p. 385-390 6 p. |
artikel |
23 |
Work flow analysis using queuing decomposition models
|
Enns, S.T. |
|
1998 |
34 |
2 |
p. 371-383 13 p. |
artikel |