Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             23 results found
no title author magazine year volume issue page(s) type
1 A framework and a simulation generator for kanban-controlled manufacturing systems Aytug ̄, Haldun
1998
34 2 p. 337-350
14 p.
article
2 A NEURAL NETWORK APPROACH FOR EARLY COST ESTIMATION OF PACKAGING PRODUCTS Zhang, Y.F.
1998
34 2 p. 433-450
18 p.
article
3 A new integrated system for selecting mining equipment Michiotis, A.
1998
34 2 p. 391-397
7 p.
article
4 An improved simulated annealing for facility layout problems in cellular manufacturing systems Wang, Tai-Yue
1998
34 2 p. 309-319
11 p.
article
5 A PREDICTIVE FUZZY LOGIC CONTROLLER FOR RESIN MANUFACTURING Nagarajan, R.
1998
34 2 p. 493-500
8 p.
article
6 BINARY INTEGER FORMULATION FOR MIXED-MODEL ASSEMBLY LINE BALANCING PROBLEM Gökċen, Hadı
1998
34 2 p. 451-461
11 p.
article
7 CONVERSION OF BOX-SHAPED FEATURES FOR MANUFACTURING APPLICATIONS Wong, T.N.
1998
34 2 p. 501-514
14 p.
article
8 Design of object-oriented database for the definition of machining operation sequences of 3D workpieces Chep, Alain
1998
34 2 p. 257-279
23 p.
article
9 Discussion 1998
34 2 p. 559-564
6 p.
article
10 Discussion 1998
34 2 p. 547-558
12 p.
article
11 FEATURE-BASED PART MODELING AND PROCESS PLANNING FOR RAPID RESPONSE MANUFACTURING Cherng, John G.
1998
34 2 p. 515-530
16 p.
article
12 Forecasting using autocorrelated errors and multicollinear predictor variables Bayhan, G.Miraç
1998
34 2 p. 413-421
9 p.
article
13 HEURISTICS FOR ASSEMBLY SEQUENCING AND RELATIVE MAGAZINE ASSIGNMENT FOR ROBOTIC ASSEMBLY Wang, Collin
1998
34 2 p. 423-431
9 p.
article
14 Implementation of a polygonal algorithm for surface–surface intersections Roy, Utpal
1998
34 2 p. 399-412
14 p.
article
15 Job shop scheduling for missed due-date performance Cheng, T.C.E.
1998
34 2 p. 297-307
11 p.
article
16 MODELING WITH COLORED TIMED OBJECT-ORIENTED PETRI NETS FOR AUTOMATED MANUFACTURING SYSTEMS Wang, Li-Chih
1998
34 2 p. 463-480
18 p.
article
17 Petri net modeling and scheduling for cyclic job shops with blocking Song, Ju-Seog
1998
34 2 p. 281-295
15 p.
article
18 RELIABILITY PREDICTION OF IMPERFECT SWITCHING SYSTEMS SUBJECT TO WEIBULL FAILURES Pan, J.N.
1998
34 2 p. 481-492
12 p.
article
19 SCHEDULING TO MINIMIZE MEAN TARDINESS AND WEIGHTED MEAN TARDINESS IN FLOWSHOP AND FLOWLINE-BASED MANUFACTURING CELL Parthasarathy, Srinivasaraghavan
1998
34 2 p. 531-546
16 p.
article
20 Sole versus dual sourcing in a continuous-review inventory system with lost sales Mohebbi, Esmail
1998
34 2 p. 321-336
16 p.
article
21 Solving push-out conflicts in apron taxiways of airports by a network-based simulation Cheng, Yu
1998
34 2 p. 351-369
19 p.
article
22 Spreadsheet calculations for the machine interference queueing model Eben-Chaime, Moshe
1998
34 2 p. 385-390
6 p.
article
23 Work flow analysis using queuing decomposition models Enns, S.T.
1998
34 2 p. 371-383
13 p.
article
                             23 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands