nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A coordinated inventory control system for compound Poisson demand and zero lead time†
|
Thompstonej, Robert M. |
|
1975 |
13 |
6 |
p. 581-602 |
artikel |
2 |
An integrated cutting tool life, batch quantity model
|
Dutt, R. P. |
|
1975 |
13 |
6 |
p. 615-622 |
artikel |
3 |
A review of: “Introduction to Sequencing and Scheduling.” By K. R. BAKER. (New York : Wiley, 1974.) [Pp. 305] Price £8-50
|
Hollier, R. H. |
|
1975 |
13 |
6 |
p. 654 |
artikel |
4 |
A review of: “Operations Research in Production Planning, Scheduling and, Inventory Control.” By L. A. JOHNSON and D. C. MONTGOMERY. (New York : Wiley, 1974.) [Pp. 525.] Price £9-75
|
Hollier, R. H. |
|
1975 |
13 |
6 |
p. 653 |
artikel |
5 |
A review of: “Production and Operations Management; A Systems Concept.” By R. A. JOHNSON, W. T. NEWELL and R. C. VEEGIN. (London: Houghton Mifflin Company, 1974.) [Pp. 572.] Price £7.25
|
Suky, R. J. |
|
1975 |
13 |
6 |
p. 654 |
artikel |
6 |
A review of: “Work Organization. A Study of Manual Work and Mass Production.” Edited by Pv. Wild. (John Wiley & Sons Ltd, 1975.) [Pp. 226.] Price £6.50.
|
Sury, R. J. |
|
1975 |
13 |
6 |
p. 653 |
artikel |
7 |
Design of cellular production systems A graph-theoretic approach
|
Rajagopalan, R. |
|
1975 |
13 |
6 |
p. 567-579 |
artikel |
8 |
Influence of die variables on cavity press forging loads
|
Balogun, S. A. |
|
1975 |
13 |
6 |
p. 637-650 |
artikel |
9 |
Letter to the Editor
|
Gregory, G. |
|
1975 |
13 |
6 |
p. 651 |
artikel |
10 |
Modelling and system analysis of multistation closed-loop conveyors†
|
Muth, Eginhard J. |
|
1975 |
13 |
6 |
p. 559-566 |
artikel |
11 |
Predictive models for setting safe limits in manual materials handling
|
Drury, C. G. |
|
1975 |
13 |
6 |
p. 529-539 |
artikel |
12 |
The analytical and experimental determination of the temperature of a specimen during upquench and quench and its influence on recrystallization
|
BROWNf, J. H. |
|
1975 |
13 |
6 |
p. 623-635 |
artikel |
13 |
The impact of advancing due dates in a pure job shop
|
Day, James E. |
|
1975 |
13 |
6 |
p. 603-613 |
artikel |
14 |
The layout of multi-product lines
|
Carrie, Allan S. |
|
1975 |
13 |
6 |
p. 541-557 |
artikel |