nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A capacitated facility location problem with constrained backlogging probabilities
|
Silva, F. J. F. |
|
2007 |
|
21 |
p. 5117-5134 |
artikel |
2 |
Adaptive exponential smoothing versus conventional approaches for lumpy demand forecasting: case of production planning for a manufacturing line
|
Quintana, R. |
|
2007 |
|
21 |
p. 4937-4957 |
artikel |
3 |
Adaptive resonance theory-based neural algorithms for manufacturing process quality control
|
Pacella, M. |
|
2004 |
|
21 |
p. 4581-4607 |
artikel |
4 |
A genetic algorithm approach to the integrated inventory-distribution problem
|
Abdelmaguid, Tamer F. |
|
2006 |
|
21 |
p. 4445-4464 |
artikel |
5 |
A new multi-objective optimization method for master production scheduling problems using simulated annealing
|
Vieira, Guilherme Ernani |
|
2004 |
|
21 |
p. 4609-4622 |
artikel |
6 |
A note on 'frequency approach for treating capacity constrained multi-level production', ijpr, 42, 3119-3137
|
Segerstedt, Anders |
|
2004 |
|
21 |
p. 4639 |
artikel |
7 |
Application of control theoretic principles to manage inventory replenishment in a supply chain
|
Sourirajan, K. |
|
2008 |
|
21 |
p. 6163-6188 |
artikel |
8 |
Automatic defect inspection of patterned thin film transistor-liquid crystal display (TFT-LCD) panels using one-dimensional Fourier reconstruction and wavelet decomposition
|
Tsai, D. -M. |
|
2005 |
|
21 |
p. 4589-4607 |
artikel |
9 |
Availability consideration in the optimal selection of multiple-aspect RMS configurations
|
Youssef, A. M. A. |
|
2008 |
|
21 |
p. 5849-5882 |
artikel |
10 |
Book review
|
Shen, Weiming |
|
2006 |
|
21 |
p. 4695-4696 |
artikel |
11 |
Book Reviews
|
Browne, J. |
|
2007 |
|
21 |
p. 5173 |
artikel |
12 |
Branch-and-price approach for prescribing profitable feature upgrades
|
Damodaran, P. |
|
2005 |
|
21 |
p. 4539-4558 |
artikel |
13 |
Case study: the impact of assembly reorientations on assembly time
|
Pan, Chunxia |
|
2006 |
|
21 |
p. 4569-4585 |
artikel |
14 |
Casting product-process-producer compatibility evaluation and improvement
|
Akarte, M. M. |
|
2007 |
|
21 |
p. 4917-4936 |
artikel |
15 |
Complex system design technique
|
Brad, S. |
|
2008 |
|
21 |
p. 5979-6008 |
artikel |
16 |
Comprehensive framework for the development of a supply chain strategy
|
Martinez-Olvera, C. |
|
2006 |
|
21 |
p. 4511-4528 |
artikel |
17 |
Computer-aided decision for human task allocation with mono- and multi-performance evaluation
|
Bennour, M. |
|
2005 |
|
21 |
p. 4559-4588 |
artikel |
18 |
Concurrent optimization of assembly tolerances for quality with position control using scatter search approach
|
Prabhaharan, G. |
|
2007 |
|
21 |
p. 4959-4988 |
artikel |
19 |
Concurrent optimization of the design and manufacturing stages of product development
|
Lamghabbar, A. |
|
2004 |
|
21 |
p. 4495-4512 |
artikel |
20 |
Designing data warehouses for equipment management system with genetic algorithms
|
Chen, K. -Y. |
|
2008 |
|
21 |
p. 6113-6135 |
artikel |
21 |
Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment
|
Kwong, C. K. |
|
2006 |
|
21 |
p. 4465-4490 |
artikel |
22 |
Determining a collision-free domain for the tool in five-axis machining
|
Monies, F. |
|
2004 |
|
21 |
p. 4513-4530 |
artikel |
23 |
Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches
|
Yurdakul, M. |
|
2005 |
|
21 |
p. 4609-4641 |
artikel |
24 |
Dynamic state-dependent dispatching for wafer fabrication
|
Chen, J. C. |
|
2004 |
|
21 |
p. 4547-4562 |
artikel |
25 |
Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies
|
Suwanruji, P. |
|
2006 |
|
21 |
p. 4607-4629 |
artikel |
26 |
Genetic algorithms for layout optimization in crossdocking operations of a manufacturing plant
|
Hauser, Karina |
|
2006 |
|
21 |
p. 4663-4680 |
artikel |
27 |
Heuristic approach for solving the multi-objective facility layout problem
|
Chen, C. -W. |
|
2005 |
|
21 |
p. 4493-4507 |
artikel |
28 |
Human resources in advanced environmental approaches-a case analysis
|
Angel del Brio, Jesus |
|
2008 |
|
21 |
p. 6029-6053 |
artikel |
29 |
Hybrid evolutionary multi-objective algorithms for integrating assembly sequence planning and assembly line balancing
|
Tseng, H. -E. |
|
2008 |
|
21 |
p. 5951-5977 |
artikel |
30 |
Hybrid genetic algorithm for group technology economic lot scheduling problem
|
Moon, I. K. |
|
2006 |
|
21 |
p. 4551-4568 |
artikel |
31 |
Information deduction approach through quality function deployment for the quantification of the dependency between design tasks
|
Chen, C. -H. |
|
2004 |
|
21 |
p. 4623-4637 |
artikel |
32 |
In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations
|
Freed, T. |
|
2007 |
|
21 |
p. 5075-5093 |
artikel |
33 |
Integrated model for supplier selection and negotiation in a make-to-order environment
|
Cakravastia, A. |
|
2004 |
|
21 |
p. 4457-4474 |
artikel |
34 |
Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study
|
Upasani, A. |
|
2008 |
|
21 |
p. 5883-5905 |
artikel |
35 |
Layout optimization considering production uncertainty and routing flexibility
|
Kulturel-Konak, S. |
|
2004 |
|
21 |
p. 4475-4493 |
artikel |
36 |
Measuring production yield for processes with multiple quality characteristics
|
Pearn, W. L. |
|
2006 |
|
21 |
p. 4649-4661 |
artikel |
37 |
Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
|
Kumar, R. |
|
2004 |
|
21 |
p. 4431-4455 |
artikel |
38 |
Multiple machine JIT scheduling: a tabu search approach
|
Finke, Daniel A. |
|
2007 |
|
21 |
p. 4899-4915 |
artikel |
39 |
No title
|
Junquera, B. |
|
2007 |
|
21 |
p. 5175-5176 |
artikel |
40 |
No title
|
Dani, S. |
|
2007 |
|
21 |
p. 5174 |
artikel |
41 |
On the equivalence of small batch assembly line balancing and lot streaming in a flow shop
|
Glass, Celia A. |
|
2006 |
|
21 |
p. 4587-4606 |
artikel |
42 |
Optimal control of an unreliable machine using fuzzy-logic control: from design to implementation
|
Yuniarto, M. N. |
|
2005 |
|
21 |
p. 4509-4537 |
artikel |
43 |
Optimal inventory costs in a complementary flexible manufacturing system
|
Thomas, R. |
|
2004 |
|
21 |
p. 4563-4580 |
artikel |
44 |
Optimization of a line-cutting procedure for ship hull construction by an effective tabu search
|
Weng, W. -C. |
|
2008 |
|
21 |
p. 5935-5949 |
artikel |
45 |
Optimization of welding parameters for resistance spot welding of TRIP steel with response surface methodology
|
Kim, T. |
|
2005 |
|
21 |
p. 4643-4657 |
artikel |
46 |
Parallel algorithm for setting WIP levels for multi-product CONWIP systems
|
Wang, L. |
|
2006 |
|
21 |
p. 4681-4693 |
artikel |
47 |
Parallel machine scheduling considering a job-splitting property
|
Kim, Y. -D. |
|
2004 |
|
21 |
p. 4531-4546 |
artikel |
48 |
Performance measurement for new product development: a model based on total costs
|
Chen, C. -C. |
|
2006 |
|
21 |
p. 4631-4648 |
artikel |
49 |
Performance of carousel systems with 'organ-pipe' storage
|
Park, Byung Chun |
|
2005 |
|
21 |
p. 4685-4695 |
artikel |
50 |
Picklist generation algorithm with order-consolidation consideration for split-case module-based fulfilment centres
|
Owyong, M. |
|
2006 |
|
21 |
p. 4529-4550 |
artikel |
51 |
Real-time routing in flexible flow shops: a self-adaptive swarm-based control model
|
Meyyappan, Lakshmanan |
|
2007 |
|
21 |
p. 5157-5172 |
artikel |
52 |
Recent development on product modelling: a review
|
Yang, W. Z. |
|
2008 |
|
21 |
p. 6055-6085 |
artikel |
53 |
Relationships between solid waste management performance and environmental practice adoption in Welsh small and medium-sized enterprises (SMEs)
|
Sarkis, J. |
|
2007 |
|
21 |
p. 4989-5015 |
artikel |
54 |
Route planning for automated guided vehicles in a manufacturing facility
|
Sarker, B. R. |
|
2005 |
|
21 |
p. 4659-4683 |
artikel |
55 |
Sensor fusion for online tool condition monitoring in milling
|
Wang, W. H. |
|
2007 |
|
21 |
p. 5095-5116 |
artikel |
56 |
Simultaneous configuration of platform products and manufacturing supply chains
|
Zhang, Xinyan |
|
2008 |
|
21 |
p. 6137-6162 |
artikel |
57 |
Single CNC machine scheduling with controllable processing times and multiple due dates
|
Atan, Mehmet Oguz |
|
2008 |
|
21 |
p. 6087-6111 |
artikel |
58 |
Technical Note
|
Rajagopalan, R. |
|
2006 |
|
21 |
p. 4697 |
artikel |
59 |
The impact of operations capability on firm performance
|
Tan, K. C. |
|
2007 |
|
21 |
p. 5135-5156 |
artikel |
60 |
The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab
|
Liu, H. |
|
2007 |
|
21 |
p. 5017-5056 |
artikel |
61 |
Using an MQE chart based on a self-organizing map NN to monitor out-of-control signals in manufacturing processes
|
Yu, J. B. |
|
2008 |
|
21 |
p. 5907-5933 |
artikel |
62 |
Using data continualization and expansion to improve small data set learning accuracy for early flexible manufacturing system (FMS) scheduling
|
Li, D. -C. |
|
2006 |
|
21 |
p. 4491-4509 |
artikel |
63 |
Using ensemble and metaheuristics learning principles with artificial neural networks to improve due date prediction performance
|
Patil, Rahul J. |
|
2008 |
|
21 |
p. 6009-6027 |
artikel |
64 |
Value of information exchange and synchronization in a multi-tier supply chain
|
Viswanathan, S. |
|
2007 |
|
21 |
p. 5057-5074 |
artikel |