Digitale Bibliotheek
Sluiten Bladeren door artikelen uit een tijdschrift
     Tijdschrift beschrijving
       Alle jaargangen van het bijbehorende tijdschrift
         Alle afleveringen van het bijbehorende jaargang
                                       Alle artikelen van de bijbehorende aflevering
 
                             64 gevonden resultaten
nr titel auteur tijdschrift jaar jaarg. afl. pagina('s) type
1 A capacitated facility location problem with constrained backlogging probabilities Silva, F. J. F.
2007
21 p. 5117-5134
artikel
2 Adaptive exponential smoothing versus conventional approaches for lumpy demand forecasting: case of production planning for a manufacturing line Quintana, R.
2007
21 p. 4937-4957
artikel
3 Adaptive resonance theory-based neural algorithms for manufacturing process quality control Pacella, M.
2004
21 p. 4581-4607
artikel
4 A genetic algorithm approach to the integrated inventory-distribution problem Abdelmaguid, Tamer F.
2006
21 p. 4445-4464
artikel
5 A new multi-objective optimization method for master production scheduling problems using simulated annealing Vieira, Guilherme Ernani
2004
21 p. 4609-4622
artikel
6 A note on 'frequency approach for treating capacity constrained multi-level production', ijpr, 42, 3119-3137 Segerstedt, Anders
2004
21 p. 4639
artikel
7 Application of control theoretic principles to manage inventory replenishment in a supply chain Sourirajan, K.
2008
21 p. 6163-6188
artikel
8 Automatic defect inspection of patterned thin film transistor-liquid crystal display (TFT-LCD) panels using one-dimensional Fourier reconstruction and wavelet decomposition Tsai, D. -M.
2005
21 p. 4589-4607
artikel
9 Availability consideration in the optimal selection of multiple-aspect RMS configurations Youssef, A. M. A.
2008
21 p. 5849-5882
artikel
10 Book review Shen, Weiming
2006
21 p. 4695-4696
artikel
11 Book Reviews Browne, J.
2007
21 p. 5173
artikel
12 Branch-and-price approach for prescribing profitable feature upgrades Damodaran, P.
2005
21 p. 4539-4558
artikel
13 Case study: the impact of assembly reorientations on assembly time Pan, Chunxia
2006
21 p. 4569-4585
artikel
14 Casting product-process-producer compatibility evaluation and improvement Akarte, M. M.
2007
21 p. 4917-4936
artikel
15 Complex system design technique Brad, S.
2008
21 p. 5979-6008
artikel
16 Comprehensive framework for the development of a supply chain strategy Martinez-Olvera, C.
2006
21 p. 4511-4528
artikel
17 Computer-aided decision for human task allocation with mono- and multi-performance evaluation Bennour, M.
2005
21 p. 4559-4588
artikel
18 Concurrent optimization of assembly tolerances for quality with position control using scatter search approach Prabhaharan, G.
2007
21 p. 4959-4988
artikel
19 Concurrent optimization of the design and manufacturing stages of product development Lamghabbar, A.
2004
21 p. 4495-4512
artikel
20 Designing data warehouses for equipment management system with genetic algorithms Chen, K. -Y.
2008
21 p. 6113-6135
artikel
21 Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment Kwong, C. K.
2006
21 p. 4465-4490
artikel
22 Determining a collision-free domain for the tool in five-axis machining Monies, F.
2004
21 p. 4513-4530
artikel
23 Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches Yurdakul, M.
2005
21 p. 4609-4641
artikel
24 Dynamic state-dependent dispatching for wafer fabrication Chen, J. C.
2004
21 p. 4547-4562
artikel
25 Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies Suwanruji, P.
2006
21 p. 4607-4629
artikel
26 Genetic algorithms for layout optimization in crossdocking operations of a manufacturing plant Hauser, Karina
2006
21 p. 4663-4680
artikel
27 Heuristic approach for solving the multi-objective facility layout problem Chen, C. -W.
2005
21 p. 4493-4507
artikel
28 Human resources in advanced environmental approaches-a case analysis Angel del Brio, Jesus
2008
21 p. 6029-6053
artikel
29 Hybrid evolutionary multi-objective algorithms for integrating assembly sequence planning and assembly line balancing Tseng, H. -E.
2008
21 p. 5951-5977
artikel
30 Hybrid genetic algorithm for group technology economic lot scheduling problem Moon, I. K.
2006
21 p. 4551-4568
artikel
31 Information deduction approach through quality function deployment for the quantification of the dependency between design tasks Chen, C. -H.
2004
21 p. 4623-4637
artikel
32 In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations Freed, T.
2007
21 p. 5075-5093
artikel
33 Integrated model for supplier selection and negotiation in a make-to-order environment Cakravastia, A.
2004
21 p. 4457-4474
artikel
34 Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study Upasani, A.
2008
21 p. 5883-5905
artikel
35 Layout optimization considering production uncertainty and routing flexibility Kulturel-Konak, S.
2004
21 p. 4475-4493
artikel
36 Measuring production yield for processes with multiple quality characteristics Pearn, W. L.
2006
21 p. 4649-4661
artikel
37 Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability Kumar, R.
2004
21 p. 4431-4455
artikel
38 Multiple machine JIT scheduling: a tabu search approach Finke, Daniel A.
2007
21 p. 4899-4915
artikel
39 No title Junquera, B.
2007
21 p. 5175-5176
artikel
40 No title Dani, S.
2007
21 p. 5174
artikel
41 On the equivalence of small batch assembly line balancing and lot streaming in a flow shop Glass, Celia A.
2006
21 p. 4587-4606
artikel
42 Optimal control of an unreliable machine using fuzzy-logic control: from design to implementation Yuniarto, M. N.
2005
21 p. 4509-4537
artikel
43 Optimal inventory costs in a complementary flexible manufacturing system Thomas, R.
2004
21 p. 4563-4580
artikel
44 Optimization of a line-cutting procedure for ship hull construction by an effective tabu search Weng, W. -C.
2008
21 p. 5935-5949
artikel
45 Optimization of welding parameters for resistance spot welding of TRIP steel with response surface methodology Kim, T.
2005
21 p. 4643-4657
artikel
46 Parallel algorithm for setting WIP levels for multi-product CONWIP systems Wang, L.
2006
21 p. 4681-4693
artikel
47 Parallel machine scheduling considering a job-splitting property Kim, Y. -D.
2004
21 p. 4531-4546
artikel
48 Performance measurement for new product development: a model based on total costs Chen, C. -C.
2006
21 p. 4631-4648
artikel
49 Performance of carousel systems with 'organ-pipe' storage Park, Byung Chun
2005
21 p. 4685-4695
artikel
50 Picklist generation algorithm with order-consolidation consideration for split-case module-based fulfilment centres Owyong, M.
2006
21 p. 4529-4550
artikel
51 Real-time routing in flexible flow shops: a self-adaptive swarm-based control model Meyyappan, Lakshmanan
2007
21 p. 5157-5172
artikel
52 Recent development on product modelling: a review Yang, W. Z.
2008
21 p. 6055-6085
artikel
53 Relationships between solid waste management performance and environmental practice adoption in Welsh small and medium-sized enterprises (SMEs) Sarkis, J.
2007
21 p. 4989-5015
artikel
54 Route planning for automated guided vehicles in a manufacturing facility Sarker, B. R.
2005
21 p. 4659-4683
artikel
55 Sensor fusion for online tool condition monitoring in milling Wang, W. H.
2007
21 p. 5095-5116
artikel
56 Simultaneous configuration of platform products and manufacturing supply chains Zhang, Xinyan
2008
21 p. 6137-6162
artikel
57 Single CNC machine scheduling with controllable processing times and multiple due dates Atan, Mehmet Oguz
2008
21 p. 6087-6111
artikel
58 Technical Note Rajagopalan, R.
2006
21 p. 4697
artikel
59 The impact of operations capability on firm performance Tan, K. C.
2007
21 p. 5135-5156
artikel
60 The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab Liu, H.
2007
21 p. 5017-5056
artikel
61 Using an MQE chart based on a self-organizing map NN to monitor out-of-control signals in manufacturing processes Yu, J. B.
2008
21 p. 5907-5933
artikel
62 Using data continualization and expansion to improve small data set learning accuracy for early flexible manufacturing system (FMS) scheduling Li, D. -C.
2006
21 p. 4491-4509
artikel
63 Using ensemble and metaheuristics learning principles with artificial neural networks to improve due date prediction performance Patil, Rahul J.
2008
21 p. 6009-6027
artikel
64 Value of information exchange and synchronization in a multi-tier supply chain Viswanathan, S.
2007
21 p. 5057-5074
artikel
                             64 gevonden resultaten
 
 Koninklijke Bibliotheek - Nationale Bibliotheek van Nederland