nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Alleviation of numerical instability in geophone-based measurement of track vibrations by utilizing a priori information
|
Joh, Sung-Ho |
|
2014 |
18 |
5 |
p. 1351-1358 |
artikel |
2 |
An MDB business competency assessment of Korean construction companies
|
Sohn, Tae-Hong |
|
2014 |
18 |
5 |
p. 1314-1321 |
artikel |
3 |
A novel form analysis method considering pretension process for suspen-dome structures
|
Zhou, Zhen |
|
2014 |
18 |
5 |
p. 1411-1420 |
artikel |
4 |
Application of Runge-Kutta Discontinuous Galerkin finite element method to shallow water flow
|
Lee, Haegyun |
|
2014 |
18 |
5 |
p. 1554-1562 |
artikel |
5 |
Applying rough random MODM model to resource-constrained project scheduling problem: A case study of Pubugou Hydropower Project in China
|
Zhang, Zhe |
|
2014 |
18 |
5 |
p. 1279-1291 |
artikel |
6 |
Assessment of CII Best Practices usage in the construction industry
|
Kim, S. B. |
|
2014 |
18 |
5 |
p. 1228-1238 |
artikel |
7 |
A theoretical method to predict crack initiation in stabilizing piles
|
Yu, Yang |
|
2014 |
18 |
5 |
p. 1332-1341 |
artikel |
8 |
Causes of common and frequent claims in oil, gas and petrochemical projects of Iran
|
Hasheminasab, S. H. |
|
2014 |
18 |
5 |
p. 1270-1278 |
artikel |
9 |
Characteristics of mortar containing sodium polyacrylate absorbent synthesized by inverse emulsion polymerization
|
Lee, Seunghan |
|
2014 |
18 |
5 |
p. 1397-1402 |
artikel |
10 |
Comparison of performance of overlay pavements constructed on deteriorated concrete pavements using LTPP database
|
Lee, Seung-Woo |
|
2014 |
18 |
5 |
p. 1380-1388 |
artikel |
11 |
Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study
|
Ebrat, Mehdi |
|
2014 |
18 |
5 |
p. 1213-1227 |
artikel |
12 |
Effect of aggregate shape on the surface properties of flexible pavement
|
Sengoz, Burak |
|
2014 |
18 |
5 |
p. 1364-1371 |
artikel |
13 |
Effect of joint type on rigid airfield pavement behavior
|
Oh, Han Jin |
|
2014 |
18 |
5 |
p. 1389-1396 |
artikel |
14 |
Extreme wind climate modeling of some locations in India for the specification of the design wind speed of structures
|
Sarkar, Arnab |
|
2014 |
18 |
5 |
p. 1496-1504 |
artikel |
15 |
Game theoretical models of the cooperative carrier behavior
|
Lee, Hyangsook |
|
2014 |
18 |
5 |
p. 1528-1538 |
artikel |
16 |
Ground deformation tracking over Mt. Baekdu: A pre-evaluation of possible magma recharge by D-InSAR analysis
|
Kim, Jung-Rack |
|
2014 |
18 |
5 |
p. 1505-1510 |
artikel |
17 |
Identification of applications of mobile devices to improve airport BHS maintenance
|
Park, Won-jin |
|
2014 |
18 |
5 |
p. 1207-1212 |
artikel |
18 |
Identification of spillovers in urban street networks based on upstream fixed traffic data
|
Ma, Dongfang |
|
2014 |
18 |
5 |
p. 1539-1547 |
artikel |
19 |
Implementing earned value management using bridge information modeling
|
Marzouk, Mohamed |
|
2014 |
18 |
5 |
p. 1302-1313 |
artikel |
20 |
Improved and competitive algorithms for large scale multiple resource-constrained project-scheduling problems
|
Rostami, Mohammad |
|
2014 |
18 |
5 |
p. 1261-1269 |
artikel |
21 |
Integrated flood risk analysis in a changing climate: A case study from the Korean Han River Basin
|
Yoon, Sun-Kwon |
|
2014 |
18 |
5 |
p. 1563-1571 |
artikel |
22 |
Investigation of properties of lightweight concrete with calcined diatomite aggregate
|
Posi, Patcharapol |
|
2014 |
18 |
5 |
p. 1429-1435 |
artikel |
23 |
Model tests on reinforced sloped embankment with denti-strip inclusions under monotonic loading
|
Zhang, M. X. |
|
2014 |
18 |
5 |
p. 1342-1350 |
artikel |
24 |
New method for the estimation of strong ground motions based on the colonial competitive algorithm
|
Bagheri, Abdollah |
|
2014 |
18 |
5 |
p. 1403-1410 |
artikel |
25 |
Non-destructive testing methods in the U.S. for bridge inspection and maintenance
|
Lee, Sangwook |
|
2014 |
18 |
5 |
p. 1322-1331 |
artikel |
26 |
Optimum design of gravity and reinforced retaining walls using enhanced charged system search algorithm
|
Talatahari, S. |
|
2014 |
18 |
5 |
p. 1464-1469 |
artikel |
27 |
Prediction of subgrade resilient modulus using artificial neural network
|
Kim, Sung-Hee |
|
2014 |
18 |
5 |
p. 1372-1379 |
artikel |
28 |
Production based scheduling method for linear construction in road projects
|
Kannan, S. R. |
|
2014 |
18 |
5 |
p. 1292-1301 |
artikel |
29 |
Quantitative precipitation estimation for an X-band dual-polarization radar in the complex mountainous terrain
|
Lim, Sanghun |
|
2014 |
18 |
5 |
p. 1548-1553 |
artikel |
30 |
Random field-based reliability analysis of prestressed concrete bridges
|
Cheng, Jin |
|
2014 |
18 |
5 |
p. 1436-1445 |
artikel |
31 |
Simplified passive earth pressure element
|
Limkatanyu, Suchart |
|
2014 |
18 |
5 |
p. 1359-1363 |
artikel |
32 |
Static analysis of laminated conical shells by Discrete Singular Convolution (DSC) approach
|
Ersoy, Hakan |
|
2014 |
18 |
5 |
p. 1455-1463 |
artikel |
33 |
Structural behavior of precast Ultra-High Performance Fiber Reinforced Concrete (UHPFRC) cantilever retaining walls: Part I — Analysis and design procedures and Environmental Impact Calculations (EIC)
|
Nematollahi, Behzad |
|
2014 |
18 |
5 |
p. 1470-1480 |
artikel |
34 |
Structural behavior of precast Ultra-High Performance Fiber Reinforced Concrete (UHPFRC) cantilever retaining walls: Part II — Full scale experimental testing
|
Nematollahi, Behzad |
|
2014 |
18 |
5 |
p. 1481-1495 |
artikel |
35 |
Tensile cracking constitutive model of Steel Fiber Reinforced Concrete (SFRC)
|
Woo, Sang-Kyun |
|
2014 |
18 |
5 |
p. 1446-1454 |
artikel |
36 |
The strategies on safe city making through hotspot analyses on crime
|
Kim, Kirl |
|
2014 |
18 |
5 |
p. 1511-1517 |
artikel |
37 |
Three-step solutions for cutting stock problem of construction steel bars
|
Benjaoran, Vacharapoom |
|
2014 |
18 |
5 |
p. 1239-1247 |
artikel |
38 |
Towards lateral performance of CBF with unwanted eccentric connection: A finite element modeling approach
|
Zahrai, Seyed Mehdi |
|
2014 |
18 |
5 |
p. 1421-1428 |
artikel |
39 |
Tram passive signal priority strategy based on the MAXBAND model
|
Jeong, Youngje |
|
2014 |
18 |
5 |
p. 1518-1527 |
artikel |
40 |
Verification of lean construction benefits through simulation modeling: A case study of bricklaying process
|
Abbasian-Hosseini, S. Alireza |
|
2014 |
18 |
5 |
p. 1248-1260 |
artikel |