nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A gas-steam power installation with firing fuel in oxygen
|
|
|
2010 |
57 |
2 |
p. 175-178 |
artikel |
2 |
A list of journal articles on Gas Turbines and Combined-Cycle Plants published in 2008 and 2009
|
|
|
2010 |
57 |
2 |
p. 179-183 |
artikel |
3 |
Design calculation of three-loop combined-cycle plants with steam reheating
|
Trukhnii, A. D. |
|
2010 |
57 |
2 |
p. 105-112 |
artikel |
4 |
Development of a domestic combined cycle plant with coal gasification
|
Ol’khovskii, G. G. |
|
2010 |
57 |
2 |
p. 113-120 |
artikel |
5 |
Formation of liquid film downstream of an atomizer and its disintegration in gaseous medium
|
Vasil’ev, A. Yu. |
|
2010 |
57 |
2 |
p. 151-154 |
artikel |
6 |
Gas-dynamic and thermal processes under film cooling end surfaces of a gas-turbine blade bucket
|
Lebedev, V. V. |
|
2010 |
57 |
2 |
p. 138-141 |
artikel |
7 |
Gas-turbine units of OAO Aviadvigatel’ designed for operation on synthesis gas obtained from gasification of coal
|
Sulimov, D. D. |
|
2010 |
57 |
2 |
p. 121-124 |
artikel |
8 |
Main lines of the development of electrohydraulic control systems for steam turbines produced by OAO turboatom
|
Burakov, A. S. |
|
2010 |
57 |
2 |
p. 162-166 |
artikel |
9 |
Modeling the acoustical characteristics of silencers for suppressing noise from a gas-turbine unit compressor
|
Mikhailov, V. E. |
|
2010 |
57 |
2 |
p. 146-150 |
artikel |
10 |
Modernizing the K-1000-60/1500 turbine unit’s condensers by replacing the material of cooling tubes
|
Shvetsov, V. L. |
|
2010 |
57 |
2 |
p. 167-172 |
artikel |
11 |
Retrofitting the Strogino district heat supply station with construction of a 260-MW combined-cycle power plant (Consisting of two PGU-130 combined-cycle power units)
|
Aleksandrov, V. F. |
|
2010 |
57 |
2 |
p. 173-174 |
artikel |
12 |
Selecting the thermal circuit and profile of a Russian large new-generation power-generating gas turbine unit and a combined-cycle plant built around it
|
Favorskii, O. N. |
|
2010 |
57 |
2 |
p. 93-98 |
artikel |
13 |
Studies of the thermal circuit of an advanced integrated gasification combined-cycle power plant
|
Grigoruk, D. G. |
|
2010 |
57 |
2 |
p. 125-128 |
artikel |
14 |
Surveying the support structures and foundation of high-speed turbine units using a circular vibrator
|
Don, E. A. |
|
2010 |
57 |
2 |
p. 142-145 |
artikel |
15 |
The effectiveness of using a two-stage delivery-water heating arrangement in combined-cycle plants
|
Evlanov, A. V. |
|
2010 |
57 |
2 |
p. 155-161 |
artikel |
16 |
The high-efficient regenerative cycle of a gas turbine unit with recirculation of combustion products at high pressure
|
Khodus, V. V. |
|
2010 |
57 |
2 |
p. 99-104 |
artikel |
17 |
Topping the 300-MW power unit at the GRES-24 district power station with a GTE-110 gas turbine unit. Technical solutions on the thermal circuit
|
Berezinets, P. A. |
|
2010 |
57 |
2 |
p. 129-137 |
artikel |