nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
ACO-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints
|
Li, Li |
|
2009 |
44 |
9-10 |
p. 985-994 |
artikel |
2 |
Analysis of interaction between geometry and efficiency of impeller pump using rapid prototyping
|
Rajenthirakumar, D. |
|
2009 |
44 |
9-10 |
p. 890-899 |
artikel |
3 |
Analysis of weld pool dynamic during stationary laser–MIG hybrid welding
|
Gao, Zhiguo |
|
2008 |
44 |
9-10 |
p. 870-879 |
artikel |
4 |
A new approach to develop high temperature foam core sandwich structures using air plasma spraying
|
Azarmi, F. |
|
2009 |
44 |
9-10 |
p. 900-905 |
artikel |
5 |
Applications of integrated motion controllers for precise CNC machines
|
Yeh, Syh-Shiuh |
|
2009 |
44 |
9-10 |
p. 906-920 |
artikel |
6 |
A two-phase linear programming methodology for fuzzy multi-objective mixed-model assembly line problem
|
Mahdavi, Iraj |
|
2009 |
44 |
9-10 |
p. 1010-1023 |
artikel |
7 |
Capability indices and nonconforming proportion in univariate and multivariate processes
|
González, Isabel |
|
2009 |
44 |
9-10 |
p. 1036-1050 |
artikel |
8 |
Computer-aided design of experiments: an enabler of agile manufacturing
|
Vinodh, S. |
|
2009 |
44 |
9-10 |
p. 940-954 |
artikel |
9 |
Cutting force on a diamond grit in stone machining
|
Turchetta, S. |
|
2009 |
44 |
9-10 |
p. 854-861 |
artikel |
10 |
Development of a multidisciplinary optimization process for designing optimal pharmaceutical formulations with constrained experimental regions
|
Cho, Byung Rae |
|
2008 |
44 |
9-10 |
p. 841-853 |
artikel |
11 |
Genetic algorithm with new encoding scheme for job shop scheduling
|
Wang, Yong Ming |
|
2008 |
44 |
9-10 |
p. 977-984 |
artikel |
12 |
Greedy randomised dispatching heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties
|
Valente, Jorge M. S. |
|
2009 |
44 |
9-10 |
p. 995-1009 |
artikel |
13 |
Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
|
Zegordi, Seyed Hessameddin |
|
2009 |
44 |
9-10 |
p. 928-939 |
artikel |
14 |
Intrinsic innovations of die sinking electrical discharge machining technology: estimation of its impact
|
Peças, P. |
|
2009 |
44 |
9-10 |
p. 880-889 |
artikel |
15 |
Investigating the feasibility of DLC-coated twist drills in deep-hole drilling
|
Heinemann, Robert K. |
|
2009 |
44 |
9-10 |
p. 862-869 |
artikel |
16 |
Manufacturing grid resource and resource service digital description
|
Hu, Yefa |
|
2009 |
44 |
9-10 |
p. 1024-1035 |
artikel |
17 |
Modeling the material behavior of magnesium alloy AZ31 using different yield criteria
|
Banabic, Dorel |
|
2009 |
44 |
9-10 |
p. 969-976 |
artikel |
18 |
No-wait two-stage multiprocessor flow shop scheduling with unit setup
|
Huang, Rong-Hwa |
|
2008 |
44 |
9-10 |
p. 921-927 |
artikel |
19 |
Numerical modeling of the influence of process parameters and workpiece hardness on white layer formation in AISI 52100 steel
|
Umbrello, D. |
|
2009 |
44 |
9-10 |
p. 955-968 |
artikel |