nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
|
Chou, Fuh-Der |
|
2008 |
43 |
7-8 |
p. 810-821 |
artikel |
2 |
Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
|
Chou, Fuh-Der |
|
|
43 |
7-8 |
p. 810-821 |
artikel |
3 |
A multivariate mean square error optimization of AISI 52100 hardened steel turning
|
Paiva, A. P. |
|
2008 |
43 |
7-8 |
p. 631-643 |
artikel |
4 |
An MILP formulation for optimal scheduling of multi-product batch plant with a heuristic approach
|
Sun, Hua Li |
|
2008 |
43 |
7-8 |
p. 779-784 |
artikel |
5 |
A tabu search algorithm for two-sided assembly line balancing
|
Özcan, Uğur |
|
2008 |
43 |
7-8 |
p. 822-829 |
artikel |
6 |
Bicriteria parallel flow line scheduling using hybrid population-based heuristics
|
Rajeswari, N. |
|
2008 |
43 |
7-8 |
p. 799-804 |
artikel |
7 |
Control charts for individual observations of a bivariate Poisson process
|
Lee Ho, Linda |
|
2008 |
43 |
7-8 |
p. 744-755 |
artikel |
8 |
Development of an automated progressive design system with multiple processes (piercing, bending, and deep drawing) for manufacturing products
|
Hwang, Beom Cheol |
|
2008 |
43 |
7-8 |
p. 644-653 |
artikel |
9 |
Development of an optical measuring system for integrated geometric errors of a three-axis miniaturized machine tool
|
Wang, Wei |
|
2008 |
43 |
7-8 |
p. 701-709 |
artikel |
10 |
Feature-based multi-objective optimization algorithm for model partitioning
|
Wang, Hui-feng |
|
2008 |
43 |
7-8 |
p. 830-840 |
artikel |
11 |
Improvement of mechanical properties of Inconel 718 electron beam welds—influence of welding techniques and postweld heat treatment
|
Madhusudhana Reddy, G. |
|
2008 |
43 |
7-8 |
p. 671-680 |
artikel |
12 |
Influence of roughness parameters and surface texture on friction during sliding of pure lead over 080 M40 steel
|
Menezes, Pradeep L. |
|
2008 |
43 |
7-8 |
p. 731-743 |
artikel |
13 |
In-process heat treatments to improve FS-welded butt joints
|
Fratini, L. |
|
2008 |
43 |
7-8 |
p. 664-670 |
artikel |
14 |
Manufacturing e-quality through integrated web-enabled computer vision and robotics
|
Chiou, Richard |
|
2008 |
43 |
7-8 |
p. 720-730 |
artikel |
15 |
Maximum allowable load of atomic force microscope (AFM) nanorobot
|
Korayem, M. H. |
|
2008 |
43 |
7-8 |
p. 690-700 |
artikel |
16 |
Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain
|
Torabi, S. A. |
|
2008 |
43 |
7-8 |
p. 785-798 |
artikel |
17 |
Prediction of sink depths using nonlinear modeling of injection molding variables
|
Mathivanan, D. |
|
2008 |
43 |
7-8 |
p. 654-663 |
artikel |
18 |
Prediction of tool wear using regression and ANN models in end-milling operation a critical review
|
Erdik, Tarkan |
|
2008 |
43 |
7-8 |
p. 765-766 |
artikel |
19 |
Process capability analysis based on minimum production cost and quality loss
|
Jeang, Angus |
|
2008 |
43 |
7-8 |
p. 710-719 |
artikel |
20 |
Process capability analysis based on minimum production cost and quality loss
|
Jeang, Angus |
|
|
43 |
7-8 |
p. 710-719 |
artikel |
21 |
Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops
|
Zandieh, M. |
|
2008 |
43 |
7-8 |
p. 767-778 |
artikel |
22 |
Single-machine scheduling with a time-dependent deterioration
|
Wang, Ji-Bo |
|
2008 |
43 |
7-8 |
p. 805-809 |
artikel |
23 |
Tool wear and tool life in end milling of 15–5 PH stainless steel under different cooling and lubrication conditions
|
Braghini Junior, Aldo |
|
2008 |
43 |
7-8 |
p. 756-764 |
artikel |
24 |
Ultraprecision turning of electroless nickel: effects of crystal orientation and origin of diamond tools
|
Pramanik, A. |
|
2008 |
43 |
7-8 |
p. 681-689 |
artikel |