nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of two methods for transforming non-normal manufacturing data
|
Chung, S. H. |
|
2006 |
31 |
9-10 |
p. 957-968 |
artikel |
2 |
A design advisor for the optimal inspection of circularity tolerance
|
Ramaswami, Hemant |
|
2006 |
31 |
9-10 |
p. 857-870 |
artikel |
3 |
A finite element-based model for pure waterjet process simulation
|
Maniadaki, Kyriaki |
|
2006 |
31 |
9-10 |
p. 933-940 |
artikel |
4 |
A genetic algorithm for solving the single machine earliness/tardiness problem with distinct due dates and ready times
|
Tsai, Tung-I |
|
2006 |
31 |
9-10 |
p. 994-1000 |
artikel |
5 |
A mixed isomorphism approach for kinematic structure enumeration graphs based on intelligent design and manufacturing
|
Ping, Yang |
|
2006 |
31 |
9-10 |
p. 841-845 |
artikel |
6 |
Analysis and prediction of cutting forces in end milling by means of a geometrical model
|
Tsai, Chung-Liang |
|
2006 |
31 |
9-10 |
p. 888-896 |
artikel |
7 |
Analysis and simulation for a parallel drill point grinder
|
Li, Bing |
|
2006 |
31 |
9-10 |
p. 915-925 |
artikel |
8 |
An effective hybrid particle swarm optimization for no-wait flow shop scheduling
|
Liu, Bo |
|
2006 |
31 |
9-10 |
p. 1001-1011 |
artikel |
9 |
An intelligent process planning system for prismatic parts using STEP features
|
Amaitik, Saleh M. |
|
2006 |
31 |
9-10 |
p. 978-993 |
artikel |
10 |
A novel arc-spraying robot for rapid tooling
|
He, Zhongyun |
|
2006 |
31 |
9-10 |
p. 1012-1020 |
artikel |
11 |
Application of particle swarm optimisation in artificial neural network for the prediction of tool life
|
Natarajan, U. |
|
2006 |
31 |
9-10 |
p. 871-876 |
artikel |
12 |
A successive approximation algorithm for the inverse position analysis of the general serial manipulators
|
Zhao, Yongjie |
|
2006 |
31 |
9-10 |
p. 1021-1027 |
artikel |
13 |
A technique for advanced manufacturing systems capability evaluation and comparison (ACEC)
|
Mousavi, A. |
|
2006 |
31 |
9-10 |
p. 1044-1048 |
artikel |
14 |
Coordinating supply chain response-time: a bi-level programming approach
|
Yang, W. |
|
2006 |
31 |
9-10 |
p. 1034-1043 |
artikel |
15 |
Development of a high–resolution rapid prototyping system for small size objects
|
Xu, Guangshen |
|
2006 |
31 |
9-10 |
p. 941-947 |
artikel |
16 |
FIPA agent-based control system design for FMS
|
Zhou, Bing-hai |
|
2006 |
31 |
9-10 |
p. 969-977 |
artikel |
17 |
Influence of material flow constraints during cold forming on the deformation and densification behaviour of hypoeutectoid P/M steel ring preforms
|
Chandramouli, R. |
|
2006 |
31 |
9-10 |
p. 926-932 |
artikel |
18 |
Infrastructure for co-ordination of multi-agents in a network–based manufacturing system
|
Chan, Felix T. S. |
|
2005 |
31 |
9-10 |
p. 1028-1033 |
artikel |
19 |
Investigation of dry machining with embedded heat pipe cooling by finite element analysis and experiments
|
Chiou, Richard Y. |
|
2006 |
31 |
9-10 |
p. 905-914 |
artikel |
20 |
Review of dynamic issues in micro-end-milling
|
Miao, J. C. |
|
2006 |
31 |
9-10 |
p. 897-904 |
artikel |
21 |
Surface error decomposition for fixture development
|
Wang, Y. |
|
2006 |
31 |
9-10 |
p. 948-956 |
artikel |
22 |
The development of an in-process surface roughness adaptive control system in end milling operations
|
Zhang, Julie Z. |
|
2006 |
31 |
9-10 |
p. 877-887 |
artikel |
23 |
Virtual engineering approaches in product and process design
|
Cecil, J. |
|
2006 |
31 |
9-10 |
p. 846-856 |
artikel |