nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A scatter search approach for general flowshop scheduling problem
|
Haq, A. Noorul |
|
2006 |
31 |
7-8 |
p. 731-736 |
artikel |
2 |
Assembly planning using a novel immune approach
|
Cao, P.-B. |
|
2006 |
31 |
7-8 |
p. 770-782 |
artikel |
3 |
Assembly planning using a novel immune approach
|
Cao, P.-B. |
|
|
31 |
7-8 |
p. 770-782 |
artikel |
4 |
A study of the characteristics for electrochemical micromachining with ultrashort voltage pulses
|
Lee, E. S. |
|
2005 |
31 |
7-8 |
p. 762-769 |
artikel |
5 |
A two-machine flowshop maximum tardiness scheduling problem with a learning effect
|
Wu, Chin-Chia |
|
2006 |
31 |
7-8 |
p. 743-750 |
artikel |
6 |
Combination of robot control and assembly planning for a precision manipulator
|
Liu, Zhiqi |
|
2006 |
31 |
7-8 |
p. 797-804 |
artikel |
7 |
Development of a new cluster index for wafer defects
|
Tong, Lee-Ing |
|
2006 |
31 |
7-8 |
p. 705-715 |
artikel |
8 |
Estimation of the chatter zones of drilled holes by using s-transformation
|
Yenilmez, A. |
|
2006 |
31 |
7-8 |
p. 638-644 |
artikel |
9 |
Fabrication of WC micro-shaft by using electrochemical etching
|
Choi, S. H. |
|
2006 |
31 |
7-8 |
p. 682-687 |
artikel |
10 |
Flow patterns in gas-assisted injection molding process in a channel
|
Hsu, Cheng-Hsing |
|
2006 |
31 |
7-8 |
p. 673-681 |
artikel |
11 |
Heuristic solution approaches for combined-job sequencing and machine loading problem in flexible manufacturing systems
|
Tiwari, M. K. |
|
2006 |
31 |
7-8 |
p. 716-730 |
artikel |
12 |
Industrial applications of the ant colony optimization algorithm
|
Fox, Bud |
|
2006 |
31 |
7-8 |
p. 805-814 |
artikel |
13 |
Internet-based remote access for a manufacturing-oriented teleservice
|
Qiao, Fei |
|
2005 |
31 |
7-8 |
p. 825-832 |
artikel |
14 |
KBE-based stamping process paths generated for automobile panels
|
Zheng, Jinqiao |
|
2006 |
31 |
7-8 |
p. 663-672 |
artikel |
15 |
Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness
|
Natarajan, K. |
|
2006 |
31 |
7-8 |
p. 751-761 |
artikel |
16 |
Process modelling and optimisation using artificial neural networks and gradient search method
|
Bai, H. |
|
2006 |
31 |
7-8 |
p. 790-796 |
artikel |
17 |
Remote machine maintenance system through Internet and mobile communication
|
Wang, Wanbin |
|
2006 |
31 |
7-8 |
p. 783-789 |
artikel |
18 |
Robust and stable scheduling of a single machine with random machine breakdowns
|
Liu, Lin |
|
2006 |
31 |
7-8 |
p. 645-654 |
artikel |
19 |
Scheduling of jobs and maintenance in a textile company
|
Chen, W. J. |
|
2006 |
31 |
7-8 |
p. 737-742 |
artikel |
20 |
Simultaneous process mean and process tolerance determination with asymmetrical loss function
|
Jeang, Angus |
|
2005 |
31 |
7-8 |
p. 694-704 |
artikel |
21 |
Tackling uncertainty in ERP-controlled manufacturing environment: A knowledge management approach
|
Koh, S. C. L. |
|
2005 |
31 |
7-8 |
p. 833-840 |
artikel |
22 |
The method of cut-joint kinematic constraint: velocity propagations
|
Abdel-Malek, Karim |
|
2006 |
31 |
7-8 |
p. 815-824 |
artikel |
23 |
The upper bound of tool edge radius for nanoscale ductile mode cutting of silicon wafer
|
Arefin, S. |
|
2006 |
31 |
7-8 |
p. 655-662 |
artikel |
24 |
The use of ultrasonic cavitation peening to improve micro-burr-free surfaces
|
Toh, C. K. |
|
2006 |
31 |
7-8 |
p. 688-693 |
artikel |
25 |
Tribological evaluation of TiN and TiAlN coated PM-HSS gear cutter when machining 19MnCr5 steel
|
Santos, J. A. B. O. dos |
|
2006 |
31 |
7-8 |
p. 629-637 |
artikel |