nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An optimisation model for scheduling the decommissioning of an offshore wind farm
|
Irawan, Chandra Ade |
|
2019 |
41 |
2 |
p. 513-548 |
artikel |
2 |
Bi-criteria path problem with minimum length and maximum survival probability
|
Halman, Nir |
|
2018 |
41 |
2 |
p. 469-489 |
artikel |
3 |
Capacitated ring arborescence problems with profits
|
Hill, Alessandro |
|
2018 |
41 |
2 |
p. 357-389 |
artikel |
4 |
Controlling distribution conveyors and multiline palletizers: theoretical foundations and online algorithms
|
Gurski, Frank |
|
2019 |
41 |
2 |
p. 581-611 |
artikel |
5 |
Decision making in multiobjective optimization problems under uncertainty: balancing between robustness and quality
|
Zhou-Kangas, Yue |
|
2018 |
41 |
2 |
p. 391-413 |
artikel |
6 |
Organ transplantation logistics: a case for Turkey
|
Savaşer, Sinem |
|
2018 |
41 |
2 |
p. 327-356 |
artikel |
7 |
Route feasibility testing and forward time slack for the Synchronized Pickup and Delivery Problem
|
Gschwind, Timo |
|
2018 |
41 |
2 |
p. 491-512 |
artikel |
8 |
The train-to-yard assignment problem
|
Otto, Alena |
|
2019 |
41 |
2 |
p. 549-580 |
artikel |
9 |
Time-constrained maximal covering routing problem
|
Amiri, Afsaneh |
|
2018 |
41 |
2 |
p. 415-468 |
artikel |
10 |
Time-constrained maximal covering routing problem
|
Amiri, Afsaneh |
|
|
41 |
2 |
p. 415-468 |
artikel |