nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Building Antileakage Structures in Hard-Rock Foundations of Far North Power Plants
|
V. I. Fedoseev |
|
2001 |
|
8 |
p. 406-411 6 p. |
artikel |
2 |
Building Antileakage Structures in Hard-Rock Foundations of Far North Power Plants
|
Fedoseev, V. I. |
|
2001 |
|
8 |
p. 406-411 |
artikel |
3 |
Cementation Operations in the Building of the Kousar Dam, Iran
|
G. G. Tuzhikhin |
|
2001 |
|
8 |
p. 402-405 4 p. |
artikel |
4 |
Cementation Operations in the Building of the Kousar Dam, Iran
|
Tuzhikhin, G. G. |
|
2001 |
|
8 |
p. 402-405 |
artikel |
5 |
Designing and Constructing Antileakage Devices in the Foundations of the Bureya Dam
|
E. S. Argal |
|
2001 |
|
8 |
p. 394-401 8 p. |
artikel |
6 |
Designing and Constructing Antileakage Devices in the Foundations of the Bureya Dam
|
Argal, E. S. |
|
2001 |
|
8 |
p. 394-401 |
artikel |
7 |
Designing and Performing Water Drawdown Operations in the Construction of Major Power Plants
|
E. A. Lokhankova |
|
2001 |
|
8 |
p. 389-393 5 p. |
artikel |
8 |
Designing and Performing Water Drawdown Operations in the Construction of Major Power Plants
|
Lokhankova, E. A. |
|
2001 |
|
8 |
p. 389-393 |
artikel |
9 |
Determination of Optimal Blast Parameters for Construction of Blast-Created Rock-Fill Dams
|
M. B. Étkin |
|
2001 |
|
8 |
p. 421-427 7 p. |
artikel |
10 |
Determination of Optimal Blast Parameters for Construction of Blast-Created Rock-Fill Dams
|
Étkin, M. B. |
|
2001 |
|
8 |
p. 421-427 |
artikel |
11 |
Generalized Representation of Seismic Process for Dynamic Calculation of the Effect of Explosions
|
M. I. Shuifer |
|
2001 |
|
8 |
p. 428-431 4 p. |
artikel |
12 |
Generalized Representation of Seismic Process for Dynamic Calculation of the Effect of Explosions
|
Shuifer, M. I. |
|
2001 |
|
8 |
p. 428-431 |
artikel |
13 |
Investigations of the Penetrability of Cement Grout into a Cavity Having a Small Opening
|
V. A. Ashikhmen |
|
2001 |
|
8 |
p. 436-440 5 p. |
artikel |
14 |
Investigations of the Penetrability of Cement Grout into a Cavity Having a Small Opening
|
Ashikhmen, V. A. |
|
2001 |
|
8 |
p. 436-440 |
artikel |
15 |
Refinement of Method of Building Grout Curtains in Permanently Frozen Rock Beds of Water-Development Works
|
V. N. Frumkin |
|
2001 |
|
8 |
p. 412-420 9 p. |
artikel |
16 |
Refinement of Method of Building Grout Curtains in Permanently Frozen Rock Beds of Water-Development Works
|
Frumkin, V. N. |
|
2001 |
|
8 |
p. 412-420 |
artikel |
17 |
Selection of Efficient Process Flow Charts for Construction of Lengthy Tunnels
|
M. G. Bikineev |
|
2001 |
|
8 |
p. 432-435 4 p. |
artikel |
18 |
Selection of Efficient Process Flow Charts for Construction of Lengthy Tunnels
|
Bikineev, M. G. |
|
2001 |
|
8 |
p. 432-435 |
artikel |