nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Comparative Analysis of Technologies for Covering Peak Loads in the Power System
|
Zhuk, A. Z. |
|
2015 |
49 |
4 |
p. 310-318 |
artikel |
2 |
Analysis and Prospects of the Development of Models for Preventing Fatigue Failures of Mechanical Systems of Navigation Hydraulic-Engineering Facilities
|
Kuz’mitskii, M. L. |
|
2015 |
49 |
4 |
p. 233-236 |
artikel |
3 |
Assessing the Possibility of Participation of Cross-Connection Thermal Power Plants in Assigned-Reserve Primary Frequency Control
|
Zorchenko, N. V. |
|
2015 |
49 |
4 |
p. 278-282 |
artikel |
4 |
Automated Satellite System for Strain Monitoring at the Sayano-Shushenskaya Hydroelectric Power Plant. Practical Experience in its Introduction
|
Gutov, S. S. |
|
2015 |
49 |
4 |
p. 252-257 |
artikel |
5 |
Determination of the Induced Voltages When Nonparallel Power Transmission Lines are Adjacent to One Another
|
Zakaryukin, V. P. |
|
2015 |
49 |
4 |
p. 304-309 |
artikel |
6 |
Determining the Effective Length of Gravitational Settler Chambers
|
Mikhailov, I. E. |
|
2015 |
49 |
4 |
p. 274-277 |
artikel |
7 |
3D Modeling Technology in Design of Hydropower Facilities
|
Ustinov, A. V. |
|
2015 |
49 |
4 |
p. 237-239 |
artikel |
8 |
Efficiency of Anti-Seepage Systems in the Foundation of the Svetlinskaya Hydroelectric Power Plant Building
|
Starshinov, S. N. |
|
2015 |
49 |
4 |
p. 245-251 |
artikel |
9 |
Governing the Turbine-Generator Unit of a Small-Scale Hydropower Plant with a Long Penstock
|
Berlin, V. V. |
|
2015 |
49 |
4 |
p. 240-244 |
artikel |
10 |
Methods for Monitoring the Vacuum Seals of Turbine Systems and Vacuum Deaerators
|
Sharapov, V. I. |
|
2015 |
49 |
4 |
p. 287-290 |
artikel |
11 |
New steam silencers developed at MPÉI
|
Tupov, V. B. |
|
2015 |
49 |
4 |
p. 301-303 |
artikel |
12 |
Organizing Continuous Monitoring and Recording of Atmospheric Pollution at Thermal Power Plants
|
Roslyakov, P. V. |
|
2015 |
49 |
4 |
p. 296-300 |
artikel |
13 |
Predicting the Influence of a Water-Ice Cloud Behind Boguchanskaya HPP Spillways Nos. 1 and 2 on Hydroproject Facilities in Winter Under Emergency Operating Conditions
|
Belikov, V. V. |
|
2015 |
49 |
4 |
p. 258-268 |
artikel |
14 |
Procedure for Determining the Residual Life of Steel Grade Di59 Superheaters
|
Bogachev, V. A. |
|
2015 |
49 |
4 |
p. 283-286 |
artikel |
15 |
Structure and Thermal Conductivity of Air Flow in a Ventilated HPP Building Facade
|
Girgidov, A. D. |
|
2015 |
49 |
4 |
p. 269-273 |
artikel |
16 |
Temperature State of the Flow-Through Part of a T-125/150 PGU-450 Steam Turbine Operating in the Steam-Free and Motor Regimes
|
Arakelyan, É. K. |
|
2015 |
49 |
4 |
p. 291-295 |
artikel |