nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An estimate of the additional operating costs due to the participation of gas-oil power plants in frequency and power regulation
|
Zorchenko, N. V. |
|
2011 |
45 |
4 |
p. 292-296 |
artikel |
2 |
Calculation of the transit losses of electric power in the radial networks of electric supply systems
|
Komlev, Yu. M. |
|
2011 |
45 |
4 |
p. 309-314 |
artikel |
3 |
Dam safety exemplfied by bed diagnostics for the Boguchany HPP currently under construction
|
|
|
2011 |
45 |
4 |
p. 258-263 |
artikel |
4 |
Development of standardized boilers with a circulating fluidized bed for repowering of TPPs
|
Ryabov, G. A. |
|
2011 |
45 |
4 |
p. 278-284 |
artikel |
5 |
Experience in using the VGT 110 kv gas-filled circuit breakers in the UFA TÉTS-2 thermal power plant
|
Mamalimov, A. G. |
|
2011 |
45 |
4 |
p. 315-317 |
artikel |
6 |
Full-scale testing of new technical solutions for a furnace water-wall system and full-opening separator for a P-50R boiler of a 330-MW power unit
|
Shvarts, A. L. |
|
2011 |
45 |
4 |
p. 297-304 |
artikel |
7 |
Improvement of the thermal expansions and vibration reliability in the pgrading of the K-330-240 turbo units of the kashira state regional power plant (GRÉS)
|
Don, E. A. |
|
2011 |
45 |
4 |
p. 305-308 |
artikel |
8 |
Numerical hydrodynamic models in elevation rasters of geographic information systems
|
Sidorov, N. P. |
|
2011 |
45 |
4 |
p. 270-277 |
artikel |
9 |
Placement of the dam for the no. 2 kambaratinskaya HPP by large-scale blasting: some observations
|
Shuifer, M. I. |
|
2011 |
45 |
4 |
p. 245-253 |
artikel |
10 |
Safety problems of water-development works designed for land reclamation
|
Shchedrin, V. N. |
|
2011 |
45 |
4 |
p. 264-269 |
artikel |
11 |
Thermal tests of the 45 MW SGT-800 Gas-Turbine equipment
|
Ol’khovskii, G. G. |
|
2011 |
45 |
4 |
p. 285-291 |
artikel |
12 |
Use of hydraulic excavation for cleaning and construction of water bodies
|
Smetanin, V. I. |
|
2011 |
45 |
4 |
p. 254-257 |
artikel |