nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A heuristic master planning algorithm for recycling supply chain management
|
Chern, Ching-Chin |
|
2015 |
28 |
4 |
p. 985-1003 |
artikel |
2 |
An integer programming model for discovering associations between manufacturing system capabilities and product features
|
Kashkoush, Mohamed |
|
2015 |
28 |
4 |
p. 1031-1044 |
artikel |
3 |
A production-inventory model with imperfect production process and partial backlogging under learning considerations in fuzzy random environments
|
Mahata, Gour Chandra |
|
2014 |
28 |
4 |
p. 883-897 |
artikel |
4 |
BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem
|
Furlan, Marcos Mansano |
|
2015 |
28 |
4 |
p. 929-944 |
artikel |
5 |
Coordinated scheduling of the transfer lots in an assembly-type supply chain: a genetic algorithm approach
|
İnkaya, Tülin |
|
2015 |
28 |
4 |
p. 1005-1015 |
artikel |
6 |
Coordinative production and maintenance scheduling problem with flexible maintenance time intervals
|
Khatami, Mostafa |
|
2014 |
28 |
4 |
p. 857-867 |
artikel |
7 |
Deciding product mix based on time-driven activity-based costing by mixed integer programming
|
Zhuang, Zheng-Yun |
|
2015 |
28 |
4 |
p. 959-974 |
artikel |
8 |
Development of an evaluation system for blasting patterns to provide efficient production
|
Yari, Mojtaba |
|
2015 |
28 |
4 |
p. 975-984 |
artikel |
9 |
Enhancing the monitoring of 3D scanned manufactured parts through projections and spatiotemporal control charts
|
He, Ketai |
|
2014 |
28 |
4 |
p. 899-911 |
artikel |
10 |
Evaluating a green supplier selection problem using a hybrid MODM algorithm
|
Bakeshlou, Ehsan Afshar |
|
2014 |
28 |
4 |
p. 913-927 |
artikel |
11 |
Machinery condition prediction based on wavelet and support vector machine
|
Liu, Shujie |
|
2015 |
28 |
4 |
p. 1045-1055 |
artikel |
12 |
Optimization and practical verification of system configuration parameter design for a photovoltaic thermal system combined with a reflector
|
Kuo, Chung-Feng Jeffrey |
|
2015 |
28 |
4 |
p. 1017-1029 |
artikel |
13 |
Process configuration based on generative constraint satisfaction problem
|
Wang, Lin |
|
2015 |
28 |
4 |
p. 945-957 |
artikel |
14 |
Remanufacturer’s production strategy with capital constraint and differentiated demand
|
Wang, Yu-yan |
|
2014 |
28 |
4 |
p. 869-882 |
artikel |