nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A multilevel approach for modelling vehicle routing problem with uncertain travelling time
|
Ning, Yufu |
|
2014 |
28 |
3 |
p. 683-688 |
artikel |
2 |
An effective hybrid evolutionary algorithm for stochastic multiobjective assembly line balancing problem
|
Zhang, Wenqiang |
|
2015 |
28 |
3 |
p. 783-790 |
artikel |
3 |
A new model for single machine scheduling with uncertain processing time
|
Hu, Kai |
|
2015 |
28 |
3 |
p. 717-725 |
artikel |
4 |
An interactive satisficing approach for multi-objective optimization with uncertain parameters
|
Zhong, Shuya |
|
2014 |
28 |
3 |
p. 535-547 |
artikel |
5 |
An uncertain goal programming model for machine scheduling problem
|
Li, Runyu |
|
2014 |
28 |
3 |
p. 689-694 |
artikel |
6 |
An uncertain search model for recruitment problem with enterprise performance
|
Zhou, Chi |
|
2014 |
28 |
3 |
p. 695-704 |
artikel |
7 |
A portfolio optimization model for minimizing soft margin-based generalization bound
|
Ha, Minghu |
|
2014 |
28 |
3 |
p. 759-766 |
artikel |
8 |
Bang–bang control model with optimistic value criterion for uncertain switched systems
|
Yan, Hongyan |
|
2014 |
28 |
3 |
p. 527-534 |
artikel |
9 |
Bang–bang property for an uncertain saddle point problem
|
Sun, Yun |
|
2014 |
28 |
3 |
p. 605-613 |
artikel |
10 |
Bayesian equilibria for uncertain bimatrix game with asymmetric information
|
Yang, Xiangfeng |
|
2014 |
28 |
3 |
p. 515-525 |
artikel |
11 |
Cost estimation of building individual cooperative housing with crowdfunding model: case of Beijing, China
|
Liu, Jiajia |
|
2014 |
28 |
3 |
p. 749-757 |
artikel |
12 |
Credibilistic clustering algorithms via alternating cluster estimation
|
Zhou, Jian |
|
2014 |
28 |
3 |
p. 727-738 |
artikel |
13 |
Dispatching medical supplies in emergency events via uncertain programming
|
Li, Hui |
|
2014 |
28 |
3 |
p. 549-558 |
artikel |
14 |
Dynamic configuration of QC allocating problem based on multi-objective genetic algorithm
|
Liang, ChengJi |
|
2015 |
28 |
3 |
p. 847-855 |
artikel |
15 |
Dynamic joint construction and optimal operation strategy of multi-period reverse logistics network: a case study of Shanghai apparel E-commerce enterprises
|
Guo, Jianquan |
|
2015 |
28 |
3 |
p. 819-831 |
artikel |
16 |
Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem
|
Hao, Xinchang |
|
2015 |
28 |
3 |
p. 833-845 |
artikel |
17 |
Foreword to the special issue of journal of intelligent manufacturing on uncertain models in intelligent manufacturing systems: dedicated to professor Mistuo Gen for his 70th birthday
|
Peng, Jin |
|
2014 |
28 |
3 |
p. 501-502 |
artikel |
18 |
Hybrid multilevel programming with uncertain random parameters
|
Ke, Hua |
|
2014 |
28 |
3 |
p. 589-596 |
artikel |
19 |
Minimum spanning tree problem of uncertain random network
|
Sheng, Yuhong |
|
2014 |
28 |
3 |
p. 565-574 |
artikel |
20 |
Monitoring mechanisms in new product development with risk-averse project manager
|
Yang, Kai |
|
2014 |
28 |
3 |
p. 667-681 |
artikel |
21 |
Optimal dealer pricing under transaction uncertainty
|
Guo, Cheng |
|
2014 |
28 |
3 |
p. 657-665 |
artikel |
22 |
Optimal lot-sizing and joint replenishment strategy under a piecewise linear warehousing cost structure
|
Yao, Ming-Jong |
|
2014 |
28 |
3 |
p. 791-803 |
artikel |
23 |
Option pricing formulas for uncertain financial market based on the exponential Ornstein–Uhlenbeck model
|
Dai, Lanruo |
|
2014 |
28 |
3 |
p. 597-604 |
artikel |
24 |
Pricing decision problem for substitutable products based on uncertainty theory
|
Huang, Hu |
|
2014 |
28 |
3 |
p. 503-514 |
artikel |
25 |
Study on two-stage uncertain programming based on uncertainty theory
|
Zheng, Mingfa |
|
2014 |
28 |
3 |
p. 633-642 |
artikel |
26 |
Supplier collaboration and speed-to-market of new products: the mediating and moderating effects
|
Zhang, Ying |
|
2015 |
28 |
3 |
p. 805-818 |
artikel |
27 |
The impact of decision criteria on deadline-based incentive contracts in project management
|
Wang, Jiao |
|
2014 |
28 |
3 |
p. 643-655 |
artikel |
28 |
Toward algorithms for multi-modal shortest path problem and their extension in urban transit network
|
Liu, Linzhong |
|
2014 |
28 |
3 |
p. 767-781 |
artikel |
29 |
Two-agent scheduling problem under fuzzy environment
|
Ni, Yaodong |
|
2014 |
28 |
3 |
p. 739-748 |
artikel |
30 |
Uncapacitated $$p$$p-hub location problem with fixed costs and uncertain flows
|
Qin, Zhongfeng |
|
2014 |
28 |
3 |
p. 705-716 |
artikel |
31 |
Uncertain expected utility function and its risk premium
|
Chen, Xiaowei |
|
2015 |
28 |
3 |
p. 581-587 |
artikel |
32 |
Uncertain linear regression model and its application
|
Guo, Haiying |
|
2014 |
28 |
3 |
p. 559-564 |
artikel |
33 |
Uncertain programming model for uncertain minimum weight vertex covering problem
|
Chen, Lin |
|
2014 |
28 |
3 |
p. 625-632 |
artikel |
34 |
Uncertain project scheduling problem with resource constraints
|
Ji, Xiaoyu |
|
2014 |
28 |
3 |
p. 575-580 |
artikel |
35 |
Uncertain risk aversion
|
Zhou, Jian |
|
2014 |
28 |
3 |
p. 615-624 |
artikel |