nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A constraint programming model for the scheduling of JIT cross-docking systems with preemption
|
Fazel Zarandi, M. H. |
|
2014 |
27 |
2 |
p. 297-313 |
artikel |
2 |
A hybrid cuckoo search-genetic algorithm for hole-making sequence optimization
|
Lim, W. C. E. |
|
2014 |
27 |
2 |
p. 417-429 |
artikel |
3 |
An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine
|
Li, Dongni |
|
2014 |
27 |
2 |
p. 283-296 |
artikel |
4 |
An ACO-based online routing method for multiple order pickers with congestion consideration in warehouse
|
Chen, Fangyu |
|
2014 |
27 |
2 |
p. 389-408 |
artikel |
5 |
An efficient method for defect detection during the manufacturing of web materials
|
Bulnes, Francisco G. |
|
2014 |
27 |
2 |
p. 431-445 |
artikel |
6 |
A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
|
Pérez, Miguel A. Fernández |
|
2014 |
27 |
2 |
p. 409-416 |
artikel |
7 |
A novel framework to evaluate programmable logic controllers: a fuzzy MCDM perspective
|
Wang, Chih-Hsuan |
|
2014 |
27 |
2 |
p. 315-324 |
artikel |
8 |
Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives
|
Gao, K. Z. |
|
2014 |
27 |
2 |
p. 363-374 |
artikel |
9 |
Evolutionary resource assignment for workload-based production scheduling
|
Moon, Ilkyeong |
|
2014 |
27 |
2 |
p. 375-388 |
artikel |
10 |
Identifying and evaluating enterprise architecture risks using FMEA and fuzzy VIKOR
|
Safari, Hossein |
|
2014 |
27 |
2 |
p. 475-486 |
artikel |
11 |
Intelligent maintenance prediction system for LED wafer testing machine
|
Hsu, Chien-Chang |
|
2014 |
27 |
2 |
p. 335-342 |
artikel |
12 |
Modeling, analysis and multi-objective optimization of twist extrusion process using predictive models and meta-heuristic approaches, based on finite element results
|
Bakhtiari, Hamed |
|
2014 |
27 |
2 |
p. 463-473 |
artikel |
13 |
Multi-agent reinforcement learning based maintenance policy for a resource constrained flow line system
|
Wang, Xiao |
|
2014 |
27 |
2 |
p. 325-333 |
artikel |
14 |
Prediction of drill flank wear using ensemble of co-evolutionary particle swarm optimization based-selective neural network ensembles
|
Yang, Wen-An |
|
2014 |
27 |
2 |
p. 343-361 |
artikel |
15 |
Shop-floor resource virtualization layer with private cloud support
|
Morariu, Octavian |
|
2014 |
27 |
2 |
p. 447-462 |
artikel |