nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Chaotic Bee Colony approach for supplier selection-order allocation with different discounting policies in a coopetitive multi-echelon supply chain
|
Jain, Vipul |
|
2013 |
26 |
6 |
p. 1131-1144 |
artikel |
2 |
A graph-based pipe routing algorithm in aero-engine rotational space
|
Liu, Qiang |
|
2013 |
26 |
6 |
p. 1077-1083 |
artikel |
3 |
A heuristic nonlinear operator for the aggregation of incomplete judgment matrices in group decision making
|
Jiao, Bo |
|
2013 |
26 |
6 |
p. 1253-1266 |
artikel |
4 |
A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem
|
Jalilvand-Nejad, Amir |
|
2013 |
26 |
6 |
p. 1085-1098 |
artikel |
5 |
An integrated optimization of location assignment and storage/retrieval scheduling in multi-shuttle automated storage/retrieval systems
|
Yang, Peng |
|
2013 |
26 |
6 |
p. 1145-1159 |
artikel |
6 |
A process prediction model based on Cuckoo algorithm for abrasive waterjet machining
|
Mohamad, Azizah |
|
2013 |
26 |
6 |
p. 1247-1252 |
artikel |
7 |
A reinforcement learning based approach for a multiple-load carrier scheduling problem
|
Chen, Ci |
|
2013 |
26 |
6 |
p. 1233-1245 |
artikel |
8 |
A rule-based system for trade-off among energy consumption, tool life, and productivity in machining process
|
Iqbal, Asif |
|
2013 |
26 |
6 |
p. 1217-1232 |
artikel |
9 |
A study on the man-hour prediction system for shipbuilding
|
Hur, Minhoe |
|
2013 |
26 |
6 |
p. 1267-1279 |
artikel |
10 |
Autoregressive coefficient-invariant control chart pattern recognition in autocorrelated manufacturing processes using neural network ensemble
|
Yang, Wen-An |
|
2013 |
26 |
6 |
p. 1161-1180 |
artikel |
11 |
Curve fitting optimization based on a mixed model for assembly applications
|
Xiang, Gao |
|
2013 |
26 |
6 |
p. 1113-1120 |
artikel |
12 |
Failure time prediction for mechanical device based on the degradation sequence
|
Wang, Yuanhang |
|
2013 |
26 |
6 |
p. 1181-1199 |
artikel |
13 |
Implementation of web-based manufacturing process aid in the electronic assembly shop floor
|
Li, Debiao |
|
2013 |
26 |
6 |
p. 1281-1290 |
artikel |
14 |
Learning and reuse of engineering ramp-up strategies for modular assembly systems
|
Scrimieri, Daniele |
|
2013 |
26 |
6 |
p. 1063-1076 |
artikel |
15 |
Optimization of bone drilling using Taguchi methodology coupled with fuzzy based desirability function approach
|
Pandey, Rupesh Kumar |
|
2013 |
26 |
6 |
p. 1121-1129 |
artikel |
16 |
Swarm lexicographic goal programming for fuzzy open shop scheduling
|
Palacios, Juan José |
|
2013 |
26 |
6 |
p. 1201-1215 |
artikel |
17 |
Unrelated parallel-machine scheduling to minimize total weighted completion time
|
Chen, Jeng-Fung |
|
2013 |
26 |
6 |
p. 1099-1112 |
artikel |