nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A capacity allocation and expansion model for TFT-LCD multi-site manufacturing
|
Chen, Tzu-Li |
|
2012 |
24 |
4 |
p. 847-872 |
artikel |
2 |
A comparison of multiobjective depth-first algorithms
|
Coego, J. |
|
2012 |
24 |
4 |
p. 821-829 |
artikel |
3 |
A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates
|
Nie, Li |
|
2012 |
24 |
4 |
p. 763-774 |
artikel |
4 |
A new adaptive slicing approach for the fully dense freeform fabrication (FDFF) process
|
Hayasi, Mohammad T. |
|
2011 |
24 |
4 |
p. 683-694 |
artikel |
5 |
An upgraded artificial bee colony (ABC) algorithm for constrained optimization problems
|
Brajevic, Ivona |
|
2012 |
24 |
4 |
p. 729-740 |
artikel |
6 |
Application of fuzzy logic and regression analysis for modeling surface roughness in face milliing
|
Kovac, P. |
|
2012 |
24 |
4 |
p. 755-762 |
artikel |
7 |
Applying modified NSGA-II for bi-objective supply chain problem
|
Bandyopadhyay, Susmita |
|
2011 |
24 |
4 |
p. 707-716 |
artikel |
8 |
Feature-based generation of machining process plans for optimised parts manufacture
|
Deja, Mariusz |
|
2012 |
24 |
4 |
p. 831-846 |
artikel |
9 |
Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times
|
González, Miguel A. |
|
2012 |
24 |
4 |
p. 741-754 |
artikel |
10 |
Maintenance scheduling incorporating dynamics of production system and real-time information from workstations
|
Arab, Ali |
|
2011 |
24 |
4 |
p. 695-705 |
artikel |
11 |
Model selection with considering the CO2 emission alone the global supply chain
|
Le, Thi Phuong Nha |
|
2011 |
24 |
4 |
p. 653-672 |
artikel |
12 |
Multi-objective energy aware multiprocessor scheduling using bat intelligence
|
Malakooti, Behnam |
|
2012 |
24 |
4 |
p. 805-819 |
artikel |
13 |
Multi-objective prediction model for the establishment of sputtered GZO semiconducting transparent thin films
|
Yang, Ching-Been |
|
2011 |
24 |
4 |
p. 673-682 |
artikel |
14 |
Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows
|
Belmecheri, Farah |
|
2012 |
24 |
4 |
p. 775-789 |
artikel |
15 |
Process planning optimization for parallel drilling of blind holes using a two phase genetic algorithm
|
Li, Shujuan |
|
2012 |
24 |
4 |
p. 791-804 |
artikel |
16 |
Production planning optimization for manufacturing and remanufacturing system in stochastic environment
|
Naeem, Mohd. Arshad |
|
2012 |
24 |
4 |
p. 717-728 |
artikel |