nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Column-Generation Approach for the Assembly System Design Problem with Tool Changes
|
Wilbert E. Wilhelm |
|
1999 |
|
2 |
p. 177-205 29 p. |
artikel |
2 |
A Column-Generation Approach for the Assembly System Design Problem with Tool Changes
|
Wilhelm, Wilbert E. |
|
1999 |
|
2 |
p. 177-205 |
artikel |
3 |
A Decentralized Approach to Estimate Activity-Based Costs andNear-Optimal Resource Allocation in Flexible Manufacturing Systems
|
Alok Gupta |
|
1997 |
|
2 |
p. 167-193 27 p. |
artikel |
4 |
A Decentralized Approach to Estimate Activity-Based Costs and Near-Optimal Resource Allocation in Flexible Manufacturing Systems
|
Gupta, Alok |
|
1997 |
|
2 |
p. 167-193 |
artikel |
5 |
Agent-Oriented Supply-Chain Management
|
Mark S. Fox |
|
2000 |
|
2 |
p. 165-188 24 p. |
artikel |
6 |
A Heuristic Search Approach Using Approximate Solutions to PetriNet State Equations for Scheduling Flexible ManufacturingSystems
|
Mu Der Jeng |
|
1998 |
|
2 |
p. 139-162 24 p. |
artikel |
7 |
A Heuristic Search Approach Using Approximate Solutions to Petri Net State Equations for Scheduling Flexible Manufacturing Systems
|
Jeng, Mu Der |
|
1998 |
|
2 |
p. 139-162 |
artikel |
8 |
An Assessment Framework for Optimal FMS Effectiveness
|
Jason Rupe |
|
2003 |
|
2 |
p. 151-165 15 p. |
artikel |
9 |
An Assessment Framework for Optimal FMS Effectiveness
|
Rupe, Jason |
|
2003 |
|
2 |
p. 151-165 |
artikel |
10 |
A New Cyclic Scheduling Algorithm for Flexible Manufacturing Systems
|
Ouajdi Korbaa |
|
2002 |
|
2 |
p. 173-187 15 p. |
artikel |
11 |
A New Cyclic Scheduling Algorithm for Flexible Manufacturing Systems
|
Korbaa, Ouajdi |
|
2002 |
|
2 |
p. 173-187 |
artikel |
12 |
An Infrastructure for Integrated Automation System Implementation
|
K. Dhinesh Kumar |
|
2004 |
|
2 |
p. 183-199 17 p. |
artikel |
13 |
An Infrastructure for Integrated Automation System Implementation
|
Kumar, K. Dhinesh |
|
2004 |
|
2 |
p. 183-199 |
artikel |
14 |
An Innovative Approach for Using the GRAI Methodology for Reengineering the New Product Introduction Process
|
David Tucker |
|
2001 |
|
2 |
p. 177-193 17 p. |
artikel |
15 |
An Innovative Approach for Using the GRAI Methodology for Reengineering the New Product Introduction Process
|
Tucker, David |
|
2001 |
|
2 |
p. 177-193 |
artikel |
16 |
ANOVA Method for Variance Component Decomposition and Diagnosis in Batch Manufacturing Processes
|
Jionghua Jin |
|
2003 |
|
2 |
p. 167-186 20 p. |
artikel |
17 |
ANOVA Method for Variance Component Decomposition and Diagnosis in Batch Manufacturing Processes
|
Jin, Jionghua |
|
2003 |
|
2 |
p. 167-186 |
artikel |
18 |
A 2-OPT procedure to reduce total inspection time in a serial inspection process
|
Ramasamy, Govindaraj |
|
2006 |
|
2 |
p. 99-119 |
artikel |
19 |
Assembly Root Cause Analysis A Way to Reduce Dimensional Variation in Assembled Products
|
Johan S. Carlson |
|
2003 |
|
2 |
p. 113-150 38 p. |
artikel |
20 |
Assembly Root Cause Analysis: A Way to Reduce Dimensional Variation in Assembled Products
|
Carlson, Johan S. |
|
2003 |
|
2 |
p. 113-150 |
artikel |
21 |
Assessing the structural complexity of manufacturing systems configurations
|
Kuzgunkaya, Onur |
|
2006 |
|
2 |
p. 145-171 |
artikel |
22 |
A Taxonomy of Business Process Modeling and Information Systems Modeling Techniques
|
George M. Giaglis |
|
2001 |
|
2 |
p. 209-228 20 p. |
artikel |
23 |
A Taxonomy of Business Process Modeling and Information Systems Modeling Techniques
|
Giaglis, George M. |
|
2001 |
|
2 |
p. 209-228 |
artikel |
24 |
Average-Cost Optimal Policies for an Unreliable FlexibleMultiproduct Machine
|
Suresh P. Sethi |
|
1999 |
|
2 |
p. 147-157 11 p. |
artikel |
25 |
Average-Cost Optimal Policies for an Unreliable Flexible Multiproduct Machine
|
Sethi, Suresh P. |
|
1999 |
|
2 |
p. 147-157 |
artikel |
26 |
Balancing and Scheduling Mixed-Model U-Shaped Production Lines
|
John Miltenburg |
|
2002 |
|
2 |
p. 119-151 33 p. |
artikel |
27 |
Balancing and Scheduling Mixed-Model U-Shaped Production Lines
|
Miltenburg, John |
|
2002 |
|
2 |
p. 119-151 |
artikel |
28 |
Cascading flowlines and layout modules: Practical strategies for machine duplication in facility layouts
|
Irani, Shahrukh A. |
|
2006 |
|
2 |
p. 119-149 |
artikel |
29 |
Component Partitioning Under Demand and Capacity Uncertainty inPrinted Circuit Board Assembly
|
Wei-Liang Lin |
|
1999 |
|
2 |
p. 159-176 18 p. |
artikel |
30 |
Component Partitioning Under Demand and Capacity Uncertainty in Printed Circuit Board Assembly
|
Lin, Wei-Liang |
|
1999 |
|
2 |
p. 159-176 |
artikel |
31 |
Contributing Authors
|
|
|
2002 |
|
2 |
p. 189-190 2 p. |
artikel |
32 |
Contributing Authors
|
|
|
1998 |
|
2 |
p. 183-185 3 p. |
artikel |
33 |
Contributing Authors
|
|
|
2004 |
|
2 |
p. 201-202 2 p. |
artikel |
34 |
Contributing Authors
|
|
|
2003 |
|
2 |
p. 187-188 2 p. |
artikel |
35 |
Contributing Authors
|
Abdul-Nour, Georges |
|
2006 |
|
2 |
p. 169-171 |
artikel |
36 |
Contributing Authors
|
|
|
2003 |
|
2 |
p. 187-188 |
artikel |
37 |
Contributing Authors
|
|
|
1998 |
|
2 |
p. 183-185 |
artikel |
38 |
Contributing Authors
|
|
|
2002 |
|
2 |
p. 189-190 |
artikel |
39 |
Contributing Authors
|
|
|
2004 |
|
2 |
p. 201-202 |
artikel |
40 |
Cyclic Scheduling of Operations for a Part Type in an FMS Handled by a Single Robot: A Parametric Critical-Path Approach
|
Vladimir Kats |
|
1998 |
|
2 |
p. 129-138 10 p. |
artikel |
41 |
Cyclic Scheduling of Operations for a Part Type in an FMS Handled by a Single Robot: A Parametric Critical-Path Approach
|
Kats, Vladimir |
|
1998 |
|
2 |
p. 129-138 |
artikel |
42 |
Design of Supervisors to Avoid Deadlock in Flexible Assembly Systems
|
Maria Pia Fanti |
|
2002 |
|
2 |
p. 153-171 19 p. |
artikel |
43 |
Design of Supervisors to Avoid Deadlock in Flexible Assembly Systems
|
Fanti, Maria Pia |
|
2002 |
|
2 |
p. 153-171 |
artikel |
44 |
Design-to-Manufacturing Information Management for Electronics Assembly
|
Thomas M. Tirpak |
|
2000 |
|
2 |
p. 189-205 17 p. |
artikel |
45 |
Diagnostics in Disassembly Unscrewing Operations
|
Daniel W. Apley |
|
1998 |
|
2 |
p. 111-128 18 p. |
artikel |
46 |
Diagnostics in Disassembly Unscrewing Operations
|
Apley, Daniel W. |
|
1998 |
|
2 |
p. 111-128 |
artikel |
47 |
Dissimilarity Maximization Method for Real-time Routing of Parts in Random Flexible Manufacturing Systems
|
Can Saygin |
|
2004 |
|
2 |
p. 169-182 14 p. |
artikel |
48 |
Dissimilarity Maximization Method for Real-time Routing of Parts in Random Flexible Manufacturing Systems
|
Saygin, Can |
|
2004 |
|
2 |
p. 169-182 |
artikel |
49 |
Editorial Business Process Reengineering A Modeling Perspective
|
Zahir Irani |
|
2001 |
|
2 |
p. 99-104 6 p. |
artikel |
50 |
Editorial: Business Process Reengineering: A Modeling Perspective
|
Irani, Zahir |
|
2001 |
|
2 |
p. 99-104 |
artikel |
51 |
Engineering the Virtual Enterprise An Architecture-Driven Modeling Approach
|
Adrien Presley |
|
2001 |
|
2 |
p. 145-162 18 p. |
artikel |
52 |
Engineering the Virtual Enterprise: An Architecture-Driven Modeling Approach
|
Presley, Adrien |
|
2001 |
|
2 |
p. 145-162 |
artikel |
53 |
Estimation of the mean waiting time of a customer subject to balking: a simulation study
|
Jang, Jaejin |
|
2007 |
|
2 |
p. 121-144 |
artikel |
54 |
Evaluation of Tools for Modeling Manufacturing Systems Design with Multiple Levels of Detail
|
Tillal Eldabi |
|
2001 |
|
2 |
p. 163-176 14 p. |
artikel |
55 |
Evaluation of Tools for Modeling Manufacturing Systems Design with Multiple Levels of Detail
|
Eldabi, Tillal |
|
2001 |
|
2 |
p. 163-176 |
artikel |
56 |
Flexibility analysis of a surface mount technology electronic assembly plant: An integrated model using simulation
|
Lambert, Serge |
|
2006 |
|
2 |
p. 151-167 |
artikel |
57 |
Grouping PCB Assembly Jobs with Feeders of Several Types
|
Timo Knuutila |
|
2004 |
|
2 |
p. 151-167 17 p. |
artikel |
58 |
Grouping PCB Assembly Jobs with Feeders of Several Types
|
Knuutila, Timo |
|
2004 |
|
2 |
p. 151-167 |
artikel |
59 |
Improvement of earliness and lateness by postponement on an automotive production line
|
Fournier, Xavier |
|
2007 |
|
2 |
p. 107-121 |
artikel |
60 |
Information-Based Dynamic Manufacturing System Scheduling
|
Selwyn Piramuthu |
|
2000 |
|
2 |
p. 219-234 16 p. |
artikel |
61 |
Information-Based Manufacturing in the Informational Age
|
William Fulkerson |
|
2000 |
|
2 |
p. 131-143 13 p. |
artikel |
62 |
Information-Based Manufacturing with the Web
|
Michael J. Shaw |
|
2000 |
|
2 |
p. 115-129 15 p. |
artikel |
63 |
Information Technology for Automated ManufacturingEnterprises: Recent Developments and Current Research Issues
|
M.J. Shaw |
|
1997 |
|
2 |
p. 115-120 6 p. |
artikel |
64 |
Information Technology for Automated Manufacturing Enterprises: Recent Developments and Current Research Issues
|
Shaw, M.J. |
|
1997 |
|
2 |
p. 115-120 |
artikel |
65 |
Introduction to the Technology Strategy and Industrial Applications of Information-Based Manufacturing
|
Michael J. Shaw |
|
2000 |
|
2 |
p. 111-113 3 p. |
artikel |
66 |
Logical Cell Formation in FMS, Using Flexibility-Based Criteria
|
Vivekanand P. Kochikar |
|
1998 |
|
2 |
p. 163-181 19 p. |
artikel |
67 |
Logical Cell Formation in FMS, Using Flexibility-Based Criteria
|
Kochikar, Vivekanand P. |
|
1998 |
|
2 |
p. 163-181 |
artikel |
68 |
Management of product variety in cellular manufacturing systems
|
Akturk, M. Selim |
|
2006 |
|
2 |
p. 93-117 |
artikel |
69 |
Manufacturing Cost Modeling for Product Design
|
Angela Locascio |
|
2000 |
|
2 |
p. 207-217 11 p. |
artikel |
70 |
On the Use of Enterprise Models
|
Larry Whitman |
|
2001 |
|
2 |
p. 195-208 14 p. |
artikel |
71 |
On the Use of Enterprise Models
|
Whitman, Larry |
|
2001 |
|
2 |
p. 195-208 |
artikel |
72 |
Optimal configuration selection for Reconfigurable Manufacturing Systems
|
Youssef, Ayman M. A. |
|
2007 |
|
2 |
p. 67-106 |
artikel |
73 |
Optimization of workcell layouts in mixed-model assembly line environment
|
Klampfl, Erica |
|
2007 |
|
2 |
p. 123 |
artikel |
74 |
Outcomes and Benefit Modeling for Information Systems Investment
|
Dan Remenyi |
|
2001 |
|
2 |
p. 105-129 25 p. |
artikel |
75 |
Outcomes and Benefit Modeling for Information Systems Investment
|
Remenyi, Dan |
|
2001 |
|
2 |
p. 105-129 |
artikel |
76 |
Performance Analysis of Auction-Based Distributed Shop-FloorControl Schemes from the Perspective of the Communication System
|
Dharmaraj Veeramani |
|
1997 |
|
2 |
p. 121-143 23 p. |
artikel |
77 |
Performance Analysis of Auction-Based Distributed Shop-Floor Control Schemes from the Perspective of the Communication System
|
Veeramani, Dharmaraj |
|
1997 |
|
2 |
p. 121-143 |
artikel |
78 |
Process Monitoring Strategies for Surface Mount Manufacturing Processes
|
Siong-Lin Ho |
|
2003 |
|
2 |
p. 95-112 18 p. |
artikel |
79 |
Process Monitoring Strategies for Surface Mount Manufacturing Processes
|
Ho, Siong-Lin |
|
2003 |
|
2 |
p. 95-112 |
artikel |
80 |
Product Hardware Complexity and Its Impact on Inventory and Customer On-Time Delivery
|
Grace Y. Lin |
|
2000 |
|
2 |
p. 145-163 19 p. |
artikel |
81 |
Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems
|
Ananth Krishnamurthy |
|
2004 |
|
2 |
p. 123-150 28 p. |
artikel |
82 |
Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems
|
Krishnamurthy, Ananth |
|
2004 |
|
2 |
p. 123-150 |
artikel |
83 |
Solving group technology problems via clique partitioning
|
Wang, Haibo |
|
2007 |
|
2 |
p. 77-97 |
artikel |
84 |
The Application of Enterprise Modeling for AerospaceManufacturing System Integration
|
Gary P. Moynihan |
|
1997 |
|
2 |
p. 195-210 16 p. |
artikel |
85 |
The Application of Enterprise Modeling for Aerospace Manufacturing System Integration
|
Moynihan, Gary P. |
|
1997 |
|
2 |
p. 195-210 |
artikel |
86 |
The Applications of Flexible Manufacturing Technologies in Business Process Reengineering
|
Felix T. S. Chan |
|
2001 |
|
2 |
p. 131-144 14 p. |
artikel |
87 |
The Applications of Flexible Manufacturing Technologies in Business Process Reengineering
|
Chan, Felix T. S. |
|
2001 |
|
2 |
p. 131-144 |
artikel |
88 |
The Information Technology Productivity Paradox Revisited: ATheoretical and Empirical Investigation in the Manufacturing Sector
|
Anitesh Barua |
|
1997 |
|
2 |
p. 145-166 22 p. |
artikel |
89 |
The Information Technology Productivity Paradox Revisited: A Theoretical and Empirical Investigation in the Manufacturing Sector
|
Barua, Anitesh |
|
1997 |
|
2 |
p. 145-166 |
artikel |
90 |
The Structure of Manufacturing Systems Insights on the Impact of Variability
|
John A. Buzacott |
|
1999 |
|
2 |
p. 127-146 20 p. |
artikel |
91 |
The Structure of Manufacturing Systems: Insights on the Impact of Variability
|
Buzacott, John A. |
|
1999 |
|
2 |
p. 127-146 |
artikel |
92 |
Virtual manufacturing cells: A taxonomy of past research and identification of future research issues
|
Nomden, Gert |
|
2006 |
|
2 |
p. 71-92 |
artikel |