nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bayesian Approach to the Scheduling of Preventive Maintenance
|
Sathe, Prakash T. |
|
1973 |
5 |
2 |
p. 172-179 |
artikel |
2 |
A Cost-Oriented Approach to Stochastic Line Balancing1
|
Kottas, John F. |
|
1973 |
5 |
2 |
p. 164-171 |
artikel |
3 |
AIIE Research Abstracts
|
Miller, Owen |
|
1973 |
5 |
2 |
p. 186-191 |
artikel |
4 |
An Accelerated Sequential Simplex Search Technique
|
Biles, William E. |
|
1973 |
5 |
2 |
p. 127-134 |
artikel |
5 |
A New Approach to Scheduling Aggregate Production and Work Force
|
Goodman, David A. |
|
1973 |
5 |
2 |
p. 135-141 |
artikel |
6 |
An Integrated Materials Management System: Its Design and Formulation
|
Uskup, Ergin |
|
1973 |
5 |
2 |
p. 142-149 |
artikel |
7 |
An Optimal Procedure for Allocating Manpower with Cyclic Requirements
|
Baker, Kenneth R. |
|
1973 |
5 |
2 |
p. 119-126 |
artikel |
8 |
Development of Standard Data for Stereoscopic Microscope Work
|
Hancock, Walton M. |
|
1973 |
5 |
2 |
p. 113-118 |
artikel |
9 |
Geometric Programming: A Technical State-of-the-Art Survey
|
Phillips, Don T. |
|
1973 |
5 |
2 |
p. 97-112 |
artikel |
10 |
Letters
|
Ignizio, James P. |
|
1973 |
5 |
2 |
p. 192 |
artikel |
11 |
New Insights into the Life Cycle Approach
|
Eisenhut, Peter S. |
|
1973 |
5 |
2 |
p. 150-155 |
artikel |
12 |
Simultaneous Optimization of Preventive Maintenance and Replacement Policy for Machines: A Modern Control Theory Approach1
|
Sethi, Suresh P. |
|
1973 |
5 |
2 |
p. 156-163 |
artikel |
13 |
Tighter Bounds for Stochastic Transportation Models
|
Wilson, Dan |
|
1973 |
5 |
2 |
p. 180-185 |
artikel |