nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An optimal procedure for solving the hierarchical network design problem
|
Obreque, Carlos |
|
2007 |
39 |
5 |
p. 513-524 |
artikel |
2 |
A note on performance guarantees for sequencing three-stage flexible flowshops with identical machines to minimize makespan
|
Koulamas, Christos |
|
2007 |
39 |
5 |
p. 559-563 |
artikel |
3 |
A single-product network design model with lead time and safety stock considerations
|
Sourirajan, Karthik |
|
2007 |
39 |
5 |
p. 411-424 |
artikel |
4 |
Decentralized inventory control in a two-stage capacitated supply chain
|
JemaI, Zied |
|
2007 |
39 |
5 |
p. 501-512 |
artikel |
5 |
Global sourcing using local content tariff rules
|
Li, Yanzhi |
|
2007 |
39 |
5 |
p. 425-437 |
artikel |
6 |
Inventory and lead time planning with lead-time-sensitive demand
|
Yang, Bibo |
|
2007 |
39 |
5 |
p. 439-452 |
artikel |
7 |
Probabilistic asymptotic analysis of stochastic online scheduling problems
|
Chen, Gang |
|
2007 |
39 |
5 |
p. 525-538 |
artikel |
8 |
Projects with sequential iteration: Models and complexity
|
Banerjee, Arunava |
|
2007 |
39 |
5 |
p. 453-463 |
artikel |
9 |
Quantity discounts in single-period supply contracts with asymmetric demand information
|
Burnetas, Apostolos |
|
2007 |
39 |
5 |
p. 465-479 |
artikel |
10 |
The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times
|
Shabtay, Dvir |
|
2007 |
39 |
5 |
p. 539-557 |
artikel |
11 |
Value of a put option to the risk-averse newsvendor
|
Chen, Frank |
|
2007 |
39 |
5 |
p. 481-500 |
artikel |