nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A (10/7)-approximation algorithm for an optimum cyclic solution in additive travel-time robotic cells
|
Geismar, H. Neil |
|
2007 |
39 |
2 |
p. 217-227 |
artikel |
2 |
A Lagrangean heuristic for integrated production and transportation planning problems in a dynamic, multi-item, two-layer supply chain
|
Eksioğlu, Sandra Duni |
|
2007 |
39 |
2 |
p. 191-201 |
artikel |
3 |
An improved version of the NEH algorithm and its application to large-scale flow-shop scheduling problems
|
Jin, Feng |
|
2007 |
39 |
2 |
p. 229-234 |
artikel |
4 |
Benefits of considering inventory in service parts logistics network design problems with time-based service constraints
|
Candas, Mehmet Ferhat |
|
2007 |
39 |
2 |
p. 159-176 |
artikel |
5 |
Coordinating production and distribution of jobs with bundling operations
|
Li, Chung-Lun |
|
2007 |
39 |
2 |
p. 203-215 |
artikel |
6 |
Hierarchical cross-training in work-in-process-constrained systems
|
Gel, Esma S. |
|
2007 |
39 |
2 |
p. 125-143 |
artikel |
7 |
Rebate, returns and price protection policies in channel coordination
|
Lu, Xiangwen |
|
2007 |
39 |
2 |
p. 111-124 |
artikel |
8 |
Risk, risk aversion and the optimal time to produce
|
Li, Qing |
|
2007 |
39 |
2 |
p. 145-158 |
artikel |
9 |
Strategic network design for multi-zone truckload shipments
|
Uster, Halit |
|
2007 |
39 |
2 |
p. 177-189 |
artikel |