nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An improved algorithm for solving a multi-period facility location problem
|
Balakrishnan, Jaydeep |
|
2004 |
36 |
1 |
p. 19-22 |
artikel |
2 |
An industrial extension of the discrete lot-sizing and scheduling problem
|
Jans, Raf |
|
2004 |
36 |
1 |
p. 47-58 |
artikel |
3 |
Batching in a two-stage flowshop with dedicated machines in the second stage
|
Cheng, T. C. E. |
|
2004 |
36 |
1 |
p. 87-93 |
artikel |
4 |
Exact algorithms for the job sequencing and tool switching problem
|
Laporte, Gilbert |
|
2004 |
36 |
1 |
p. 37-45 |
artikel |
5 |
Managing two-stage serial inventory systems under demand and supply uncertainty and customer service level requirements
|
Bollapragada, Ramesh |
|
2004 |
36 |
1 |
p. 73-85 |
artikel |
6 |
Multi-product inventory planning with downward substitution, stochastic demand and setup costs
|
Rao, Uday S. |
|
2004 |
36 |
1 |
p. 59-71 |
artikel |
7 |
Optimal capacity expansion for multi-product, multi-machine manufacturing systems with stochastic demand
|
Zhang, Feng |
|
2004 |
36 |
1 |
p. 23-36 |
artikel |
8 |
Parallel machine scheduling to minimize the sum of quadratic completion times
|
Cheng, T. C. Edwin |
|
2004 |
36 |
1 |
p. 11-17 |
artikel |
9 |
Some results on resource constrained scheduling
|
Zhang, Guochuan |
|
2004 |
36 |
1 |
p. 1-9 |
artikel |