Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             18 results found
no title author magazine year volume issue page(s) type
1 A decomposition method for multi-product kanban systems with setup times and lost sales Krieg, Georg N.
2002
34 7 p. 613-625
article
2 A decomposition method for multiproduct kanban systems with setup times and lost sales Georg N. Krieg
2002
34 7 p. 613-625
13 p.
article
3 A decomposition method for multi-product kanban systems with setup times and lost sales Krieg, Georg N.
2002
34 7 p. 613-625
article
4 A review of: “Manufacturing Processes and Equipment” J. TLUSTY Prentice Hall, Upper Saddle River, NJ ISBN 0-201-49865-0 Raman, Shivakumar
2002
34 7 p. 647-648
article
5 Base stock versus WIP cap in single-stage make-to-stock production-inventory systems Liberopoulos, George
2002
34 7 p. 627-636
article
6 Base stock versus WIP cap in singlestage maketostock productioninventory systems George Liberopoulos
2002
34 7 p. 627-636
10 p.
article
7 Base stock versus WIP cap in single-stage make-to-stock production–inventory systems Liberopoulos, George
2002
34 7 p. 627-636
article
8 Book Review: Manufacturing Processes and Equipment J. Tlusty
2002
34 7 p. 647-648
2 p.
article
9 Book Review: Manufacturing Processes and Equipment Tlusty, J.
2002
34 7 p. 647-648
article
10 Design of product specifications and control policies in a single-stage production system Kouikoglou, Vassilis S.
2002
34 7 p. 591-600
article
11 Design of product specifications and control policies in a singlestage production system Vassilis S. Kouikoglou
2002
34 7 p. 591-600
10 p.
article
12 Design of product specifications and control policies in a single-stage production system Kouikoglou, Vassilis S.
2002
34 7 p. 591-600
article
13 Intelligent agent modeling of an industrial warehousing problem Kim, Byung-In
2002
34 7 p. 601-612
article
14 Intelligent agent modeling of an industrial warehousing problem ByungIn Kim
2002
34 7 p. 601-612
12 p.
article
15 Intelligent agent modeling of an industrial warehousing problem Kim, Byung-In
2002
34 7 p. 601-612
article
16 Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control Yang, Taho
2002
34 7 p. 637-646
article
17 Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control Taho Yang
2002
34 7 p. 637-646
10 p.
article
18 Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control Yang, Taho
2002
34 7 p. 637-646
article
                             18 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands