nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times
|
Laguna, Manuel |
|
1999 |
31 |
2 |
p. 125-134 |
artikel |
2 |
A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times
|
MANUEL LAGUNA |
|
1999 |
31 |
2 |
p. 125-134 10 p. |
artikel |
3 |
A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times
|
Laguna, MANUEL |
|
1999 |
31 |
2 |
p. 125-134 |
artikel |
4 |
A review of: “Practical Handbook of Warehousing, 4th edn”Kenneth B. Ackerman Chapman and Hall, 1997, 559 pages
|
Bozer, Yavuz A. |
|
1999 |
31 |
2 |
p. 189-190 |
artikel |
5 |
A review of: “The Planning and Scheduling of Production Systems” Edited by A. Arbita and S.E. Elmaghraby Chapman and Hall, 1997, 367 pages, ISBN 0-412-61020-5
|
Uzsoy, R. |
|
1999 |
31 |
2 |
p. 190-193 |
artikel |
6 |
Book Reviews
|
|
|
1999 |
31 |
2 |
p. 189-193 5 p. |
artikel |
7 |
Book Reviews
|
|
|
1999 |
31 |
2 |
p. 189-193 |
artikel |
8 |
CONWIP-based production lines with multiple bottlenecks: performance and design implications
|
Dar-El, E.M. |
|
1999 |
31 |
2 |
p. 99-111 |
artikel |
9 |
CONWIP-based production lines with multiple bottlenecks: performance and design implications
|
E.M. DAR-EL |
|
1999 |
31 |
2 |
p. 99-111 13 p. |
artikel |
10 |
CONWIP-based production lines with multiple bottlenecks: performance and design implications
|
Dar-el, E.M. |
|
1999 |
31 |
2 |
p. 99-111 |
artikel |
11 |
Due-date determination with resequencing
|
Li, Chung-Lun |
|
1999 |
31 |
2 |
p. 183-188 |
artikel |
12 |
Due-date determination with resequencing
|
CHUNG-LUN LI |
|
1999 |
31 |
2 |
p. 183-188 6 p. |
artikel |
13 |
Due-date determination with resequencing
|
Li, Chung-Lun |
|
1999 |
31 |
2 |
p. 183-188 |
artikel |
14 |
Optimal parallel funding of research and development projects
|
Gerchak, Yigal |
|
1999 |
31 |
2 |
p. 145-152 |
artikel |
15 |
Optimal parallel funding of research and development projects
|
YIGAL GERCHAK |
|
1999 |
31 |
2 |
p. 145-152 8 p. |
artikel |
16 |
Optimal parallel funding of research and development projects
|
Gerchak, YIGAL |
|
1999 |
31 |
2 |
p. 145-152 |
artikel |
17 |
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
|
Azizoglu, Meral |
|
1999 |
31 |
2 |
p. 153-159 |
artikel |
18 |
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
|
MERAL AZIZOGLU |
|
1999 |
31 |
2 |
p. 153-159 7 p. |
artikel |
19 |
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
|
Azizoglu, MERAL |
|
1999 |
31 |
2 |
p. 153-159 |
artikel |
20 |
Scheduling the fabrication and assembly of components in a two-machine flowshop
|
Cheng, T.C. Edwin |
|
1999 |
31 |
2 |
p. 135-143 |
artikel |
21 |
Scheduling the fabrication and assembly of components in a two-machine flowshop
|
T.C. EDWIN CHENG |
|
1999 |
31 |
2 |
p. 135-143 9 p. |
artikel |
22 |
Scheduling the fabrication and assembly of components in a two-machine flowshop
|
Cheng, T.C. EDWIN |
|
1999 |
31 |
2 |
p. 135-143 |
artikel |
23 |
Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
|
Sun, Xiaoqing |
|
1999 |
31 |
2 |
p. 113-124 |
artikel |
24 |
Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
|
XIAOQING SUN |
|
1999 |
31 |
2 |
p. 113-124 12 p. |
artikel |
25 |
Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
|
Sun, XIAOQING |
|
1999 |
31 |
2 |
p. 113-124 |
artikel |
26 |
Strategies for integrating lead time and customer-order decisions
|
Weng, Z. Kevin |
|
1999 |
31 |
2 |
p. 161-171 |
artikel |
27 |
Strategies for integrating lead time and customer-order decisions
|
Z. KEVIN WENG |
|
1999 |
31 |
2 |
p. 161-171 11 p. |
artikel |
28 |
Strategies for integrating lead time and customer-order decisions
|
Weng, Z. KEVIN |
|
1999 |
31 |
2 |
p. 161-171 |
artikel |
29 |
The capacitated lot sizing problem with setup carry-over
|
Sox, Charles R. |
|
1999 |
31 |
2 |
p. 173-181 |
artikel |
30 |
The capacitated lot sizing problem with setup carry-over
|
CHARLES R. SOX |
|
1999 |
31 |
2 |
p. 173-181 9 p. |
artikel |
31 |
The capacitated lot sizing problem with setup carry-over
|
Sox, CHARLES R. |
|
1999 |
31 |
2 |
p. 173-181 |
artikel |