nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Branch-and-Bound Algorithm for Flow Shop Scheduling Problems
|
Ashour, Said |
|
1970 |
2 |
2 |
p. 172-176 |
artikel |
2 |
A Comparison of Inspector Performance Measures
|
Wallack, Paul M. |
|
1970 |
2 |
2 |
p. 97-105 |
artikel |
3 |
A Decision-Making Model for Applications of Queueing Theory
|
Nelson, Rosser t. |
|
1970 |
2 |
2 |
p. 112-117 |
artikel |
4 |
AIIE Research Abstracts
|
Goldman, Jay |
|
1970 |
2 |
2 |
p. 177-184 |
artikel |
5 |
A Network Flow Solution to a Rectilinear Distance Facility Location Problem
|
Cabot, A. Victor |
|
1970 |
2 |
2 |
p. 132-141 |
artikel |
6 |
An Incremental Production Function for the End-Item Repair Process
|
Rose, Marshall |
|
1970 |
2 |
2 |
p. 166-171 |
artikel |
7 |
A Two-Phase Algorithm for the Maintenance of a Deteriorating Component System
|
Brown, D. B. |
|
1970 |
2 |
2 |
p. 106-111 |
artikel |
8 |
On the Optimum Production Quantity when Rejects Obey the Binomial
|
Fisher, Armen G. |
|
1970 |
2 |
2 |
p. 163-165 |
artikel |
9 |
Some Decision Rules for Establishing an Optimal Process Mean
|
Thompson, William W. |
|
1970 |
2 |
2 |
p. 118-121 |
artikel |
10 |
Special Properties of the Self-Lewis Algorithm for Solving a Production-Inventory Problem
|
Baker, Kenneth R. |
|
1970 |
2 |
2 |
p. 122-125 |
artikel |
11 |
The Economic Lot Sizes in Multistage Production Systems
|
Taha, Hamdy A. |
|
1970 |
2 |
2 |
p. 157-162 |
artikel |
12 |
The Effect of Interruption on Standard Time
|
Conrad, Robert B. |
|
1970 |
2 |
2 |
p. 150-156 |
artikel |
13 |
The Maximum Functional Reach for the Female Operator
|
Faulkner, Terrence w. |
|
1970 |
2 |
2 |
p. 126-131 |
artikel |
14 |
Tool-Replacement Policies: Variations in Cost, Tool Quality, and Monitoring Rules
|
Ebert, R. J. |
|
1970 |
2 |
2 |
p. 142-149 |
artikel |