nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bayesian method for robust tolerance control and parameter design
|
Rajagopal, Ramkumar |
|
2006 |
|
8 |
p. 685-697 |
artikel |
2 |
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
|
Rios-Mercado, Roger Z. |
|
1999 |
|
8 |
p. 721-731 |
artikel |
3 |
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
|
ROGER Z. RÍOS-MERCADO |
|
1999 |
|
8 |
p. 721-731 11 p. |
artikel |
4 |
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
|
RÍOS-MERCADO, ROGER Z. |
|
1999 |
|
8 |
p. 721-731 |
artikel |
5 |
A computerized approach to the New York City school bus routing problem
|
Braca, Jeffrey |
|
1997 |
|
8 |
p. 693-702 |
artikel |
6 |
A computerized approach to the New York Cityschool bus routing problem
|
JEFFREY BRACA |
|
1997 |
|
8 |
p. 693-702 10 p. |
artikel |
7 |
A computerized approach to the New York Cityschool bus routing problem
|
BRACA , JEFFREY |
|
1997 |
|
8 |
p. 693-702 |
artikel |
8 |
A continuous review inventory model with a time discount
|
Cheung, Ki Ling |
|
1998 |
|
8 |
p. 747-757 |
artikel |
9 |
A continuous review inventory model with a time discount
|
KI LING CHEUNG |
|
1998 |
|
8 |
p. 747-757 11 p. |
artikel |
10 |
A continuous review inventory model with a time discount
|
Cheung, Ki Ling |
|
1998 |
|
8 |
p. 747-757 |
artikel |
11 |
A data mining approach to process optimization without an explicit quality function
|
Chong, Il-Gyo |
|
2007 |
|
8 |
p. 795-804 |
artikel |
12 |
A heuristic algorithm for the two-hoist cyclic scheduling problem with overlapping hoist coverage ranges
|
Zhou, Zhili |
|
2008 |
|
8 |
p. 782-794 |
artikel |
13 |
A literature survey on planning and control of warehousing systems
|
BERG, JEROEN P. van den |
|
1999 |
|
8 |
p. 751-762 |
artikel |
14 |
A literature survey on planning and control of warehousing systems
|
JEROEN P. van den BERG |
|
1999 |
|
8 |
p. 751-762 12 p. |
artikel |
15 |
A literature survey on planning and control of warehousing systems
|
Van den Berg, JEROEN P. |
|
1999 |
|
8 |
p. 751-762 |
artikel |
16 |
An adaptable problem-space-based search method for flexible flow line scheduling
|
Kurz, Mary E. |
|
2001 |
|
8 |
p. 691-693 |
artikel |
17 |
An Adaptable Problem-space-based Search Method for Flexible Flow Line Scheduling
|
Mary E. Kurz |
|
2001 |
|
8 |
p. 691-693 3 p. |
artikel |
18 |
An Adaptable Problem-space-based Search Method for Flexible Flow Line Scheduling
|
Kurz, Mary E. |
|
2001 |
|
8 |
p. 691-693 |
artikel |
19 |
Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty
|
Gullu, Refik |
|
1997 |
|
8 |
p. 703-709 |
artikel |
20 |
Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty
|
REFIK GU¨LLU¨ |
|
1997 |
|
8 |
p. 703-709 7 p. |
artikel |
21 |
Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty
|
GUÜLLUÜ , REFIİK |
|
1997 |
|
8 |
p. 703-709 |
artikel |
22 |
Analysis of the (s, S) policy for perishables with a random shelf life
|
Gurler, Ulku |
|
2008 |
|
8 |
p. 759-781 |
artikel |
23 |
An analytical comparison of long and short term contracts
|
Cohen, Morris A. |
|
1999 |
|
8 |
p. 783-796 |
artikel |
24 |
An analytical comparison of long and short term contracts
|
MORRIS A. COHEN |
|
1999 |
|
8 |
p. 783-796 14 p. |
artikel |
25 |
An analytical comparison of long and short term contracts
|
Cohen, MORRIS A. |
|
1999 |
|
8 |
p. 783-796 |
artikel |
26 |
An Economic Lot Size Model for Perishable Products with Age-Dependent Inventory and Backorder Costs
|
Hsu, Vernon Ning |
|
2003 |
|
8 |
p. 775-780 |
artikel |
27 |
An efficient algorithm for the single machine total tardiness problem
|
Tansel, Barbaros C. |
|
2001 |
|
8 |
p. 661-674 |
artikel |
28 |
An Efficient Algorithm for the Single Machine Total Tardiness Problem
|
Barbaros Ç. Tansel |
|
2001 |
|
8 |
p. 661-674 14 p. |
artikel |
29 |
An Efficient Algorithm for the Single Machine Total Tardiness Problem
|
Tansel, Barbaros Ç. |
|
2001 |
|
8 |
p. 661-674 |
artikel |
30 |
An efficient method for reliability evaluation of multistate networks given all minimal path vectors
|
Zuo, Ming J. |
|
2007 |
|
8 |
p. 811-817 |
artikel |
31 |
An inventory system with periodic regular review and flexible emergency review
|
Teunter, Ruud |
|
2001 |
|
8 |
p. 625-635 |
artikel |
32 |
An Inventory System with Periodic Regular Review and Flexible Emergency Review
|
Ruud Teunter |
|
2001 |
|
8 |
p. 625-635 11 p. |
artikel |
33 |
An Inventory System with Periodic Regular Review and Flexible Emergency Review
|
Teunter, Ruud |
|
2001 |
|
8 |
p. 625-635 |
artikel |
34 |
Application of a weighted sum of order p to distance estimation
|
Uster, Halit |
|
2001 |
|
8 |
p. 675-684 |
artikel |
35 |
Application of a Weighted Sum of Order p to Distance Estimation
|
Halit Üster |
|
2001 |
|
8 |
p. 675-684 10 p. |
artikel |
36 |
Application of a Weighted Sum of Order p to Distance Estimation
|
Üster, Halit |
|
2001 |
|
8 |
p. 675-684 |
artikel |
37 |
Approximations for multiproduct contracts with stochastic demands and business volume discounts: single supplier case
|
Anupindi, Ravi |
|
1998 |
|
8 |
p. 723-734 |
artikel |
38 |
Approximations for multiproduct contracts with stochastic demands and business volume discounts: single supplier case
|
RAVI ANUPINDI |
|
1998 |
|
8 |
p. 723-734 12 p. |
artikel |
39 |
Approximations for multiproduct contracts with stochastic demands and business volume discounts: single supplier case
|
Anupindi, Ravi |
|
1998 |
|
8 |
p. 723-734 |
artikel |
40 |
A review of: “Decomposition Methods for Complex Factory Scheduling Problems” Irfan M. Ovacik and Reha Uzsoy KJuwer, ISBN 0-7923-9835-1
|
Pinedo, Mihcael |
|
1999 |
|
8 |
p. 797-798 |
artikel |
41 |
A review of: “Deterministic scheduling theory” R. Gary Parker Chapman and Hall, London 1995, Hardback, 290 pages, ISBN (HB) 0-412-99681-2
|
Uzsoy, Rcha |
|
2000 |
|
8 |
p. 767-768 |
artikel |
42 |
A review of: “Global Operations and Logistics: Texts and Cases” Philippe-Pierre Dornier, Ricardo Ernst, Michel Fender and Panos Kouvelis
|
cohen, Morris A. |
|
1999 |
|
8 |
p. 801-802 |
artikel |
43 |
A Review of: “Introduction to Bayesian Statistics”
|
Xiang, Liming |
|
2007 |
|
8 |
p. 829 |
artikel |
44 |
A review of: “Logistics Engineering and Management, 5th edn” Benjamin S. Blanchard Prentice Hall, 1998, 526 pages, ISBN 0-13-905316-6
|
Wu, S. David |
|
1999 |
|
8 |
p. 798-801 |
artikel |
45 |
A review of: “Operations scheduling with applications in manufacturing and services”M. Pinedo and X. Chao McGraw-Hill, New York 1999, 310 pages, ISBN 0-07-289779-1
|
Uzsoy, Reha |
|
2000 |
|
8 |
p. 768-770 |
artikel |
46 |
A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line
|
McMULLEN, PATRICK R. |
|
2000 |
|
8 |
p. 679-686 |
artikel |
47 |
A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line
|
Patrick R. McMullen |
|
2000 |
|
8 |
p. 679-686 8 p. |
artikel |
48 |
A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line
|
McMullen, Patrick R. |
|
2000 |
|
8 |
p. 679-686 |
artikel |
49 |
A statistical approach to tolerance evaluation for circles and cylinders
|
Traband, Mark T. |
|
2004 |
|
8 |
p. 777-785 |
artikel |
50 |
A throughput model for carousel/VLM pods
|
Meller, Russell D. |
|
2004 |
|
8 |
p. 725-741 |
artikel |
51 |
Batch size modeling in a multi-item, discrete manufacturing system via an open queuing network
|
Meng, Gang |
|
2004 |
|
8 |
p. 743-753 |
artikel |
52 |
Book reviews
|
|
|
2000 |
|
8 |
p. 767-770 4 p. |
artikel |
53 |
Book reviews
|
|
|
2000 |
|
8 |
p. 767-770 |
artikel |
54 |
Centralized and decentralized train scheduling for intermodal operations
|
Newman, Alexandra M. |
|
2000 |
|
8 |
p. 743-754 |
artikel |
55 |
Centralized and decentralized train scheduling for intermodal operations
|
Alexandra M. Newman |
|
2000 |
|
8 |
p. 743-754 12 p. |
artikel |
56 |
Centralized and decentralized train scheduling for intermodal operations
|
Newman, Alexandra M. |
|
2000 |
|
8 |
p. 743-754 |
artikel |
57 |
Component commonality in multiple-period, assemble-to-order systems
|
Hillier, Mark S. |
|
2000 |
|
8 |
p. 755-766 |
artikel |
58 |
Component commonality in multiple-period, assemble-to-order systems
|
Mark S. Hillier |
|
2000 |
|
8 |
p. 755-766 12 p. |
artikel |
59 |
Component commonality in multiple-period, assemble-to-order systems
|
Hillier, Mark S. |
|
2000 |
|
8 |
p. 755-766 |
artikel |
60 |
Configuring a manufacturing firm's supply network with multiple suppliers
|
Kim, Bowon |
|
2002 |
|
8 |
p. 663-677 |
artikel |
61 |
Configuring a manufacturing firm's supply network with multiple suppliers
|
Bowon Kim |
|
2002 |
|
8 |
p. 663-677 15 p. |
artikel |
62 |
Configuring a manufacturing firm's supply network with multiple suppliers
|
Kim, Bowon |
|
2002 |
|
8 |
p. 663-677 |
artikel |
63 |
Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
|
Golany, B. |
|
1999 |
|
8 |
p. 771-781 |
artikel |
64 |
Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
|
B. GOLANY |
|
1999 |
|
8 |
p. 771-781 11 p. |
artikel |
65 |
Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
|
Golany, B. |
|
1999 |
|
8 |
p. 771-781 |
artikel |
66 |
Control of a Batch Processing Machine Serving Compatible Job Families
|
Neale, John J. |
|
2003 |
|
8 |
p. 699-710 |
artikel |
67 |
Coordinating orders in supply chains through price discounts
|
Klastorin, T.D. |
|
2002 |
|
8 |
p. 679-689 |
artikel |
68 |
Coordinating orders in supply chains through price discounts
|
T.D. Klastorin |
|
2002 |
|
8 |
p. 679-689 11 p. |
artikel |
69 |
Coordinating orders in supply chains through price discounts
|
Klastorin, T.D. |
|
2002 |
|
8 |
p. 679-689 |
artikel |
70 |
Coordination of joint pricing-production decisions in a supply chain
|
Zha, Wen |
|
2002 |
|
8 |
p. 701-715 |
artikel |
71 |
Coordination of joint pricingproduction decisions in a supply chain
|
Wen Zhao |
|
2002 |
|
8 |
p. 701-715 15 p. |
artikel |
72 |
Coordination of joint pricing-production decisions in a supply chain
|
Zhao, Wen |
|
2002 |
|
8 |
p. 701-715 |
artikel |
73 |
Cyclic scheduling in synchronous production lines
|
Kouvelis, Panos |
|
1999 |
|
8 |
p. 709-719 |
artikel |
74 |
Cyclic scheduling in synchronous production lines
|
PANOS KOUVELIS |
|
1999 |
|
8 |
p. 709-719 11 p. |
artikel |
75 |
Cyclic scheduling in synchronous production lines
|
Kouvelis, PANOS |
|
1999 |
|
8 |
p. 709-719 |
artikel |
76 |
Detecting improvement using Shewhart attribute control charts when the lower control limit is zero
|
Lucas, James M. |
|
2006 |
|
8 |
p. 699-709 |
artikel |
77 |
Detecting multiple special causes from multivariate data with applications to fault detection in manufacturing
|
Zantek, Paul |
|
2007 |
|
8 |
p. 771-782 |
artikel |
78 |
Dry kiln scheduling in furniture production
|
Yaghubian, Arman R. |
|
1999 |
|
8 |
p. 733-738 |
artikel |
79 |
Dry kiln scheduling in furniture production
|
ARMAN R. YAGHUBIAN |
|
1999 |
|
8 |
p. 733-738 6 p. |
artikel |
80 |
Dry kiln scheduling in furniture production
|
Yaghubian, ARMAN R. |
|
1999 |
|
8 |
p. 733-738 |
artikel |
81 |
Dynamic procurement in a capacitated supply chain facing uncertain demand
|
Erhun, Feryal |
|
2008 |
|
8 |
p. 733-748 |
artikel |
82 |
Economic development of specifications for 100% inspection based on asymmetric quality loss functions
|
Feng, Qianmei |
|
2006 |
|
8 |
p. 659-669 |
artikel |
83 |
Erratum
|
Sourirajan, Karthik |
|
2008 |
|
8 |
p. 795-797 |
artikel |
84 |
Erratum: Correcting a proof in “Economic lot-sizing with remanufacturing options”
|
Golany, Boaz |
|
2005 |
|
8 |
p. 787 |
artikel |
85 |
Experimental investigation of shared storage assignment policies in automated storage/retrieval systems
|
Kulturel, Sadan |
|
1999 |
|
8 |
p. 739-749 |
artikel |
86 |
Experimental investigation of shared storage assignment policies in automated storage/retrieval systems
|
SADAN KULTUREL |
|
1999 |
|
8 |
p. 739-749 11 p. |
artikel |
87 |
Experimental investigation of shared storage assignment policies in automated storage/retrieval systems
|
Kulturel, SADAN |
|
1999 |
|
8 |
p. 739-749 |
artikel |
88 |
Flowshops with processing flexibility across production stages
|
Kouvelis, Panagiotis |
|
1998 |
|
8 |
p. 735-746 |
artikel |
89 |
Flowshops with processing flexibility across production stages
|
PANAGIOTIS KOUVELIS |
|
1998 |
|
8 |
p. 735-746 12 p. |
artikel |
90 |
Flowshops with processing flexibility across production stages
|
Kouvelis, Panagiotis |
|
1998 |
|
8 |
p. 735-746 |
artikel |
91 |
Heuristics for minimizing tool switches when scheduling part types on a flexible machine
|
Hertz, Alain |
|
1998 |
|
8 |
p. 689-694 |
artikel |
92 |
Heuristics for minimizing tool switches when scheduling part types on a flexible machine
|
ALAIN HERTZ |
|
1998 |
|
8 |
p. 689-694 6 p. |
artikel |
93 |
Heuristics for minimizing tool switches when scheduling part types on a flexible machine
|
Hertz, Alain |
|
1998 |
|
8 |
p. 689-694 |
artikel |
94 |
IIE Transactions Special Issue on Planning and Coordination of Supply Chains with Outsourcing
|
|
|
2002 |
|
8 |
p. 4-6 3 p. |
artikel |
95 |
IIE Transactions Special Issue on Planning and Coordination of Supply Chains with Outsourcing
|
|
|
2002 |
|
8 |
p. 4-6 |
artikel |
96 |
Incentive maintenance outsourcing contracts for channel coordination and improvement
|
Tarakci, Hakan |
|
2006 |
|
8 |
p. 671-684 |
artikel |
97 |
Integrated Production Planning and Scheduling on Automobile Assembly Lines
|
Yan, Hong-Sen |
|
2003 |
|
8 |
p. 711-725 |
artikel |
98 |
Integrated warehouse location and inventory decisions in a three-tier distribution system
|
USter, Halit |
|
2008 |
|
8 |
p. 718-732 |
artikel |
99 |
Integrating advance order information in make-to-stock production systems
|
Karaesmen, Fikri |
|
2002 |
|
8 |
p. 649-662 |
artikel |
100 |
Integrating advance order information in maketostock production systems
|
Fikri Karaesmen |
|
2002 |
|
8 |
p. 649-662 14 p. |
artikel |
101 |
Integrating advance order information in make-to-stock production systems
|
Karaesmen, Fikri |
|
2002 |
|
8 |
p. 649-662 |
artikel |
102 |
Location of facilities on a network with groups of demand points
|
Berman, Oded |
|
2001 |
|
8 |
p. 637-648 |
artikel |
103 |
Location of Facilities on a Network with Groups of Demand Points
|
Oded Berman |
|
2001 |
|
8 |
p. 637-648 12 p. |
artikel |
104 |
Location of Facilities on a Network with Groups of Demand Points
|
Berman, Oded |
|
2001 |
|
8 |
p. 637-648 |
artikel |
105 |
Lot Splitting Under Learning Effects with Minimal Revenue Requirements and Multiple Lot Types
|
Serin, Yasemin |
|
2003 |
|
8 |
p. 689-698 |
artikel |
106 |
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
|
Sriskandarajah, C. |
|
1999 |
|
8 |
p. 695-707 |
artikel |
107 |
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
|
C. SRISKANDARAJAH |
|
1999 |
|
8 |
p. 695-707 13 p. |
artikel |
108 |
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
|
Sriskandarajah, C. |
|
1999 |
|
8 |
p. 695-707 |
artikel |
109 |
Make-to-order versus make-to-stock in a production—inventory system with general production times
|
Arreola-Risa, Antonio |
|
1998 |
|
8 |
p. 705-713 |
artikel |
110 |
Make-to-order versus make-to-stock in a productioninventory system with general production times
|
ANTONIO ARREOLA-RISA |
|
1998 |
|
8 |
p. 705-713 9 p. |
artikel |
111 |
Make-to-order versus make-to-stock in a production–inventory system with general production times
|
Arreola-risa, Antonio |
|
1998 |
|
8 |
p. 705-713 |
artikel |
112 |
Managing Demand to Optimize Production Costs
|
Ravi, Peruvemba S. |
|
2003 |
|
8 |
p. 749-762 |
artikel |
113 |
Managing simple re-entrant flow lines: theoretical foundation and experimental results
|
Bispo, Carlos F. |
|
2001 |
|
8 |
p. 609-623 |
artikel |
114 |
Managing Simple re-entrant Flow Lines: Theoretical Foundation and Experimental Results
|
Carlos F. Bispo |
|
2001 |
|
8 |
p. 609-623 15 p. |
artikel |
115 |
Managing Simple re-entrant Flow Lines: Theoretical Foundation and Experimental Results
|
Bispo, Carlos F. |
|
2001 |
|
8 |
p. 609-623 |
artikel |
116 |
Multivariate one-sided control charts
|
Testik, Murat Caner |
|
2006 |
|
8 |
p. 635-645 |
artikel |
117 |
On offering economic incentives to backorder
|
DeCROIX, GREGORY A. |
|
1998 |
|
8 |
p. 715-721 |
artikel |
118 |
On offering economic incentives to backorder
|
GREGORY A. DeCROIX |
|
1998 |
|
8 |
p. 715-721 7 p. |
artikel |
119 |
On offering economic incentives to backorder
|
DeCroix, Gregory A. |
|
1998 |
|
8 |
p. 715-721 |
artikel |
120 |
On postponement strategies for product families with multiple points of differentiation
|
Garg, Amit |
|
1997 |
|
8 |
p. 641-650 |
artikel |
121 |
On postponement strategies for product families with multiple points of differentiation
|
AMIT GARG |
|
1997 |
|
8 |
p. 641-650 10 p. |
artikel |
122 |
On postponement strategies for product families with multiple points of differentiation
|
GARG , AMIT |
|
1997 |
|
8 |
p. 641-650 |
artikel |
123 |
On scheduling project activities with variable expenditure rates
|
Ozdamar, Linet |
|
1998 |
|
8 |
p. 695-704 |
artikel |
124 |
On scheduling project activities with variable expenditure rates
|
LINET ÖZDAMAR |
|
1998 |
|
8 |
p. 695-704 10 p. |
artikel |
125 |
On scheduling project activities with variable expenditure rates
|
Özdamar, Linet |
|
1998 |
|
8 |
p. 695-704 |
artikel |
126 |
Optimal Inventory Policy for Systems with Demand Cancellations
|
Yuan, Xue-Ming |
|
2003 |
|
8 |
p. 739-747 |
artikel |
127 |
Optimally Locating Multiple Dwell Points in a Single Loop Guide Path System
|
Ventura, Jose A. |
|
2003 |
|
8 |
p. 727-737 |
artikel |
128 |
Optimal production operations sequencing
|
Schraner, Erika |
|
1997 |
|
8 |
p. 651-660 |
artikel |
129 |
Optimal production operations sequencing
|
ERIKA SCHRANER |
|
1997 |
|
8 |
p. 651-660 10 p. |
artikel |
130 |
Optimal production operations sequencing
|
SCHRANER , ERIKA |
|
1997 |
|
8 |
p. 651-660 |
artikel |
131 |
Optimal reliability, warranty and price for new products
|
Huang, Hong-Zhong |
|
2007 |
|
8 |
p. 819-827 |
artikel |
132 |
Performance analysis of production systems with rework loops
|
Li, Jingshan |
|
2004 |
|
8 |
p. 755-765 |
artikel |
133 |
Performance and reliability of a star topology grid service with data dependency and two types of failure
|
Levitin, Gregory |
|
2007 |
|
8 |
p. 783-794 |
artikel |
134 |
Pricing and ordering strategies in manufacturing and distribution alliances
|
Weng, Z. Kevin |
|
1997 |
|
8 |
p. 681-692 |
artikel |
135 |
Pricing and ordering strategies in manufacturing and distribution alliances
|
Z. KEVIN WENG |
|
1997 |
|
8 |
p. 681-692 12 p. |
artikel |
136 |
Pricing and ordering strategies in manufacturing and distribution alliances
|
WENG , Z. KEVIN |
|
1997 |
|
8 |
p. 681-692 |
artikel |
137 |
Quality yield measure for processes with asymmetric tolerances
|
Pearn, W. L. |
|
2006 |
|
8 |
p. 619-633 |
artikel |
138 |
Reactive capacity and inventory competition under demand substitution
|
Li, Qing |
|
2008 |
|
8 |
p. 707-717 |
artikel |
139 |
Review of: “Competing Through Supply Chain Management: Creating Market-Winning Strategies Through Supply Chain Partnerships”David Frederick Ross Chapman & Hall
|
Simchi-Levi, David |
|
1998 |
|
8 |
p. 762-763 |
artikel |
140 |
Review of: “Critical Chain” Eliyahu M. Goldratt The North River Press Publishing Corporation, Great Barrington, MA, 1997. ISBN 0-88427-153-6
|
McKay, Kenneth N. |
|
1998 |
|
8 |
p. 759-762 |
artikel |
141 |
Robustness to variability in project networks
|
Gutierrez, Genaro J. |
|
2001 |
|
8 |
p. 649-660 |
artikel |
142 |
Robustness to Variability in Project Networks
|
Genaro J. Gutierrez |
|
2001 |
|
8 |
p. 649-660 12 p. |
artikel |
143 |
Robustness to Variability in Project Networks
|
Gutierrez, Genaro J. |
|
2001 |
|
8 |
p. 649-660 |
artikel |
144 |
Robust reverse production system design for carpet recycling
|
Realff, Matthew J. |
|
2004 |
|
8 |
p. 767-776 |
artikel |
145 |
Scheduling jobs with release dates and deadlines on a batch processing machine
|
Cheng, T.C. Edwin |
|
2001 |
|
8 |
p. 685-690 |
artikel |
146 |
Scheduling Jobs with Release Dates and Deadlines on a Batch Processing Machine
|
T.C. Edwin Cheng |
|
2001 |
|
8 |
p. 685-690 6 p. |
artikel |
147 |
Scheduling Jobs with Release Dates and Deadlines on a Batch Processing Machine
|
Cheng, T.C. Edwin |
|
2001 |
|
8 |
p. 685-690 |
artikel |
148 |
Scheduling parallel assembly workstations to minimize a shared pool of labor
|
Camm, Jeffrey D. |
|
2008 |
|
8 |
p. 749-758 |
artikel |
149 |
Scheduling with generalized batch delivery dates and earliness penalties
|
Yang, Xiaoguang |
|
2000 |
|
8 |
p. 735-741 |
artikel |
150 |
Scheduling with generalized batch delivery dates and earliness penalties
|
Xiaoguang Yang |
|
2000 |
|
8 |
p. 735-741 7 p. |
artikel |
151 |
Scheduling with generalized batch delivery dates and earliness penalties
|
Yang, Xiaoguang |
|
2000 |
|
8 |
p. 735-741 |
artikel |
152 |
Service parts logistics: a benchmark analysis
|
Cohen, Morris A. |
|
1997 |
|
8 |
p. 627-639 |
artikel |
153 |
Service parts logistics: a benchmark analysis
|
MORRIS A. COHEN |
|
1997 |
|
8 |
p. 627-639 13 p. |
artikel |
154 |
Service parts logistics: a benchmark analysis
|
COHEN , MORRIS A. |
|
1997 |
|
8 |
p. 627-639 |
artikel |
155 |
Simple evaluation of echelon stock (R,Q) policies for two-level inventory systems
|
Axsater, Sven |
|
1997 |
|
8 |
p. 661-669 |
artikel |
156 |
Simple evaluation of echelon stock (R,Q) policies for two-level inventory systems
|
SVEN AXSA¨TER |
|
1997 |
|
8 |
p. 661-669 9 p. |
artikel |
157 |
Simple evaluation of echelon stock (R,Q) policies for two-level inventory systems
|
AXSA¨TER , SVEN |
|
1997 |
|
8 |
p. 661-669 |
artikel |
158 |
Solving an apparel trim placement problem using a maximum cover problem approach
|
Grinde, Roger B. |
|
1999 |
|
8 |
p. 763-769 |
artikel |
159 |
Solving an apparel trim placement problem using a maximum cover problem approach
|
ROGER B. GRINDE |
|
1999 |
|
8 |
p. 763-769 7 p. |
artikel |
160 |
Solving an apparel trim placement problem using a maximum cover problem approach
|
Grinde, ROGER B. |
|
1999 |
|
8 |
p. 763-769 |
artikel |
161 |
Subcontracting with availability guarantees: production control and capacity decisions
|
Tan, Baris |
|
2004 |
|
8 |
p. 711-724 |
artikel |
162 |
Supplier- and buyer-driven channels in a two-stage supply chain
|
Ertek, Gurdal |
|
2002 |
|
8 |
p. 691-700 |
artikel |
163 |
Supplier and buyerdriven channels in a twostage supply chain
|
Gürdal Ertek |
|
2002 |
|
8 |
p. 691-700 10 p. |
artikel |
164 |
Supplier- and buyer-driven channels in a two-stage supply chain
|
Ertek, Gürdal |
|
2002 |
|
8 |
p. 691-700 |
artikel |
165 |
Supply chain capacity and outsourcing decisions: the dynamic interplay of demand and supply uncertainty
|
Kouvelis, Panos |
|
2002 |
|
8 |
p. 717-728 |
artikel |
166 |
Supply chain capacity and outsourcing decisions the dynamic interplay of demand and supply uncertainty
|
Panos Kouvelis |
|
2002 |
|
8 |
p. 717-728 12 p. |
artikel |
167 |
Supply chain capacity and outsourcing decisions: the dynamic interplay of demand and supply uncertainty
|
Kouvelis, Panos |
|
2002 |
|
8 |
p. 717-728 |
artikel |
168 |
Supply management in assembly systems with random yield and random demand
|
Gurnani, Haresh |
|
2000 |
|
8 |
p. 701-714 |
artikel |
169 |
Supply management in assembly systems with random yield and random demand
|
Haresh Gurnani |
|
2000 |
|
8 |
p. 701-714 14 p. |
artikel |
170 |
Supply management in assembly systems with random yield and random demand
|
Gurnani, Haresh |
|
2000 |
|
8 |
p. 701-714 |
artikel |
171 |
Taguchi's approach to robust parameter design: A new perspective
|
Joseph, V. Roshan |
|
2007 |
|
8 |
p. 805-810 |
artikel |
172 |
Techniques to interpret T2 control chart signals
|
Aparisi, Francisco |
|
2006 |
|
8 |
p. 647-657 |
artikel |
173 |
The block layout shortest loop design problem
|
Asef-Vaziri, Ardavan |
|
2000 |
|
8 |
p. 727-734 |
artikel |
174 |
The block layout shortest loop design problem
|
Ardavan Asef-Vaziri |
|
2000 |
|
8 |
p. 727-734 8 p. |
artikel |
175 |
The block layout shortest loop design problem
|
Asef-Vaziri, Ardavan |
|
2000 |
|
8 |
p. 727-734 |
artikel |
176 |
The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate
|
Khouja, Moutaz |
|
2000 |
|
8 |
p. 715-725 |
artikel |
177 |
The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate
|
Moutaz Khouja |
|
2000 |
|
8 |
p. 715-725 11 p. |
artikel |
178 |
The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate
|
Khouja, Moutaz |
|
2000 |
|
8 |
p. 715-725 |
artikel |
179 |
The impact of small lot ordering on traffic congestion in a physical distribution system
|
Moinzadeh, Kamran |
|
1997 |
|
8 |
p. 671-679 |
artikel |
180 |
The impact of small lot ordering on traffic congestion in a physical distribution system
|
KAMRAN MOINZADEH |
|
1997 |
|
8 |
p. 671-679 9 p. |
artikel |
181 |
The impact of small lot ordering on traffic congestion in a physical distribution system
|
MOINZADEH , KAMRAN |
|
1997 |
|
8 |
p. 671-679 |
artikel |
182 |
The use of flowlines to simplify routing complexity in two-stage flowshops
|
Vairaktarakis, George |
|
2000 |
|
8 |
p. 687-699 |
artikel |
183 |
The use of flowlines to simplify routing complexity in two-stage flowshops
|
George Vairaktarakis |
|
2000 |
|
8 |
p. 687-699 13 p. |
artikel |
184 |
The use of flowlines to simplify routing complexity in two-stage flowshops
|
Vairaktarakis, George |
|
2000 |
|
8 |
p. 687-699 |
artikel |
185 |
The Value of Processing Flexibility in Multipurpose Machines
|
Vairaktarakis, George L. |
|
2003 |
|
8 |
p. 763-774 |
artikel |