nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Achieving product variety through optimal choice of module variations
|
Chakravarty, Amiya K. |
|
2001 |
|
7 |
p. 587-598 |
artikel |
2 |
Achieving product variety through optimal choice of module variations
|
Amiya K. Chakravarty |
|
2001 |
|
7 |
p. 587-598 12 p. |
artikel |
3 |
Achieving product variety through optimal choice of module variations
|
Chakravarty, Amiya K. |
|
2001 |
|
7 |
p. 587-598 |
artikel |
4 |
A cyclic policy for the loading of multiple products on a vehicle with different compartment sizes
|
Bukchin, Joseph |
|
2004 |
|
7 |
p. 641-653 |
artikel |
5 |
A decomposition method for multi-product kanban systems with setup times and lost sales
|
Krieg, Georg N. |
|
2002 |
|
7 |
p. 613-625 |
artikel |
6 |
A decomposition method for multiproduct kanban systems with setup times and lost sales
|
Georg N. Krieg |
|
2002 |
|
7 |
p. 613-625 13 p. |
artikel |
7 |
A decomposition method for multi-product kanban systems with setup times and lost sales
|
Krieg, Georg N. |
|
2002 |
|
7 |
p. 613-625 |
artikel |
8 |
A finite-memory algorithm for estimating the variance of the sample mean
|
Song, Wheyming Tina |
|
2007 |
|
7 |
p. 703-711 |
artikel |
9 |
A five-class variance swapping rule for simulation experiments: A correlated-blocks design
|
Song, Wheyming Tina |
|
2007 |
|
7 |
p. 713-722 |
artikel |
10 |
A Hybrid Inventory System with a Time Limit on Backorders
|
Zhang, Guoqiang Peter |
|
2003 |
|
7 |
p. 679-687 |
artikel |
11 |
A knowledge acquisition model for selecting coordinate measuring machines using inductive learning
|
Lin, Zone-Ching |
|
2000 |
|
7 |
p. 573-583 |
artikel |
12 |
A knowledge acquisition model for selecting coordinate measuring machines using inductive learning
|
Zone-Ching Lin |
|
2000 |
|
7 |
p. 573-583 11 p. |
artikel |
13 |
A knowledge acquisition model for selecting coordinate measuring machines using inductive learning
|
Lin, Zone-Ching |
|
2000 |
|
7 |
p. 573-583 |
artikel |
14 |
A logistics scheduling model: scheduling and transshipment for two processing centers
|
Qi, Xiangtong |
|
2006 |
|
7 |
p. 537-546 |
artikel |
15 |
A methodology for designing flexible cellular manufacturing systems
|
Askin, Ronald G. |
|
1997 |
|
7 |
p. 599-610 |
artikel |
16 |
A methodology for designing flexible cellular manufacturing systems
|
RONALD G. ASKIN |
|
1997 |
|
7 |
p. 599-610 12 p. |
artikel |
17 |
A methodology for designing flexible cellular manufacturing systems
|
Askin, Ronald G. |
|
1997 |
|
7 |
p. 599-610 |
artikel |
18 |
A metric for agility measurement in product development
|
Sieger, David B. |
|
2000 |
|
7 |
p. 637-645 |
artikel |
19 |
A metric for agility measurement in product development
|
David B. Sieger |
|
2000 |
|
7 |
p. 637-645 9 p. |
artikel |
20 |
A metric for agility measurement in product development
|
Sieger, David B. |
|
2000 |
|
7 |
p. 637-645 |
artikel |
21 |
An evaluation of worker cross training and flexible workdays in job shops
|
Yang, Kum-Khiong |
|
2007 |
|
7 |
p. 735-746 |
artikel |
22 |
An industry-based study of cutting process capability representation requirements for an integrated simultaneous engineering workstation
|
Naish, Jane C. |
|
1997 |
|
7 |
p. 573-584 |
artikel |
23 |
An industry-based study of cutting process capability representation requirements for an integrated simultaneous engineering workstation
|
JANE C. NAISH |
|
1997 |
|
7 |
p. 573-584 12 p. |
artikel |
24 |
An industry-based study of cutting process capability representation requirements for an integrated simultaneous engineering workstation
|
Naish, Jane C. |
|
1997 |
|
7 |
p. 573-584 |
artikel |
25 |
An integrated process planning system using feature reasoning and space search-based optimization
|
Khoshnevis, Behrokh |
|
1999 |
|
7 |
p. 597-616 |
artikel |
26 |
An integrated process planning system using feature reasoning and space search-based optimization
|
BEHROKH KHOSHNEVIS |
|
1999 |
|
7 |
p. 597-616 20 p. |
artikel |
27 |
An integrated process planning system using feature reasoning and space search-based optimization
|
Khoshnevis, BEHROKH |
|
1999 |
|
7 |
p. 597-616 |
artikel |
28 |
Application of semi-definite programming to the design of multi-response experiments
|
Atashgah, Ali Babapour |
|
2007 |
|
7 |
p. 763-769 |
artikel |
29 |
Approximating Performance Measures for a Network of Unreliable Machines
|
Berman, Oded |
|
2003 |
|
7 |
p. 665-677 |
artikel |
30 |
A reexamination of the distance-based facility layout problem
|
Bozer, Yavuz A. |
|
1997 |
|
7 |
p. 549-560 |
artikel |
31 |
A reexamination of the distance-based facility layout problem
|
YAVUZ A. BOZER |
|
1997 |
|
7 |
p. 549-560 12 p. |
artikel |
32 |
A reexamination of the distance-based facility layout problem
|
Bozer, Yavuz A. |
|
1997 |
|
7 |
p. 549-560 |
artikel |
33 |
A review of: “Manufacturing Processes and Equipment” J. TLUSTY Prentice Hall, Upper Saddle River, NJ ISBN 0-201-49865-0
|
Raman, Shivakumar |
|
2002 |
|
7 |
p. 647-648 |
artikel |
34 |
A Review of:“Material Flow Systems in Manufacturing”J.M.A. Tanchoco (ed.)Chapman & Hall, 1994, 400 pp., $124.95, ISBN 0-412-49180-X
|
Sarker, Bhaba R. |
|
1997 |
|
7 |
p. 623 |
artikel |
35 |
A Review of:“Principles of Process Planning: A Logical Approach”Gideon Halevi and Roland D. Weill Chapman & Hall, 1995, 400 pp., ISBN 0-412-54360-5
|
Dong, Jian |
|
1997 |
|
7 |
p. 624-625 |
artikel |
36 |
A review of: “SPIRAL” SPIRAL was developed by Marc Goetschalckx Industrial and Systems Engineering Department, Georgia Institute of Technology, Atlanta, GA, USA
|
Heragu, Sunderesh S. |
|
2000 |
|
7 |
p. 677 |
artikel |
37 |
A Review of: “Static and Dynamic Neural Networks”
|
Gupta, Madan M. |
|
2005 |
|
7 |
p. 681-682 |
artikel |
38 |
A Review of: “Virtual Reality Technology, 2nd edition”
|
Burdea, Grigore |
|
2005 |
|
7 |
p. 682-683 |
artikel |
39 |
A theoretical framework and efficiency study of multivariate statistical process control charts
|
Jiang, Wei |
|
2008 |
|
7 |
p. 650-663 |
artikel |
40 |
A virtual environment for training overhead crane operators: real-time implementation
|
Wilson, Bruce H. |
|
1998 |
|
7 |
p. 589-595 |
artikel |
41 |
A virtual environment for training overhead crane operators: real-time implementation
|
BRUCE H. WILSON |
|
1998 |
|
7 |
p. 589-595 7 p. |
artikel |
42 |
A virtual environment for training overhead crane operators: real-time implementation
|
Wilson, Bruce H. |
|
1998 |
|
7 |
p. 589-595 |
artikel |
43 |
A worker-based approach for modeling variability in task completion times
|
Doerr, Kenneth H. |
|
2000 |
|
7 |
p. 625-636 |
artikel |
44 |
A worker-based approach for modeling variability in task completion times
|
Kenneth H. Doerr |
|
2000 |
|
7 |
p. 625-636 12 p. |
artikel |
45 |
A worker-based approach for modeling variability in task completion times
|
Doerr, Kenneth H. |
|
2000 |
|
7 |
p. 625-636 |
artikel |
46 |
Base stock versus WIP cap in single-stage make-to-stock production-inventory systems
|
Liberopoulos, George |
|
2002 |
|
7 |
p. 627-636 |
artikel |
47 |
Base stock versus WIP cap in singlestage maketostock productioninventory systems
|
George Liberopoulos |
|
2002 |
|
7 |
p. 627-636 10 p. |
artikel |
48 |
Base stock versus WIP cap in single-stage make-to-stock production–inventory systems
|
Liberopoulos, George |
|
2002 |
|
7 |
p. 627-636 |
artikel |
49 |
Book Review: Manufacturing Processes and Equipment
|
J. Tlusty |
|
2002 |
|
7 |
p. 647-648 2 p. |
artikel |
50 |
Book Review: Manufacturing Processes and Equipment
|
Tlusty, J. |
|
2002 |
|
7 |
p. 647-648 |
artikel |
51 |
Capacitated multicommodity network flow problems with piecewise linear concave costs
|
Muriel, Ana |
|
2004 |
|
7 |
p. 683-696 |
artikel |
52 |
Circuit Card Assembly on Tandem Turret-Type Placement Machines
|
Wilhelm, Wilbert E. |
|
2003 |
|
7 |
p. 627-645 |
artikel |
53 |
Complexity in manufacturing systems, Part 1: Analysis of static complexity
|
Deshmukh, Abhijit V. |
|
1998 |
|
7 |
p. 645-655 |
artikel |
54 |
Complexity in manufacturing systems, Part 1: Analysis of static complexity
|
ABHIJIT V. DESHMUKH |
|
1998 |
|
7 |
p. 645-655 11 p. |
artikel |
55 |
Complexity in manufacturing systems, Part 1: Analysis of static complexity
|
Deshmukh, Abhijit V. |
|
1998 |
|
7 |
p. 645-655 |
artikel |
56 |
Computer-aided optimization of multi—pass turning operations for continuous forms on CNC lathes
|
Su, Chao-Ton |
|
1999 |
|
7 |
p. 583-596 |
artikel |
57 |
Computer-aided optimization of multi-pass turning operations for continuous forms on CNC lathes
|
CHAO-TON SU |
|
1999 |
|
7 |
p. 583-596 14 p. |
artikel |
58 |
Computer-aided optimization of multi-pass turning operations for continuous forms on CNC lathes
|
Su, CHAO-TON |
|
1999 |
|
7 |
p. 583-596 |
artikel |
59 |
Conflict resolution in AGV systems
|
Reveliotis, Spyros A. |
|
2000 |
|
7 |
p. 647-659 |
artikel |
60 |
Conflict resolution in AGV systems
|
Spyros A. Reveliotis |
|
2000 |
|
7 |
p. 647-659 13 p. |
artikel |
61 |
Conflict resolution in AGV systems
|
Reveliotis, Spyros A. |
|
2000 |
|
7 |
p. 647-659 |
artikel |
62 |
Coordination of quantity and shelf-retention timing in the video movie rental industry
|
Gerchak, Yigal |
|
2006 |
|
7 |
p. 525-536 |
artikel |
63 |
Cost and Throughput Modeling of Manual and Automated Order Fulfillment Systems
|
Russell, Mardi L. |
|
2003 |
|
7 |
p. 589-603 |
artikel |
64 |
Cost minimization and workload balancing in printed circuit board assembly
|
Hillier, Mark S. |
|
2001 |
|
7 |
p. 547-557 |
artikel |
65 |
Cost minimization and workload balancing in printed circuit board assembly
|
Mark S. Hillier |
|
2001 |
|
7 |
p. 547-557 11 p. |
artikel |
66 |
Cost minimization and workload balancing in printed circuit board assembly
|
Hillier, Mark S. |
|
2001 |
|
7 |
p. 547-557 |
artikel |
67 |
Cutter-path generation using multiple cutting-tool sizes for 2-1/2D pocket machining
|
Veeramani, Dharmaraj |
|
2000 |
|
7 |
p. 661-675 |
artikel |
68 |
Cutter-path generation using multiple cutting-tool sizes for 2-1/2D pocket machining
|
Dharmaraj Veeramani |
|
2000 |
|
7 |
p. 661-675 15 p. |
artikel |
69 |
Cutter-path generation using multiple cutting-tool sizes for 2-1/2D pocket machining
|
Veeramani, Dharmaraj |
|
2000 |
|
7 |
p. 661-675 |
artikel |
70 |
Data input model for virtual reality-aided facility layout
|
Zetu, Dan |
|
1998 |
|
7 |
p. 597-620 |
artikel |
71 |
Data input model for virtual reality-aided facility layout
|
DAN ZETU |
|
1998 |
|
7 |
p. 597-620 24 p. |
artikel |
72 |
Data input model for virtual reality-aided facility layout
|
Zetu, Dan |
|
1998 |
|
7 |
p. 597-620 |
artikel |
73 |
Demand point aggregation analysis for a class of constrained location models: a penalty function approach
|
Francis, Richard L. |
|
2004 |
|
7 |
p. 601-609 |
artikel |
74 |
Design for global manufacturing and assembly
|
Taylor, G. Don |
|
1997 |
|
7 |
p. 585-597 |
artikel |
75 |
Design for global manufacturing and assembly
|
G. DON TAYLOR |
|
1997 |
|
7 |
p. 585-597 13 p. |
artikel |
76 |
Design for global manufacturing and assembly
|
Taylor, G. Don |
|
1997 |
|
7 |
p. 585-597 |
artikel |
77 |
Design of collaboration framework for distributed CIM data activities
|
Kim, Chang-Ouk |
|
2001 |
|
7 |
p. 535-546 |
artikel |
78 |
Design of collaboration framework for distributed CIM data activities
|
Chang-Ouk Kim |
|
2001 |
|
7 |
p. 535-546 12 p. |
artikel |
79 |
Design of collaboration framework for distributed CIM data activities
|
Kim, Chang-Ouk |
|
2001 |
|
7 |
p. 535-546 |
artikel |
80 |
Design of flexible assembly line to minimize equipment cost
|
Bukchin, Joseph |
|
2000 |
|
7 |
p. 585-598 |
artikel |
81 |
Design of flexible assembly line to minimize equipment cost
|
Joseph Bukchin |
|
2000 |
|
7 |
p. 585-598 14 p. |
artikel |
82 |
Design of flexible assembly line to minimize equipment cost
|
Bukchin, Joseph |
|
2000 |
|
7 |
p. 585-598 |
artikel |
83 |
Design of product specifications and control policies in a single-stage production system
|
Kouikoglou, Vassilis S. |
|
2002 |
|
7 |
p. 591-600 |
artikel |
84 |
Design of product specifications and control policies in a singlestage production system
|
Vassilis S. Kouikoglou |
|
2002 |
|
7 |
p. 591-600 10 p. |
artikel |
85 |
Design of product specifications and control policies in a single-stage production system
|
Kouikoglou, Vassilis S. |
|
2002 |
|
7 |
p. 591-600 |
artikel |
86 |
Determining sequence and ready times in a remanufacturing system
|
Stanfield, Paul M. |
|
2006 |
|
7 |
p. 565-575 |
artikel |
87 |
Determining the Importance Weights for the Customer Requirements in QFD Using a Fuzzy AHP with an Extent Analysis Approach
|
Kwong, C. K. |
|
2003 |
|
7 |
p. 619-626 |
artikel |
88 |
Distribution-free multivariate process control based on log-linear modeling
|
Qiu, Peihua |
|
2008 |
|
7 |
p. 664-677 |
artikel |
89 |
Economic lot scheduling with lost sales and setup times
|
Faaland, Bruce H. |
|
2004 |
|
7 |
p. 629-640 |
artikel |
90 |
Erratum
|
|
|
2004 |
|
7 |
p. 709 |
artikel |
91 |
Evaluation of minimum zone for flatness by normal plane method and simplex search
|
Damodarasamy, Sampath |
|
1999 |
|
7 |
p. 617-626 |
artikel |
92 |
Evaluation of minimum zone for flatness by normal plane method and simplex search
|
SAMPATH DAMODARASAMY |
|
1999 |
|
7 |
p. 617-626 10 p. |
artikel |
93 |
Evaluation of minimum zone for flatness by normal plane method and simplex search
|
Damodarasamy, SAMPATH |
|
1999 |
|
7 |
p. 617-626 |
artikel |
94 |
Evaluation of virtual reality interface for product shape designs
|
Chu, Chi-Cheng P. |
|
1998 |
|
7 |
p. 629-643 |
artikel |
95 |
Evaluation of virtual reality interface for product shape designs
|
CHI-CHENG P. CHU |
|
1998 |
|
7 |
p. 629-643 15 p. |
artikel |
96 |
Evaluation of virtual reality interface for product shape designs
|
Chu, Chi-cheng P. |
|
1998 |
|
7 |
p. 629-643 |
artikel |
97 |
Facility location under uncertainty: a review
|
Snyder, Lawrence V. |
|
2006 |
|
7 |
p. 547-564 |
artikel |
98 |
Feature based quadrilateral mesh generation for sculptured surface products
|
Hocknell, Alan |
|
1999 |
|
7 |
p. 627-637 |
artikel |
99 |
Feature based quadrilateral mesh generation for sculptured surface products
|
ALAN HOCKNELL |
|
1999 |
|
7 |
p. 627-637 11 p. |
artikel |
100 |
Feature based quadrilateral mesh generation for sculptured surface products
|
Hocknell, ALAN |
|
1999 |
|
7 |
p. 627-637 |
artikel |
101 |
Forecasting service parts demand for a discontinued product
|
Hong, Jung Sik |
|
2008 |
|
7 |
p. 640-649 |
artikel |
102 |
Grouping and placement of machine cells
|
Heragu, Sunderesh S. |
|
1997 |
|
7 |
p. 561-571 |
artikel |
103 |
Grouping and placement of machine cells
|
SUNDERESH S. HERAGU |
|
1997 |
|
7 |
p. 561-571 11 p. |
artikel |
104 |
Grouping and placement of machine cells
|
Heragu, Sunderesh S. |
|
1997 |
|
7 |
p. 561-571 |
artikel |
105 |
Initial allocation compensation algorithm for redundancy allocation: The scanning heuristic
|
Ha, Chunghun |
|
2008 |
|
7 |
p. 678-689 |
artikel |
106 |
Intelligent agent modeling of an industrial warehousing problem
|
Kim, Byung-In |
|
2002 |
|
7 |
p. 601-612 |
artikel |
107 |
Intelligent agent modeling of an industrial warehousing problem
|
ByungIn Kim |
|
2002 |
|
7 |
p. 601-612 12 p. |
artikel |
108 |
Intelligent agent modeling of an industrial warehousing problem
|
Kim, Byung-In |
|
2002 |
|
7 |
p. 601-612 |
artikel |
109 |
Interactive simulation and visualization of massless, massed, and evaporating particles
|
Diachin, Darin |
|
1998 |
|
7 |
p. 621-628 |
artikel |
110 |
Interactive simulation and visualization of massless, massed, and evaporating particles
|
DARIN DIACHIN |
|
1998 |
|
7 |
p. 621-628 8 p. |
artikel |
111 |
Interactive simulation and visualization of massless, massed, and evaporating particles
|
Diachin, Darin |
|
1998 |
|
7 |
p. 621-628 |
artikel |
112 |
Landmark configuration for absolute positioning of autonomous vehicles
|
Sinriech, David |
|
2000 |
|
7 |
p. 613-624 |
artikel |
113 |
Landmark configuration for absolute positioning of autonomous vehicles
|
David Sinriech |
|
2000 |
|
7 |
p. 613-624 12 p. |
artikel |
114 |
Landmark configuration for absolute positioning of autonomous vehicles
|
Sinriech, David |
|
2000 |
|
7 |
p. 613-624 |
artikel |
115 |
Material Flow Systems in Manufacturing
|
Bhaba R. Sarker |
|
1997 |
|
7 |
p. 623-623 1 p. |
artikel |
116 |
Material Flow Systems in Manufacturing
|
Sarker, Bhaba R. |
|
1997 |
|
7 |
p. 623 |
artikel |
117 |
Minimization of acquisition and operational costs in horizontal material handling system design
|
Herrmann, J.W. |
|
1999 |
|
7 |
p. 679-693 |
artikel |
118 |
Minimization of acquisition and operational costs in horizontal material handling system design
|
J.W. HERRMANN |
|
1999 |
|
7 |
p. 679-693 15 p. |
artikel |
119 |
Minimization of acquisition and operational costs in horizontal material handling system design
|
Herrmann, J. W. |
|
1999 |
|
7 |
p. 679-693 |
artikel |
120 |
Modeling and analysis of a manufacturing cell formation problem with fuzzy mixed-integer programming
|
Tsai, Chang-Chun |
|
1997 |
|
7 |
p. 533-547 |
artikel |
121 |
Modeling and analysis of a manufacturing cell formation problem with fuzzy mixed-integer programming
|
CHANG-CHUN TSAI |
|
1997 |
|
7 |
p. 533-547 15 p. |
artikel |
122 |
Modeling and analysis of a manufacturing cell formation problem with fuzzy mixed-integer programming
|
Tsai, Chang-Chun |
|
1997 |
|
7 |
p. 533-547 |
artikel |
123 |
Modeling and analysis of an unreliable flow line composed of parallel-machine stages
|
Patchong, Alain |
|
2001 |
|
7 |
p. 559-568 |
artikel |
124 |
Modeling and analysis of an unreliable flow line composed of parallel-machine stages
|
Alain Patchong |
|
2001 |
|
7 |
p. 559-568 10 p. |
artikel |
125 |
Modeling and analysis of an unreliable flow line composed of parallel-machine stages
|
Patchong, Alain |
|
2001 |
|
7 |
p. 559-568 |
artikel |
126 |
Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control
|
Yang, Taho |
|
2002 |
|
7 |
p. 637-646 |
artikel |
127 |
Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control
|
Taho Yang |
|
2002 |
|
7 |
p. 637-646 10 p. |
artikel |
128 |
Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control
|
Yang, Taho |
|
2002 |
|
7 |
p. 637-646 |
artikel |
129 |
Multi-resource routing with flexible tasks: an application in drayage operations
|
Smilowitz, Karen |
|
2006 |
|
7 |
p. 577-590 |
artikel |
130 |
Noise smoothing for VR equipment in quaternions
|
Hsieh, C. C. |
|
1998 |
|
7 |
p. 581-587 |
artikel |
131 |
Noise smoothing for VR equipment in quaternions
|
C. C. HSIEH |
|
1998 |
|
7 |
p. 581-587 7 p. |
artikel |
132 |
Noise smoothing for VR equipment in quaternions
|
Hsieh, C. C. |
|
1998 |
|
7 |
p. 581-587 |
artikel |
133 |
On-line scheduling of multi-server batch operations
|
Van Der Zee, Durk-Jouke |
|
2001 |
|
7 |
p. 569-586 |
artikel |
134 |
On-line scheduling of multi-server batch operations
|
Durk-Jouke van der Zee |
|
2001 |
|
7 |
p. 569-586 18 p. |
artikel |
135 |
On-line scheduling of multi-server batch operations
|
van der Zee, Durk-Jouke |
|
2001 |
|
7 |
p. 569-586 |
artikel |
136 |
Optimal implementation and benefits of rolling inventory
|
Muriel, Ana |
|
2006 |
|
7 |
p. 591-603 |
artikel |
137 |
Optimizing dock configuration and staffing in decentralized receiving
|
Yano, Candace Arai |
|
1998 |
|
7 |
p. 657-668 |
artikel |
138 |
Optimizing dock configuration and staffing in decentralized receiving
|
CANDACE ARAI YANO |
|
1998 |
|
7 |
p. 657-668 12 p. |
artikel |
139 |
Optimizing dock configuration and staffing in decentralized receiving
|
Yano, Candace Arai |
|
1998 |
|
7 |
p. 657-668 |
artikel |
140 |
Order selection and scheduling with leadtime flexibility
|
Charnsirisakskul, Kasarin |
|
2004 |
|
7 |
p. 697-707 |
artikel |
141 |
Parallelism of continuous- and discrete-time production planning problems
|
Khmelnitsky, Eugene |
|
2004 |
|
7 |
p. 611-628 |
artikel |
142 |
Prescribing the Content and Timing of Product Upgrades
|
Wilhelm, Wilbert E. |
|
2003 |
|
7 |
p. 647-663 |
artikel |
143 |
Principles of Process Planning: A Logical Approach
|
Jian (John) Dong |
|
1997 |
|
7 |
p. 624-625 2 p. |
artikel |
144 |
Principles of Process Planning: A Logical Approach
|
Dong, Jian John |
|
1997 |
|
7 |
p. 624-625 |
artikel |
145 |
Production flow control in a cell with groups of identical machines
|
Maimon, Oded |
|
2000 |
|
7 |
p. 599-611 |
artikel |
146 |
Production flow control in a cell with groups of identical machines
|
Oded Maimon |
|
2000 |
|
7 |
p. 599-611 13 p. |
artikel |
147 |
Production flow control in a cell with groups of identical machines
|
Maimon, Oded |
|
2000 |
|
7 |
p. 599-611 |
artikel |
148 |
Production planning for flexible flow systems with limited machine flexibility
|
Lee, Heungsoon Felix |
|
1998 |
|
7 |
p. 669-684 |
artikel |
149 |
Production planning for flexible flow systems with limited machine flexibility
|
HEUNGSOON FELIX LEE |
|
1998 |
|
7 |
p. 669-684 16 p. |
artikel |
150 |
Production planning for flexible flow systems with limited machine flexibility
|
Lee, Heungsoon Felix |
|
1998 |
|
7 |
p. 669-684 |
artikel |
151 |
Product modeling within the framework of the World Wide Web
|
Roy, U. |
|
1999 |
|
7 |
p. 667-677 |
artikel |
152 |
Product modeling within the framework of the World Wide Web
|
U. ROY |
|
1999 |
|
7 |
p. 667-677 11 p. |
artikel |
153 |
Product modeling within the framework of the World Wide Web
|
Roy, U. |
|
1999 |
|
7 |
p. 667-677 |
artikel |
154 |
Replenishment planning in discrete-time, capacitated, non-stationary, stochastic inventory systems
|
Bollapragada, Ramesh |
|
2006 |
|
7 |
p. 605-617 |
artikel |
155 |
Review of: “Computer Integrated Manufacturing, From Concept” Roger Hannam
|
Sodhi, M. |
|
1998 |
|
7 |
p. 687-688 |
artikel |
156 |
Review of: “Facilities Design”Sunderesh Heragu
|
Egbelu, Pius J. |
|
1998 |
|
7 |
p. 686 |
artikel |
157 |
Review of:“Industrial Assembly” Shimon Y. Nof, Wilbert E. Wilhelm and Hans-Jurgen Warnecke Chapman & Hall
|
Dallery, Yves |
|
1998 |
|
7 |
p. 685 |
artikel |
158 |
Selecting the best system when systems are revealed sequentially
|
Hong, L. Jeff |
|
2007 |
|
7 |
p. 723-734 |
artikel |
159 |
Sensor-driven prognostic models for equipment replacement and spare parts inventory
|
Elwany, Alaa H. |
|
2008 |
|
7 |
p. 629-639 |
artikel |
160 |
Setup and fixture planning in automated process planning systems
|
Joneja, Ajay |
|
1999 |
|
7 |
p. 653-665 |
artikel |
161 |
Setup and fixture planning in automated process planning systems
|
AJAY JONEJA |
|
1999 |
|
7 |
p. 653-665 13 p. |
artikel |
162 |
Setup and fixture planning in automated process planning systems
|
Joneja, AJAY |
|
1999 |
|
7 |
p. 653-665 |
artikel |
163 |
Software Review
|
|
|
2000 |
|
7 |
p. 677-677 1 p. |
artikel |
164 |
Software Review
|
|
|
2000 |
|
7 |
p. 677 |
artikel |
165 |
Stability and performance of a double MEWMA controller for drifted MIMO systems
|
Lee, Shui-Pin |
|
2008 |
|
7 |
p. 690-705 |
artikel |
166 |
Stability and resource allocation in project planning
|
Leus, Roel |
|
2004 |
|
7 |
p. 667-682 |
artikel |
167 |
The impact of acceleration/deceleration on travel-time models in class-based automated S/R systems
|
Wen, U.P. |
|
2001 |
|
7 |
p. 599-608 |
artikel |
168 |
The impact of acceleration/deceleration on travel-time models in class-based automated S/R systems
|
U.P. Wen |
|
2001 |
|
7 |
p. 599-608 10 p. |
artikel |
169 |
The impact of acceleration/deceleration on travel-time models in class-based automated S/R systems
|
Wen, U.P. |
|
2001 |
|
7 |
p. 599-608 |
artikel |
170 |
The impact on rack configuration on the speed profile of the storage and retrieval machine
|
Chang, Ding-Tsair |
|
1997 |
|
7 |
p. 525-531 |
artikel |
171 |
The impact on rack configuration on the speed profile of the storage and retrieval machine
|
DING-TSAIR CHANG |
|
1997 |
|
7 |
p. 525-531 7 p. |
artikel |
172 |
The impact on rack configuration on the speed profile of the storage and retrieval machine
|
Chang, Ding-Tsair |
|
1997 |
|
7 |
p. 525-531 |
artikel |
173 |
The strip-packing problem for a boat manufacturing firm
|
Lee, Heungsoon Felix |
|
1999 |
|
7 |
p. 639-651 |
artikel |
174 |
The strip-packing problem for a boat manufacturing firm
|
HEUNGSOON FELIX LEE |
|
1999 |
|
7 |
p. 639-651 13 p. |
artikel |
175 |
The strip-packing problem for a boat manufacturing firm
|
Lee, HEUNGSOON FELIX |
|
1999 |
|
7 |
p. 639-651 |
artikel |
176 |
Two-echelon spare parts inventory system subject to a service constraint
|
Caglar, Deniz |
|
2004 |
|
7 |
p. 655-666 |
artikel |
177 |
Using Ant Techniques to Solve the Assembly Line Balancing Problem
|
McMullen, Patrick R. |
|
2003 |
|
7 |
p. 605-617 |
artikel |
178 |
Using tool life models to minimize processing time on a flexible machine
|
Lamond, Bernard F. |
|
1997 |
|
7 |
p. 611-621 |
artikel |
179 |
Using tool life models to minimize processing time on a flexible machine
|
BERNARD F. LAMOND |
|
1997 |
|
7 |
p. 611-621 11 p. |
artikel |
180 |
Using tool life models to minimize processing time on a flexible machine
|
Lamond, Bernard F. |
|
1997 |
|
7 |
p. 611-621 |
artikel |