nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A BAYESIAN PERSPECTIVE ON TAGUCHT'S APPROACH TO QUALITY ENGINEERING AND TOLERANCE DESIGN
|
Singpurwalla, Nozer D. |
|
1992 |
|
5 |
p. 18-31 |
artikel |
2 |
A cautious minimum variance controller with ARIMA disturbances
|
Apley, Daniel W. |
|
2004 |
|
5 |
p. 417-432 |
artikel |
3 |
A COMPARISON OF THE ANALYTIC HIERARCHY PROCESS WITH MULTIATTRIBUTE UTILITY THEORY: A CASE STUDY
|
Bard, Jonathan F. |
|
1992 |
|
5 |
p. 111-121 |
artikel |
4 |
A COUNTER-INTUITIVE ASPECT OF COMPONENT IMPORTANCE IN LINEAR CONSECUTIVE-k-OUT-OF-n SYSTEMS
|
Zakaria, R. S. |
|
1992 |
|
5 |
p. 147-154 |
artikel |
5 |
AGE-AND-TEST PROCEDURES FOR TRUE RELIABILITY IMPROVEMENT: FEASIBILITY AND ECONOMIC JUSTIFICATION
|
Barber, James S. |
|
1992 |
|
5 |
p. 81-87 |
artikel |
6 |
Agent-based project scheduling
|
Knotts, Gary |
|
2000 |
|
5 |
p. 387-401 |
artikel |
7 |
Agent-based project scheduling
|
Gary Knotts |
|
2000 |
|
5 |
p. 387-401 15 p. |
artikel |
8 |
Agent-based project scheduling
|
Knotts, Gary |
|
2000 |
|
5 |
p. 387-401 |
artikel |
9 |
A greedy algorithm to determine the number of transporters in a cyclic electroplating process
|
Armstrong, Ronald |
|
1996 |
|
5 |
p. 347-355 |
artikel |
10 |
Algorithms to determine the threshold reliability of flow networks
|
Jane, Chin-Chia |
|
2004 |
|
5 |
p. 469-479 |
artikel |
11 |
Allocation of bandwidth and storage
|
Chen, Bo |
|
2002 |
|
5 |
p. 501-507 |
artikel |
12 |
Allocation of bandwidth and storage
|
Bo Chen |
|
2002 |
|
5 |
p. 501-507 7 p. |
artikel |
13 |
Allocation of bandwidth and storage
|
Chen, Bo |
|
2002 |
|
5 |
p. 501-507 |
artikel |
14 |
A MODEL FOR ANALYSIS OF WORK SAMPLING STATISTICS
|
Pape, Elinor S. |
|
1992 |
|
5 |
p. 134-138 |
artikel |
15 |
Analysis of maintenance policies for M machines with deteriorating performance
|
Berk, Emre |
|
2000 |
|
5 |
p. 433-444 |
artikel |
16 |
Analysis of maintenance policies for M machines with deteriorating performance
|
Emre Berk |
|
2000 |
|
5 |
p. 433-444 12 p. |
artikel |
17 |
Analysis of maintenance policies for M machines with deteriorating performance
|
Berk, Emre |
|
2000 |
|
5 |
p. 433-444 |
artikel |
18 |
Analysis of supply contracts with total minimum commitment
|
Bassok, Yehuda |
|
1997 |
|
5 |
p. 373-381 |
artikel |
19 |
Analysis of supply contracts with total minimum commitment
|
YEHUDA BASSOK |
|
1997 |
|
5 |
p. 373-381 9 p. |
artikel |
20 |
Analysis of supply contracts with total minimum commitment
|
BASSOK , YEHUDA |
|
1997 |
|
5 |
p. 373-381 |
artikel |
21 |
An application of designing products and processes for supply chain management
|
Garg, Amit |
|
1999 |
|
5 |
p. 417-429 |
artikel |
22 |
An application of designing products and processes for supply chain management
|
AMIT GARG |
|
1999 |
|
5 |
p. 417-429 13 p. |
artikel |
23 |
An application of designing products and processes for supply chain management
|
Garg, AMIT |
|
1999 |
|
5 |
p. 417-429 |
artikel |
24 |
AN EMPIRICAL STUDY ON ANALYZING THE PRODUCTIVITY OF BANK BRANCHES
|
Oral, Muhittin |
|
1992 |
|
5 |
p. 166-176 |
artikel |
25 |
An exact algorithm for a workforce allocation problem with application to an analysis of cross-training policies
|
Brusco, Michael J. |
|
2008 |
|
5 |
p. 495-508 |
artikel |
26 |
An optimal path of a moving vehicle on a sphere
|
Kim, Seong-In |
|
1997 |
|
5 |
p. 383-389 |
artikel |
27 |
An optimal path of a moving vehicle on a sphere
|
SEONG-IN KIM |
|
1997 |
|
5 |
p. 383-389 7 p. |
artikel |
28 |
An optimal path of a moving vehicle on a sphere
|
KIM , SEONG-IN |
|
1997 |
|
5 |
p. 383-389 |
artikel |
29 |
An optimal procedure for solving the hierarchical network design problem
|
Obreque, Carlos |
|
2007 |
|
5 |
p. 513-524 |
artikel |
30 |
An optimization model for phased supplier integration into e-procurement systems
|
Talluri, Srinivas |
|
2006 |
|
5 |
p. 389-399 |
artikel |
31 |
An order batching algorithm for wave picking in a parallel-aisle warehouse
|
Gademann, A.J.R.M. |
|
2001 |
|
5 |
p. 385-398 |
artikel |
32 |
An order batching algorithm for wave picking in a parallel-aisle warehouse
|
A.J.R.M. (noud) Gademann |
|
2001 |
|
5 |
p. 385-398 14 p. |
artikel |
33 |
An order batching algorithm for wave picking in a parallel-aisle warehouse
|
Gademann, A.J.R.M. (noud) |
|
2001 |
|
5 |
p. 385-398 |
artikel |
34 |
A note on performance guarantees for sequencing three-stage flexible flowshops with identical machines to minimize makespan
|
Koulamas, Christos |
|
2007 |
|
5 |
p. 559-563 |
artikel |
35 |
A novel method for fitting unimodal continuous distributions on a bounded domain utilizing expert judgment estimates
|
Kotz, Samuel |
|
2006 |
|
5 |
p. 421-436 |
artikel |
36 |
AN OVERVIEW OF TAGUCHI METHOD AND NEWLY DEVELOPED STATISTICAL METHODS FOR ROBUST DESIGN
|
Tsui, Kwok-Leung |
|
1992 |
|
5 |
p. 44-57 |
artikel |
37 |
An upper bound on the weight-balanced testing procedure with multiple testers
|
Ben-Gal, Irad |
|
2004 |
|
5 |
p. 481-493 |
artikel |
38 |
Applying simulated annealing to the open shop scheduling problem
|
Liaw, Ching-Fang |
|
1999 |
|
5 |
p. 457-465 |
artikel |
39 |
Applying simulated annealing to the open shop scheduling problem
|
CHING-FANG LIAW |
|
1999 |
|
5 |
p. 457-465 9 p. |
artikel |
40 |
Applying simulated annealing to the open shop scheduling problem
|
Liaw, CHING-FANG |
|
1999 |
|
5 |
p. 457-465 |
artikel |
41 |
Approximation algorithms for common due date assignment and job scheduling on parallel machines
|
Xiao, Wen-Qiang |
|
2002 |
|
5 |
p. 466-477 |
artikel |
42 |
Approximation algorithms for common due date assignment and job scheduling on parallel machines
|
Wenqiang Xiao |
|
2002 |
|
5 |
p. 467-477 11 p. |
artikel |
43 |
Approximation algorithms for common due date assignment and job scheduling on parallel machines
|
Xiao, Wen-qiang |
|
2002 |
|
5 |
p. 467-477 |
artikel |
44 |
A problem space algorithm for single machine weighted tardiness problems
|
Avci, Selcuk |
|
2003 |
|
5 |
p. 479-486 |
artikel |
45 |
A Review of:“Operations Strategy: Text and Cases”, David A. Garvin, Prentice-Hall, 1992
|
Kennedy, W. J. |
|
1992 |
|
5 |
p. 179 |
artikel |
46 |
A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART II: SHOP-FLOOR CONTROL
|
Uzsoy, Reha |
|
1994 |
|
5 |
p. 44-55 |
artikel |
47 |
A Review of “Purchasing and Supply Management: Creating the Vision” Victor H. Pooler and David J. Pooler Chapman and Hall, 1997. 382 pp. ISBN 0 412 10601 9.
|
|
|
1999 |
|
5 |
p. 479-480 |
artikel |
48 |
A robust optimization approach for the capacitated vehicle routing problem with demand uncertainty
|
Sungur, Ilgaz |
|
2008 |
|
5 |
p. 509-523 |
artikel |
49 |
A simple linear heuristic for the service constrained random yield problem
|
Bassok, Yehuda |
|
2002 |
|
5 |
p. 479-487 |
artikel |
50 |
A simple linear heuristic for the service constrained random yield problem
|
Yehuda Bassok |
|
2002 |
|
5 |
p. 479-487 9 p. |
artikel |
51 |
A simple linear heuristic for the service constrained random yield problem
|
Bassok, Yehuda |
|
2002 |
|
5 |
p. 479-487 |
artikel |
52 |
A SIMULTANEOUS EQUATION MODEL OF COST/PERFORMANCE RELATIONSHIPS IN LARGE SCALE COMPUTING
|
Anderson, Evan E. |
|
1992 |
|
5 |
p. 155-165 |
artikel |
53 |
A single-product network design model with lead time and safety stock considerations
|
Sourirajan, Karthik |
|
2007 |
|
5 |
p. 411-424 |
artikel |
54 |
A solution to the hub center problem via a single-relocation algorithm with tabu search
|
Pamuk, F. Selcen |
|
2001 |
|
5 |
p. 399-411 |
artikel |
55 |
A solution to the hub center problem via a single-relocation algorithm with tabu search
|
F. Selcen Pamuk |
|
2001 |
|
5 |
p. 399-411 13 p. |
artikel |
56 |
A solution to the hub center problem via a single-relocation algorithm with tabu search
|
Pamuk, F. Selcen |
|
2001 |
|
5 |
p. 399-411 |
artikel |
57 |
A statistical computer experiments approach to airline fleet assignment
|
Pilla, Venkata L. |
|
2008 |
|
5 |
p. 524-537 |
artikel |
58 |
A structured procedure for analysis and design of order pick systems
|
Yoon, Chang S. |
|
1996 |
|
5 |
p. 379-389 |
artikel |
59 |
A STUDY OF SLIP POTENTIAL DURING CART PUSHING AND PULLING
|
Lee, K. S. |
|
1992 |
|
5 |
p. 139-146 |
artikel |
60 |
A survey on the resource-constrained project scheduling problem
|
Ozdamar, Linet |
|
1995 |
|
5 |
p. 574-586 |
artikel |
61 |
A time-window sliding procedure for driver-task assignment with random service times
|
Cheung, Raymond K. |
|
2003 |
|
5 |
p. 433-444 |
artikel |
62 |
A variable redefinition approach for the lot sizing problem with strong set-up interactions
|
Bhatia, Manish |
|
2001 |
|
5 |
p. 357-370 |
artikel |
63 |
A variable redefinition approach for the lot sizing problem with strong set-up interactions
|
Manish Bhatia |
|
2001 |
|
5 |
p. 357-370 14 p. |
artikel |
64 |
A variable redefinition approach for the lot sizing problem with strong set-up interactions
|
Bhatia, Manish |
|
2001 |
|
5 |
p. 357-370 |
artikel |
65 |
Batching and scheduling to minimize the makespan in the two-machine flowshop
|
Cheng, T. C. Edwin |
|
1998 |
|
5 |
p. 447-453 |
artikel |
66 |
Batching and scheduling to minimize the makespan in the two-machine flowshop
|
T.C. EDWIN CHENG |
|
1998 |
|
5 |
p. 447-453 7 p. |
artikel |
67 |
Batching and scheduling to minimize the makespan in the two-machine flowshop
|
Cheng, T.C. Edwin |
|
1998 |
|
5 |
p. 447-453 |
artikel |
68 |
BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST
|
Steiner, George |
|
1993 |
|
5 |
p. 90-97 |
artikel |
69 |
Capacitated, finish-to-order production planning with customer ordering day assignments
|
Dobson, Gregory |
|
2003 |
|
5 |
p. 445-455 |
artikel |
70 |
Constraint isomorphism and the generation of stochastic data
|
Munakata, Toshinori |
|
2006 |
|
5 |
p. 437-444 |
artikel |
71 |
Coordinating a three-level supply chain with quantity discounts
|
Munson, Charles L. |
|
2001 |
|
5 |
p. 371-384 |
artikel |
72 |
Coordinating a three-level supply chain with quantity discounts
|
Charles L. Munson |
|
2001 |
|
5 |
p. 371-384 14 p. |
artikel |
73 |
Coordinating a three-level supply chain with quantity discounts
|
Munson, Charles L. |
|
2001 |
|
5 |
p. 371-384 |
artikel |
74 |
Co-production models with random functionality yields
|
Gerchak, Yigal |
|
1996 |
|
5 |
p. 391-403 |
artikel |
75 |
Data Mining: Concepts, Models, Methods, and Algorithms
|
Liang, Ming |
|
2004 |
|
5 |
p. 495-496 |
artikel |
76 |
DEALER INVENTORY MANAGEMENT SYSTEMS
|
Ernst, Ricardo |
|
1993 |
|
5 |
p. 36-49 |
artikel |
77 |
Decentralized inventory control in a two-stage capacitated supply chain
|
JemaI, Zied |
|
2007 |
|
5 |
p. 501-512 |
artikel |
78 |
Design of Industrial Information Systems by Thomas O. Boucher and Ali Yalcin
|
Billo, Richard E. |
|
2008 |
|
5 |
p. 565-567 |
artikel |
79 |
DETERMINISTIC APPROXIMATIONS FOR INVENTORY MANAGEMENT AT SERVICE FACILITIES
|
Berman, Oded |
|
1993 |
|
5 |
p. 98-104 |
artikel |
80 |
Discount strategies for one-time-only sales
|
Arcelus, F.J. |
|
1995 |
|
5 |
p. 625-633 |
artikel |
81 |
DUAL SOURCING COST-OPTIMIZATION WITH UNRESTRICTED LEAD-TIME DISTRIBUTIONS AND ORDER-SPLIT PROPORTIONS
|
Lau, Hon-Shiang |
|
1994 |
|
5 |
p. 66-75 |
artikel |
82 |
Dynamic control of imperfect component production for assembly operations
|
Gutierrez, Genaro J. |
|
1995 |
|
5 |
p. 669-678 |
artikel |
83 |
Dynamic lot sizing with returning items and disposals
|
Beltran, Jose Luis |
|
2002 |
|
5 |
p. 437-448 |
artikel |
84 |
Dynamic lot sizing with returning items and disposals
|
José Luis Beltrán>\snm< |
|
2002 |
|
5 |
p. 437-448 12 p. |
artikel |
85 |
Dynamic lot sizing with returning items and disposals
|
Beltrán, José Luis |
|
2002 |
|
5 |
p. 437-448 |
artikel |
86 |
Economic design of a variable sampling rate EWMA chart
|
Park, Changsoon |
|
2004 |
|
5 |
p. 387-399 |
artikel |
87 |
Erratum
|
|
|
2001 |
|
5 |
p. 427 |
artikel |
88 |
Erratum
|
|
|
2001 |
|
5 |
p. 427 |
artikel |
89 |
Erratum
|
|
|
2001 |
|
5 |
p. 427-427 1 p. |
artikel |
90 |
Error bound for common due date assignment and job scheduling on parallel machines
|
Diamond, Jeffrey E. |
|
2000 |
|
5 |
p. 445-448 |
artikel |
91 |
Error bound for common due date assignment and job scheduling on parallel machines
|
Jeffrey E. Diamond |
|
2000 |
|
5 |
p. 445-448 4 p. |
artikel |
92 |
Error bound for common due date assignment and job scheduling on parallel machines
|
Diamond, Jeffrey E. |
|
2000 |
|
5 |
p. 445-448 |
artikel |
93 |
Error bound for the dynamic lot size model allowing speculative motive
|
Chen, Hsin-Der |
|
1995 |
|
5 |
p. 683-688 |
artikel |
94 |
Estimating flowtimes and setting due-dates in complex production systems
|
Lawrence, Stephen R. |
|
1995 |
|
5 |
p. 657-668 |
artikel |
95 |
ESTIMATING LIFE FUNCTIONS OF CHI DISTRIBUTION USING SELECTED ORDER STATISTICS
|
Ali, M. Masoom |
|
1992 |
|
5 |
p. 88-98 |
artikel |
96 |
Estimating the parameters of the weighted l p norm by linear regression
|
Brimberg, Jack |
|
1996 |
|
5 |
p. 363-367 |
artikel |
97 |
Finite-horizon equipment replacement analysis
|
Hartman, Joseph C. |
|
2006 |
|
5 |
p. 409-419 |
artikel |
98 |
Fleet management models and algorithms for an oil-tanker routing and scheduling problem
|
Sherali, Hanif D. |
|
1999 |
|
5 |
p. 395-406 |
artikel |
99 |
Fleet management models and algorithms for an oil-tanker routing and scheduling problem
|
HANIF D. SHERALI |
|
1999 |
|
5 |
p. 395-406 12 p. |
artikel |
100 |
Fleet management models and algorithms for an oil-tanker routing and scheduling problem
|
Sherali, HANIF D. |
|
1999 |
|
5 |
p. 395-406 |
artikel |
101 |
FOCUSED ISSUE ON SCHEDULING AND LOGISTICS POSITION STATEMENT
|
|
|
1993 |
|
5 |
p. 2-4 |
artikel |
102 |
Generalized preemption models for single-machine dynamic scheduling problems
|
Julien, Francois M. |
|
1997 |
|
5 |
p. 359-372 |
artikel |
103 |
Generalized preemption models for single-machine dynamic scheduling problems
|
FRANC¸OIS M. JULIEN |
|
1997 |
|
5 |
p. 359-372 14 p. |
artikel |
104 |
Generalized preemption models for single-machine dynamic scheduling problems
|
JULIEN , FRANC¸OIS M. |
|
1997 |
|
5 |
p. 359-372 |
artikel |
105 |
Global sourcing using local content tariff rules
|
Li, Yanzhi |
|
2007 |
|
5 |
p. 425-437 |
artikel |
106 |
Greedy heuristics for rapid scheduling of trains on a single track
|
Cai, X. |
|
1998 |
|
5 |
p. 481-493 |
artikel |
107 |
Greedy heuristics for rapid scheduling of trains on a single track
|
X. CAI |
|
1998 |
|
5 |
p. 481-493 13 p. |
artikel |
108 |
Greedy heuristics for rapid scheduling of trains on a single track
|
Cai, X. |
|
1998 |
|
5 |
p. 481-493 |
artikel |
109 |
Hoshin Kanri: Policy Development for Successful TQM, Akao, Yoji (Ed.), Productivity Press, Cambridge, MA
|
Smith, William A. |
|
1992 |
|
5 |
p. 177-178 |
artikel |
110 |
Human performance reliability: on-line assessment using fuzzy logic
|
Kolarik, William J. |
|
2004 |
|
5 |
p. 457-467 |
artikel |
111 |
Integrated maintenance and production control of a deteriorating production system
|
Iravani, Seyed M.R. |
|
2002 |
|
5 |
p. 423-435 |
artikel |
112 |
Integrated maintenance and production control of a deteriorating production system
|
Seyed M.R. Iravani |
|
2002 |
|
5 |
p. 423-435 13 p. |
artikel |
113 |
Integrated maintenance and production control of a deteriorating production system
|
Iravani, Seyed M.R. |
|
2002 |
|
5 |
p. 423-435 |
artikel |
114 |
Inventory and lead time planning with lead-time-sensitive demand
|
Yang, Bibo |
|
2007 |
|
5 |
p. 439-452 |
artikel |
115 |
Joint inventory-and-pricing strategy for a stochastic continuous-review system
|
Chao, Xiuli |
|
2006 |
|
5 |
p. 401-408 |
artikel |
116 |
Joint optimization of maintenance and inventory policies for a simple system
|
Armstrong, Michael J. |
|
1996 |
|
5 |
p. 415-424 |
artikel |
117 |
Large-scale classroom scheduling
|
Mooney, Edward L. |
|
1996 |
|
5 |
p. 369-378 |
artikel |
118 |
Multi-objective scheduling problems: Determination of pruned Pareto sets
|
Taboada, Heidi A. |
|
2008 |
|
5 |
p. 552-564 |
artikel |
119 |
MULTIPLE-SHIFT WORKFORCE SCHEDULING UNDER THE 3-4 COMPRESSED WORKWEEK WITH A HIERARCHICAL WORKFORCE
|
Hung, Rudy |
|
1993 |
|
5 |
p. 82-89 |
artikel |
120 |
Multiresponse systems optimization using a goal attainment approach
|
Xu, Kai |
|
2004 |
|
5 |
p. 433-445 |
artikel |
121 |
NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
|
Drexl, Andreas |
|
1993 |
|
5 |
p. 74-81 |
artikel |
122 |
OFF-LINE QUALITY CONTROL IN ELECTRONICS ASSEMBLY: IDENTIFYING THE CRITICAL PROBLEM
|
Albin, Susan L. |
|
1992 |
|
5 |
p. 58-65 |
artikel |
123 |
On assemble-to-order systems with flexible customers
|
Iravani, S. M. R. |
|
2003 |
|
5 |
p. 389-403 |
artikel |
124 |
On production batches, transfer batches, and lead times
|
Benjaafar, Saifallah |
|
1996 |
|
5 |
p. 357-362 |
artikel |
125 |
On the allocation of uncertainty-reduction effort to minimize total variability
|
Gerchak, Yigal |
|
2000 |
|
5 |
p. 403-407 |
artikel |
126 |
On the allocation of uncertainty-reduction effort to minimize total variability
|
Yigal Gerchak |
|
2000 |
|
5 |
p. 403-407 5 p. |
artikel |
127 |
On the allocation of uncertainty-reduction effort to minimize total variability
|
Gerchak, Yigal |
|
2000 |
|
5 |
p. 403-407 |
artikel |
128 |
On the newsboy model with a cutoff transaction size
|
Dekker, R. |
|
2000 |
|
5 |
p. 461-469 |
artikel |
129 |
On the newsboy model with a cutoff transaction size
|
R. Dekker |
|
2000 |
|
5 |
p. 461-469 9 p. |
artikel |
130 |
On the newsboy model with a cutoff transaction size
|
Dekker, R. |
|
2000 |
|
5 |
p. 461-469 |
artikel |
131 |
ON THE USE OF BUFFER INVENTORIES TO MINIMIZE COSTS WITH AN UNRELIABLE MACHINE
|
Klastorin, T. D. |
|
1993 |
|
5 |
p. 50-62 |
artikel |
132 |
Optimal and heuristic algorithms for the multi-location dynamic transshipment problem with fixed transshipment costs
|
Herer, Yale T. |
|
2003 |
|
5 |
p. 419-432 |
artikel |
133 |
OPTIMAL BURN-IN SIMULATION ON HIGHLY INTEGRATED CIRCUIT SYSTEMS
|
Chien, Wei-Ting Kary |
|
1992 |
|
5 |
p. 33-43 |
artikel |
134 |
Optimal design of the two-level distributed network with dual homing local connections
|
Kim, Hyun-Joon |
|
1995 |
|
5 |
p. 555-563 |
artikel |
135 |
OPTIMAL INVENTORY POLICY FOR PERISHABLE ITEMS WITH TIME PROPORTIONAL DEMAND
|
Xu, Haiping |
|
1992 |
|
5 |
p. 105-110 |
artikel |
136 |
Optimal production run length and inspection schedules in a deteriorating production process
|
Kim, Chang Hyun |
|
2001 |
|
5 |
p. 421-426 |
artikel |
137 |
Optimal production run length and inspection schedules in a deteriorating production process
|
Chang Hyun Kim |
|
2001 |
|
5 |
p. 421-426 6 p. |
artikel |
138 |
Optimal production run length and inspection schedules in a deteriorating production process
|
Kim, Chang Hyun |
|
2001 |
|
5 |
p. 421-426 |
artikel |
139 |
Optimal routing in an automated storage/retrieval system with dedicated storage
|
BERG, JEROEN P. van den |
|
1999 |
|
5 |
p. 407-415 |
artikel |
140 |
Optimal routing in an automated storage/retrieval system with dedicated storage
|
JEROEN P. van den BERG |
|
1999 |
|
5 |
p. 407-415 9 p. |
artikel |
141 |
Optimal routing in an automated storage/retrieval system with dedicated storage
|
van den BERG, JEROEN P. |
|
1999 |
|
5 |
p. 407-415 |
artikel |
142 |
Optimal specialization of a maintenance workforce
|
Dietz, Dennis C. |
|
1997 |
|
5 |
p. 423-433 |
artikel |
143 |
Optimal specialization of a maintenance workforce
|
DENNIS C. DIETZ |
|
1997 |
|
5 |
p. 423-433 11 p. |
artikel |
144 |
Optimal specialization of a maintenance workforce
|
DIETZ , DENNIS C. |
|
1997 |
|
5 |
p. 423-433 |
artikel |
145 |
Optimization-based planning for the stochastic lot-scheduling problem
|
Sox, Charles R. |
|
1997 |
|
5 |
p. 349-357 |
artikel |
146 |
Optimization-based planning for the stochastic lot-scheduling problem
|
CHARLES R. SOX |
|
1997 |
|
5 |
p. 349-357 9 p. |
artikel |
147 |
Optimization-based planning for the stochastic lot-scheduling problem
|
SOX , CHARLES R. |
|
1997 |
|
5 |
p. 349-357 |
artikel |
148 |
Optimization design of control chart systems
|
Wu, Zhang |
|
2004 |
|
5 |
p. 447-455 |
artikel |
149 |
Overplanning factor in Toyota's formula for computing the number of kanban
|
Co, Henry C. |
|
1997 |
|
5 |
p. 409-415 |
artikel |
150 |
Overplanning factor in Toyotas formula for computing the number of kanban
|
HENRY C. CO |
|
1997 |
|
5 |
p. 409-415 7 p. |
artikel |
151 |
Overplanning factor in Toyota's formula for computing the number of kanban
|
CO , HENRY C. |
|
1997 |
|
5 |
p. 409-415 |
artikel |
152 |
PARALLEL-MACHINE SCHEDULING WITH FRACTIONAL OPERATOR REQUIREMENTS
|
Bourland, Karla E. |
|
1994 |
|
5 |
p. 56-65 |
artikel |
153 |
Performance measures of a make-to-order inventory-production system
|
He, Qi-Ming |
|
2000 |
|
5 |
p. 409-419 |
artikel |
154 |
Performance measures of a make-to-orderinventory-production system
|
Qi-Ming He |
|
2000 |
|
5 |
p. 409-419 11 p. |
artikel |
155 |
Performance measures of a make-to-orderinventory-production system
|
He, Qi-Ming |
|
2000 |
|
5 |
p. 409-419 |
artikel |
156 |
PERFORMANCE OF A MYOPIC LOT SIZE POLICY WITH LEARNING IN SETUPS
|
Rachamadugu, Ram |
|
1994 |
|
5 |
p. 85-91 |
artikel |
157 |
PLANNING TIMELY ARRIVALS TO A STOCHASTIC PRODUCTION OR SERVICE SYSTEM
|
Liao, Chtng-Jong |
|
1993 |
|
5 |
p. 63-73 |
artikel |
158 |
Policy and cost approximations of two-echelon distribution systems with a procurement cost at the higher echelon
|
Matta, Khalil F. |
|
1995 |
|
5 |
p. 646-656 |
artikel |
159 |
Probabilistic asymptotic analysis of stochastic online scheduling problems
|
Chen, Gang |
|
2007 |
|
5 |
p. 525-538 |
artikel |
160 |
PRODUCTION CONTROL FOR A TANDEM TWO-MACHINE SYSTEM
|
Van Ryzin, Garrett |
|
1993 |
|
5 |
p. 5-20 |
artikel |
161 |
Production, operating risk and market uncertainty: a valuation perspective on controlled policies
|
Kamrad, Bardia |
|
1998 |
|
5 |
p. 455-468 |
artikel |
162 |
Production, operating risk and market uncertainty: a valuation perspective on controlled policies
|
BARDIA KAMRAD |
|
1998 |
|
5 |
p. 455-468 14 p. |
artikel |
163 |
Production, operating risk and market uncertainty: a valuation perspective on controlled policies
|
Kamrad, Bardia |
|
1998 |
|
5 |
p. 455-468 |
artikel |
164 |
PRODUCTION PLANNING DECISIONS IN FLEXIBLE MANUFACTURING SYSTEMS WITH RANDOM MATERIAL FLOWS
|
Stecke, Kathryn E. |
|
1994 |
|
5 |
p. 2-17 |
artikel |
165 |
PRODUCTION SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM WITH SETUPS
|
Ghosh, Soumen |
|
1993 |
|
5 |
p. 21-35 |
artikel |
166 |
Production scheduling in almost continuous time
|
Gue, Kevin R. |
|
1997 |
|
5 |
p. 391-398 |
artikel |
167 |
Production scheduling in almost continuous time
|
KEVIN R. GUE |
|
1997 |
|
5 |
p. 391-398 8 p. |
artikel |
168 |
Production scheduling in almost continuous time
|
GUE , KEVIN R. |
|
1997 |
|
5 |
p. 391-398 |
artikel |
169 |
Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
|
Dessouky, Maged M. |
|
1997 |
|
5 |
p. 399-408 |
artikel |
170 |
Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
|
MAGED M. DESSOUKY |
|
1997 |
|
5 |
p. 399-408 10 p. |
artikel |
171 |
Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
|
DESSOUKY , MAGED M. |
|
1997 |
|
5 |
p. 399-408 |
artikel |
172 |
Projects with sequential iteration: Models and complexity
|
Banerjee, Arunava |
|
2007 |
|
5 |
p. 453-463 |
artikel |
173 |
Purchasing and Supply Management: Creating the Vision
|
|
|
1999 |
|
5 |
p. 479-480 2 p. |
artikel |
174 |
Purchasing and Supply Management: Creating the Vision
|
|
|
1999 |
|
5 |
p. 479-480 |
artikel |
175 |
QUALITY CONTROL AND ITS APPLICATIONS IN PRODUCTION SYSTEMS
|
Elsayed, E. A. |
|
1992 |
|
5 |
p. 2-3 |
artikel |
176 |
Quantity discounts in single-period supply contracts with asymmetric demand information
|
Burnetas, Apostolos |
|
2007 |
|
5 |
p. 465-479 |
artikel |
177 |
Queueing Networks and Markov Chains, 2nd Edition by G. Bolch, S. Greiner, H. de Meer, and K.S. Trivedi
|
Krieger, Udo R. |
|
2008 |
|
5 |
p. 567-568 |
artikel |
178 |
Recursive linear control of order release to manufacturing cells with random yield
|
Quintana, Rolando |
|
2002 |
|
5 |
p. 489-500 |
artikel |
179 |
Recursive linear control of order release to manufacturing cells with random yield
|
Rolando Quintana |
|
2002 |
|
5 |
p. 489-500 12 p. |
artikel |
180 |
Recursive linear control of order release to manufacturing cells with random yield
|
Quintana, Rolando |
|
2002 |
|
5 |
p. 489-500 |
artikel |
181 |
ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPS
|
Leon, V. Jorge |
|
1994 |
|
5 |
p. 32-43 |
artikel |
182 |
Robust scheduling of a two-machine flow shop with uncertain processing times
|
Kouvelis, Panos |
|
2000 |
|
5 |
p. 421-432 |
artikel |
183 |
Robust scheduling of a two-machine flow shop with uncertain processing times
|
Panos Kouvelis |
|
2000 |
|
5 |
p. 421-432 12 p. |
artikel |
184 |
Robust scheduling of a two-machine flow shop with uncertain processing times
|
Kouvelis, Panos |
|
2000 |
|
5 |
p. 421-432 |
artikel |
185 |
Routing orderpickers in a warehouse: a comparison between optimal and heuristic solutions
|
De Koster, Rene |
|
1998 |
|
5 |
p. 469-480 |
artikel |
186 |
Routing orderpickers in a warehouse: a comparison between optimal and heuristic solutions
|
RENÉ DE KOSTER |
|
1998 |
|
5 |
p. 469-480 12 p. |
artikel |
187 |
Routing orderpickers in a warehouse: a comparison between optimal and heuristic solutions
|
Koster, RenÉ De |
|
1998 |
|
5 |
p. 469-480 |
artikel |
188 |
SCHEDULING A SINGLE MACHINE TO MINIMIZE TWO CRITERIA: MAXIMUM TARDINESS AND NUMBER OF TARDY JOBS
|
Chen, Chuen-Lung |
|
1994 |
|
5 |
p. 76-84 |
artikel |
189 |
Scheduling jobs with proportionate early/tardy penalties
|
Rachamadugu, Ram |
|
1995 |
|
5 |
p. 679-682 |
artikel |
190 |
Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems
|
Bai, S.X. |
|
1995 |
|
5 |
p. 599-617 |
artikel |
191 |
Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems
|
Bai, S.X. |
|
1995 |
|
5 |
p. 618-624 |
artikel |
192 |
Scheduling one and two-processor tasks on two parallel processors
|
Lee, Chung-Yee |
|
1999 |
|
5 |
p. 445-455 |
artikel |
193 |
Scheduling one and two-processor tasks on two parallel processors
|
CHUNG-YEE LEE |
|
1999 |
|
5 |
p. 445-455 11 p. |
artikel |
194 |
Scheduling one and two-processor tasks on two parallel processors
|
Lee, CHUNG-YEE |
|
1999 |
|
5 |
p. 445-455 |
artikel |
195 |
Scheduling operations on parallel machine tools
|
Norman, Bryan A. |
|
2000 |
|
5 |
p. 449-459 |
artikel |
196 |
Scheduling operations on parallel machine tools
|
Bryan A. Norman |
|
2000 |
|
5 |
p. 449-460 12 p. |
artikel |
197 |
Scheduling operations on parallel machine tools
|
Norman, Bryan A. |
|
2000 |
|
5 |
p. 449-460 |
artikel |
198 |
Scheduling two job classes on parallel machines
|
Cheng, T.C.E. |
|
1995 |
|
5 |
p. 689-693 |
artikel |
199 |
Scheduling with multiple-job-on-one-processor pattern
|
Li, Chung-Lun |
|
1998 |
|
5 |
p. 433-445 |
artikel |
200 |
Scheduling with multiple-job-on-one-processor pattern
|
CHUNG-LUN LI |
|
1998 |
|
5 |
p. 433-445 13 p. |
artikel |
201 |
Scheduling with multiple-job-on-one-processor pattern
|
Li, Chung-lun |
|
1998 |
|
5 |
p. 433-445 |
artikel |
202 |
Scope versus focus: issues of flexibility, capacity, and number of production facilities
|
Benjaafar, Saifallah |
|
1998 |
|
5 |
p. 413-425 |
artikel |
203 |
Scope versus focus: issues of flexibility, capacity, and number of production facilities
|
SAIFALLAH BENJAAFAR |
|
1998 |
|
5 |
p. 413-425 13 p. |
artikel |
204 |
Scope versus focus: issues of flexibility, capacity, and number of production facilities
|
Benjaafar, Saifallah |
|
1998 |
|
5 |
p. 413-425 |
artikel |
205 |
SeDFAM: semiconductor demand forecast accuracy model
|
Cakanyildirim, Metin |
|
2002 |
|
5 |
p. 449-465 |
artikel |
206 |
SeDFAM semiconductor demand forecast accuracy model
|
Metin Çakanyildirim |
|
2002 |
|
5 |
p. 449-465 17 p. |
artikel |
207 |
SeDFAM: semiconductor demand forecast accuracy model
|
Çakanyildirim, Metin |
|
2002 |
|
5 |
p. 449-465 |
artikel |
208 |
Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan
|
Soewandi, Hanijanto |
|
2003 |
|
5 |
p. 467-477 |
artikel |
209 |
Setting safety lead-times for purchased components in assembly systems: a general solution procedure
|
Shore, Haim |
|
1995 |
|
5 |
p. 638-645 |
artikel |
210 |
SIMULATION METAMODELS OF SYSTEM AVAILABILITY AND OPTIMUM SPARE AND REPAIR UNITS
|
Madu, Christian N. |
|
1992 |
|
5 |
p. 99-104 |
artikel |
211 |
Simultaneous resource scheduling with batching to minimize weighted flow times
|
Dobson, Gregory |
|
1995 |
|
5 |
p. 587-598 |
artikel |
212 |
Single machine batch scheduling with sequential job processing
|
Cheng, T.C.E. |
|
2001 |
|
5 |
p. 413-420 |
artikel |
213 |
Single machine batch scheduling with sequential job processing
|
T.C.E. Cheng |
|
2001 |
|
5 |
p. 413-420 8 p. |
artikel |
214 |
Single machine batch scheduling with sequential job processing
|
Cheng, T.C.E. |
|
2001 |
|
5 |
p. 413-420 |
artikel |
215 |
Single-machine lot-sizing with uniform yields and rigid demands: robustness of the optimal solution
|
Anily, Shoshana |
|
1995 |
|
5 |
p. 634-637 |
artikel |
216 |
Single operation earliness—tardiness scheduling with machine activation costs
|
Panwalkar, Shrikant S. |
|
2002 |
|
5 |
p. 509-513 |
artikel |
217 |
Single operation earlinesstardiness scheduling with machine activation costs
|
Shrikant S. Panwalkar |
|
2002 |
|
5 |
p. 509-513 5 p. |
artikel |
218 |
Single operation earliness–tardiness scheduling with machine activation costs
|
Panwalkar, Shrikant S. |
|
2002 |
|
5 |
p. 509-513 |
artikel |
219 |
Statistical process control via context modeling of finite-state processes: an application to production monitoring
|
Ben-Gal, Irad |
|
2004 |
|
5 |
p. 401-415 |
artikel |
220 |
THE COST OF FOLLOWING THE OPTIMAL INVENTORY POLICY
|
Robinson, Lawrence W. |
|
1993 |
|
5 |
p. 105-108 |
artikel |
221 |
The effects of work-in-process inventory costs on the design and scheduling of assembly lines with low throughput and high component costs
|
Rosenblatt, Meir J. |
|
1996 |
|
5 |
p. 405-414 |
artikel |
222 |
The impact of increasing user expectations on machine replacement
|
Marsh, Robert F. |
|
2003 |
|
5 |
p. 457-466 |
artikel |
223 |
The impact of priority rule combinations on lateness and tardiness
|
Barman, Samir |
|
1998 |
|
5 |
p. 495-504 |
artikel |
224 |
The impact of priority rule combinations on lateness and tardiness
|
SAMIR BARMAN |
|
1998 |
|
5 |
p. 495-504 10 p. |
artikel |
225 |
The impact of priority rule combinations on lateness and tardiness
|
Barman, Samir |
|
1998 |
|
5 |
p. 495-504 |
artikel |
226 |
The multiple lot sizing problem with rigid demand and interrupted geometric yield
|
Zhang, Alex X. |
|
1998 |
|
5 |
p. 427-431 |
artikel |
227 |
The multiple lot sizing problem with rigid demand and interrupted geometric yield
|
ALEX X. ZHANG |
|
1998 |
|
5 |
p. 427-431 5 p. |
artikel |
228 |
The multiple lot sizing problem with rigid demand and interrupted geometric yield
|
Zhang, Alex X. |
|
1998 |
|
5 |
p. 427-431 |
artikel |
229 |
The newsboy problem with multiple demand classes
|
Sen, Alper |
|
1999 |
|
5 |
p. 431-444 |
artikel |
230 |
The newsboy problem with multiple demand classes
|
ALPER EN |
|
1999 |
|
5 |
p. 431-444 14 p. |
artikel |
231 |
The newsboy problem with multiple demand classes
|
ŞEN, ALPER |
|
1999 |
|
5 |
p. 431-444 |
artikel |
232 |
The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times
|
Shabtay, Dvir |
|
2007 |
|
5 |
p. 539-557 |
artikel |
233 |
THE OPTIMUM SPEED OF VISUAL INSPECTION USING A RANDOM SEARCH STRATEGY
|
Morawski, Thomas B. |
|
1992 |
|
5 |
p. 122-133 |
artikel |
234 |
The performance of rolling production schedules in a process industry
|
De Matta, Renato |
|
1995 |
|
5 |
p. 564-573 |
artikel |
235 |
The product cycling problem under increasing yield rates
|
Bourland, Karla E. |
|
1997 |
|
5 |
p. 417-422 |
artikel |
236 |
The product cycling problem under increasing yield rates
|
KARLA E. BOURLAND |
|
1997 |
|
5 |
p. 417-422 6 p. |
artikel |
237 |
The product cycling problem under increasing yield rates
|
BOURLAND , KARLA E. |
|
1997 |
|
5 |
p. 417-422 |
artikel |
238 |
The two-machine stochastic flowshop problem with arbitrary processing time distributions
|
Elmaghraby, Salah E. |
|
1999 |
|
5 |
p. 467-477 |
artikel |
239 |
The two-machine stochastic flowshop problem with arbitrary processing time distributions
|
SALAH E. ELMAGHRABY |
|
1999 |
|
5 |
p. 467-477 11 p. |
artikel |
240 |
The two-machine stochastic flowshop problem with arbitrary processing time distributions
|
Elmaghraby, SALAH E. |
|
1999 |
|
5 |
p. 467-477 |
artikel |
241 |
THE USE OF STATISTICAL PROCESS CONTROL AND DESIGN OF EXPERIMENTS IN PRODUCT AND PROCESS IMPROVEMENT
|
Montgomery, Douglas C. |
|
1992 |
|
5 |
p. 4-17 |
artikel |
242 |
TIME-SERIES INVESTIGATION OF SUBSAMPLE MEAN CHARTS
|
Alwan, Layth C. |
|
1992 |
|
5 |
p. 66-80 |
artikel |
243 |
Tool handling and scheduling in a two-machine flexible manufacturing cell
|
Agnetis, Alessandro |
|
1996 |
|
5 |
p. 425-437 |
artikel |
244 |
Total WIP and WIP mix for a CONWIP controlled job shop
|
Ryan, Sarah M. |
|
2003 |
|
5 |
p. 405-418 |
artikel |
245 |
Value of a put option to the risk-averse newsvendor
|
Chen, Frank |
|
2007 |
|
5 |
p. 481-500 |
artikel |
246 |
VARIABILITY IN ASSEMBLY AND COMPETING SYSTEMS: EFFECT ON PERFORMANCE AND RECOVERY
|
Bhatnagar, Rohit |
|
1994 |
|
5 |
p. 18-31 |
artikel |
247 |
Variance reduction techniques: Experimental comparison and analysis for single systems
|
Sabuncuoglu, Ihsan |
|
2008 |
|
5 |
p. 538-551 |
artikel |